Council planning record

OUTLINE APPLICATION FOR ERECTION OF UP TO 900 DWELLINGS (APPEARANCE, LANDSCAPING, LAYOUT AND SCALE RESERVED)

LAND AT ERLAS PARK, CEFN ROAD, WREXHAM, LL13 9TT

Ymgynghori ar hyn o bryd / Under ConsultationReference: P/2025/0427Wrexham County Borough Council

Last published check: 31 Oct 2026, 19:55. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Valid date

    Published milestoneCouncil source
  3. Application expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Ymgynghori ar hyn o bryd / Under Consultation
Application type
Caniatâd cynllunio amlinellol: Rhai materion a gadwyd yn ôl / Outline planning permission: Some matters reserved
Received
21 May 2025
Validated
21 May 2025
Determination deadline
30 Jun 2026
Local authority
Wrexham County Borough Council

Application overview

OUTLINE APPLICATION FOR ERECTION OF UP TO 900 DWELLINGS (APPEARANCE, LANDSCAPING, LAYOUT AND SCALE RESERVED)

Proposal details

Reference
P/2025/0427
Ward
Holt/Holt
Parish
Abenbury/Abenbury

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

LAND AT ERLAS PARK, CEFN ROAD, WREXHAM, LL13 9TT

This record has no verified map location.

Documents 149 of 149

DocumentPublishedAction
Appendix 6.2 784-B024030-TTE-00-XX-DR-UD-41-P04-Phasing planProposed Plans · PDF22 May 2025View
Agricultural Land ClassificationPlanning · PDF22 May 2025View
Access PlansProposed Plans · PDF22 May 2025View
Site boundary planPlanning · PDF22 May 2025View
Welsh Water Consultation ResponseConsultation Response · PDF23 Jun 2025View
Figure 8.1- Designated Assets 16Jan25dfPlanning · PDF22 May 2025View
Appendix 11.1 Legislation, Policy and GuidancePlanning · PDF22 May 2025View
784-B024030-TTE-00-XX-DR-UD-3D-P04-Site location plan with access.pdfPlanning · PDF21 May 2025View
Sustainability StatementPlanning · PDF22 May 2025View
Appendix 7.6 Chapter 7 Ecology - Great Crested Newt SurveyPlanning · PDF22 May 2025View
784-B024030-TTE-00-XX-DR-UD-47-P03-Illustrative layoutProposed Plans · PDF22 May 2025View
Aboricultural Impact AssessmentPlanning · PDF22 May 2025View
Education Impact Assessment v4.2 inc appendicesPlanning · PDF22 May 2025View
J10 - Notice Letter - WCBC Highways - 190525_RedactedPlanning · PDF29 May 2025View
Landscape and Visual AssessmentPlanning · PDF22 May 2025View
Chapter 4 AlternativesPlanning · PDF22 May 2025View
Public Rights of Way responseConsultation Response · PDF16 Jun 2025View
Chapter 8 Cultural HeritagePlanning · PDF22 May 2025View
Appendix 6.3 784-B024030-TTE-00-XX-DR-UD-47-P03-Illustrative masterplanProposed Plans · PDF22 May 2025View
Figure 6.2 13539_P02d_Site context planPlanning · PDF22 May 2025View
Appendix 8.4 Archaeological SurveyPlanning · PDF22 May 2025View
Appendix 11.3 Baseline Noise MonitoringPlanning · PDF22 May 2025View
784-B024030-TTE-00-XX-DR-UD-03-P05-Site location planPlanning · PDF22 May 2025View
Appendix 14.1 Prior Extraction Statement Jan 2025Proposed Plans · PDF22 May 2025View
784-B024030-TTE-00-XX-DR-UD-40-P05-Strategic masterplanPlanning · PDF22 May 2025View
784-B024030-15D-Design and Access Statement 140425Planning · PDF22 May 2025View
Figure 6.7 13539_P07e_PhotoviewpointsPlanning · PDF22 May 2025View
Chapter 5 Proposed DevelopmentProposed Plans · PDF22 May 2025View
Chapter 14 MineralsPlanning · PDF22 May 2025View
Appendix 7.7 13539_Great Crested Newts SurveyResults_P04_LJPlanning · PDF22 May 2025View
Figure 11.1 Site Location, Receptors, Monitoring PositionsPlanning · PDF22 May 2025View
Appendix 12.1 Flood Consequence ReportPlanning · PDF22 May 2025View
Archaeological Trenching Evaluation ReportPlanning · PDF22 May 2025View
784-B024030-TTE-00-XX-DR-UD-41-P04-Phasing planProposed Plans · PDF22 May 2025View
Figure 8.2 Non-Designated Assets 16Jan25dfPlanning · PDF22 May 2025View
Prior Extraction Statement Jan 2025Proposed Plans · PDF22 May 2025View
Appendix 10.2_ADMS_Parameters_27032024Planning · PDF22 May 2025View
Chapter 2 ApproachPlanning · PDF22 May 2025View
Appendix 8.2 B024030 Archaeological Desk-Based Assessment 12Jan21-reducedPlanning · PDF22 May 2025View
Geophysical Survey ReportPlanning · PDF22 May 2025View
Appendix 7.10 Chapter 7 Ecology- Bat SurveysPlanning · PDF22 May 2025View
784-B024030-TTE-00-XX-DR-UD-04-P04-Site Plan with topo plan.pdfPlanning · PDF21 May 2025View
Appendix 6.1 784-B024030-TTE-00-XX-DR-UD-23-P05-Parameter PlanPlanning · PDF22 May 2025View
Chapter 1 IntroductionPlanning · PDF22 May 2025View
Ecology Technical Note - Jan 2025Planning · PDF22 May 2025View
Appendix 9.2 Framework Travel PlanPlanning · PDF22 May 2025View
784-B024030-TTE-00-XX-DR-UD-23-P05-Parameter PlanPlanning · PDF22 May 2025View
13539_P10b_Landscape Strategy Plan_EL_compressedPlanning · PDF22 May 2025View
Utility and Services StudyPlanning · PDF22 May 2025View
Figure 6.5 13539_P05d_Topography_EL_CD_compressedPlanning · PDF22 May 2025View
Appendix 7.3 13539_R02b_EcoAssessment_DM_NC_22022022Planning · PDF22 May 2025View
784-B024030-TTE-00-XX-DR-UD-3D-P03-Site location plan with accessPlanning · PDF22 May 2025View
Flood Consequence Assessment and Drainage StrategyPlanning · PDF22 May 2025View
Appendix 10.1_Legislation_and_Guidance_27032024Planning · PDF22 May 2025View
Figure 8.3 Events 17Jan25dfPlanning · PDF22 May 2025View
Appendix 7.15 13539_HabitatFeaturesPlan_P01a_LJPlanning · PDF22 May 2025View
Chapter 3 Site DescriptionPlanning · PDF22 May 2025View
Figure 8.2 Non-Designated Assets 16Jan25dfPlanning · PDF22 May 2025View
Pre application report Appendices Only - Feb 2025Planning · PDF22 May 2025View
Appendix 11.4 Site Suitability V4Planning · PDF22 May 2025View
784-B024030-TTE-00-XX-DR-UD-03-P05-Site location plan (with aerial)Planning · PDF22 May 2025View
Chapter 9 Traffic and TransportPlanning · PDF22 May 2025View
Figure 8.4 Hedgerow Survey 16Jan25dfPlanning · PDF22 May 2025View
Appendix 6.8 LPG 34 Clwydian Range and Dee Valley AONB extractPlanning · PDF22 May 2025View
J10 - Notice - 190525Planning · PDF22 May 2025View
Archaeological and Heritage Technical NotePlanning · PDF22 May 2025View
Betsi Cadwaladr University Health Board Consultation ResponseConsultation Response · PDF9 Sept 2025View
Figure 6.3 13539_P03f_Landscape Planning Policy_EL_CDPlanning · PDF22 May 2025View
Figure 8.4 Hedgerow Survey 16Jan25dfPlanning · PDF22 May 2025View
Appendix 2.1 EIA Scoping Report Erlas Park, Cefn Park, WrexhamPlanning · PDF22 May 2025View
J10 - PA submission schedule v.4 - 190525.pdfPlanning · PDF21 May 2025View
784-B024030-TTE-00-XX-DR-UD-03-P05-Site location plan (with aerial).pdfPlanning · PDF21 May 2025View
Chapter 12 Flood Risk and DrainagePlanning · PDF22 May 2025View
Appendix 7.11 13539_BatSurveyResults_P06a_LJPlanning · PDF22 May 2025View
Chapter 10 Air QualityPlanning · PDF22 May 2025View
Appendix 7.4 13539_R004_TECH NOTE Aerial Inspection of Trees for Bats_DM_NC_22092022Planning · PDF22 May 2025View
Highways response · PDF10 Sept 2025View
Geophysical - ARCPlanning · PDF22 May 2025View
Appendix 6.6 Landscape Character Area CA8 SPGPlanning · PDF22 May 2025View
784-B024030-TTE-00-XX-DR-UD-41-P04-Phasing planPlanning · PDF22 May 2025View
Figure 6.4 13539_P04d_Published Landscape Character_Planning · PDF22 May 2025View
Phosphates Mitigation ReportPlanning · PDF22 May 2025View
784-B024030-TTE-00-XX-DR-UD-02-P08 Opportunities and constraints planPlanning · PDF22 May 2025View
HENEB Consultation ResponseConsultation Response · PDF2 Jun 2025View
Geophysical WSI - MagnitudePlanning · PDF22 May 2025View
Chapter 15 Summary and ResidualsPlanning · PDF22 May 2025View
Appendix 8.3 784-B024030 Heritage Impact Statement 11Oct21-reducedPlanning · PDF22 May 2025View
J10 - harworth - kss2 south - DRAFT s106 Heads of Terms- 190525Planning · PDF22 May 2025View
Figure 6.9 13539_P10b_Landscape Strategy Plan_EL_compressedPlanning · PDF22 May 2025View
Highways Consultation ResponseConsultation Response · PDF9 Sept 2025View
Health Impact Assessment v3.2 inc appendicesPlanning · PDF22 May 2025View
Appendix 10.3 Site SuitabilityPlanning · PDF22 May 2025View
Appendix 6.7 Wrexham Town Character Areas Guidance Note MapPlanning · PDF22 May 2025View
General Consultation ResponseConsultation Response · PDF16 Jun 2025View
784-B024030-TTE-00-XX-DR-UD-06-P01-Existing playing field_site plan (with aerial)Existing Plans · PDF22 May 2025View
Ecological AssessmentPlanning · PDF22 May 2025View
Appendix 8.5 MSSJ1686 - Geophysical Survey Report Wrexham Draft 1.0__compressedPlanning · PDF22 May 2025View
Appendix 7.12 Chapter 7 Ecology - Breeding Bird SurveyPlanning · PDF22 May 2025View
Air Quality AssessmentPlanning · PDF22 May 2025View
Appendix 13.1 Cefn Park Agricultural Land Quality 012025Planning · PDF22 May 2025View
Chapter 6 Landscape and VisualPlanning · PDF22 May 2025View
J10 - Planning Statement Appendices - May 2025Planning · PDF22 May 2025View
Figure 8.3 Events 17Jan25dfPlanning · PDF22 May 2025View
Chapter 13 Agricultural LandPlanning · PDF22 May 2025View
Appendix 2.2 Scoping Opinion ENQ2023-0303ReportPlanning · PDF22 May 2025View
LQAS Consultation ResponseConsultation Response · PDF24 Jun 2025View
Appendix 8.6 Setting Assessment Report 28Mar24 TT-LH-003-Rev 02Planning · PDF22 May 2025View
784-B024030-TTE-00-XX-DR-UD-47-P03-Illustrative layoutPlanning · PDF22 May 2025View
Cefn Park - PAC Report Only - Feb 2025Planning · PDF22 May 2025View
Figure 6.1 13539_P01d_Site Location_EL_CD_compressedPlanning · PDF22 May 2025View
J10 - harworth - kss2 south - DRAFT s106 Head of Terms - 190525.pdfPlanning · PDF21 May 2025View
784-B024030-TTE-00-XX-DR-UD-P06-Strategic masterplanPlanning · PDF22 May 2025View
Ramblers Consultation ResponseConsultation Response · PDF30 May 2025View
784-B024030-TTE-00-XX-DR-UD-03-P05-Site location planPlanning · PDF22 May 2025View
Chapter 11 Noise and VibrationPlanning · PDF22 May 2025View
784-B024030-TTE-00-XX-DR-UD-04-P04-Site Plan with topo planPlanning · PDF22 May 2025View
Contaminated Land Consultation ResponseConsultation Response · PDF20 Jun 2025View
Appendix 7.13 13539_P03a_Breeding Bird Survey ResultsPlanning · PDF22 May 2025View
Public Protection Consultation ResponseConsultation Response · PDF20 Jun 2025View
Figure 6.8 13539_P08d_Photosheets_compressedPlanning · PDF22 May 2025View
Application Form Redacted.pdfPlanning · PDF21 May 2025View
Chapter 7 EcologyPlanning · PDF22 May 2025View
EcIA Addendum · PDF22 May 2025View
Figure 8.1- Designated Assets 16Jan25dfPlanning · PDF22 May 2025View
Heritage Impact StatementPlanning · PDF22 May 2025View
Appendix 6.5 Revised Special Landscape AreaPlanning · PDF22 May 2025View
Planning StatementPlanning · PDF9 Jun 2025View
Highways - Framework Travel Plan_04Planning · PDF22 May 2025View
Appendix 7.2 Illustrative MasterplanPlanning · PDF22 May 2025View
784-B024030-TTE-00-XX-DR-UD-23-P06-Parameter PlanPlanning · PDF22 May 2025View
Heritage - Setting Assessment ReportPlanning · PDF22 May 2025View
Appendix 6.4 Planning Policy ContextPlanning · PDF22 May 2025View
RJK-ES-NTS-Erlas-Rev001 Environmental Statement Volume 1Planning · PDF22 May 2025View
Archaeological Desk-Based AssessmentPlanning · PDF22 May 2025View
J10 - Notice - 190525.pdfPlanning · PDF21 May 2025View
Appendix 12.2 Relevant Email CorrespondencePlanning · PDF22 May 2025View
Ground Condition Desk Study Confidential ReportPlanning · PDF22 May 2025View
NRW Consultation ResponseConsultation Response · PDF17 Jun 2025View
784-B024030-TTE-00-XX-DR-UD-3D-P04-Site location plan with accessPlanning · PDF22 May 2025View
Agricultural Land QualityPlanning · PDF22 May 2025View
Ecological Impact AssessmentPlanning · PDF22 May 2025View
Appendix 9.1 Transport AssessmentPlanning · PDF22 May 2025View
Appendix 11.2 Calculations, Modelling and Assessment TechniquesPlanning · PDF22 May 2025View
Geotechnical Report - REDACTEDPlanning · PDF22 May 2025View
Acoustic AssessmentPlanning · PDF22 May 2025View
RJK-ES-Erlas-Rev001 April 2025 Environmental Statement Front Page and Contents v 2Planning · PDF22 May 2025View
Highways - Transport Assessment_04Planning · PDF22 May 2025View
Appendix 7.5 13539_R05b_Ecological Impact Assessment 27032024Planning · PDF22 May 2025View
Tree AIA reportPlanning · PDF22 May 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Ymgynghori ar hyn o bryd / Under Consultation
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.