Outline planning application for the construction of a maximum of 265 dwellings with associated car parking; access; infrastructure provision and open space, not in accordance with condition 7 Part i, ii, iii of permission Ref. W/12/02336/OU with regards to the widening of Pulley Lane under a consent order/mitigation plan; increasing the number of occupations to 90 dwellings before improvements to the Pulley Lane / A38 junction and increase the number of occupations from 75 to 90 dwellings before improvements to pedestrian links between the eastern boundary through to Nightingale Close; Jackdaw Lane and to Tagwell Road.
Land North Of Pulley Lane And Newland Lane Newland Droitwich Spa
Droitwich South East Ward - Pre 01/05/23, Lovett and North Claines Ward - Pre 01/05/23
Parish
Droitwich Spa , Salwarpe
Documents
17 published
Proposal
Outline planning application for the construction of a maximum of 265 dwellings with associated car parking; access; infrastructure provision and open space, not in accordance with condition 7 Part i, ii, iii of permission Ref. W/12/02336/OU with regards to the widening of Pulley Lane under a consent order/mitigation plan; increasing the number of occupations to 90 dwellings before improvements to the Pulley Lane / A38 junction and increase the number of occupations from 75 to 90 dwellings before improvements to pedestrian links between the eastern boundary through to Nightingale Close; Jackdaw Lane and to Tagwell Road.
Reference
17/00169/OU
Ward
Droitwich South East Ward - Pre 01/05/23, Lovett and North Claines Ward - Pre 01/05/23
Parish
Droitwich Spa , Salwarpe
Agent
Persimmon Homes Ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.