Change of use of existing ground-floor rear and upper floor offices to create a 21 bedroom house of multiple occupation (HMO)(Sui Generis) including associated extensions and alterations comprising rear dormers and front roof lights, installation of solar panels to south roof slopes, replacement windows, demolition of first-floor rear storage area and construction of first-floor rear infill extension plus ground-floor store in rear yard, roof removed to rear yard. Application to Vary Condition 1 of previously approved AWDM/2007/22. (Approved Plans). Amendments to include reconfiguration of internal layouts inlcuding to grd floor kitchen/dining areas, 1st floor stair lobbies and 2nd floor link corridor; plus insertion of rooflight windows and solar PVs to rear outbuilding
Change of use of existing ground-floor rear and upper floor offices to create a 21 bedroom house of multiple occupation (HMO)(Sui Generis) including associated extensions and alterations comprising rear dormers and front roof lights, installation of solar panels to south roof slopes, replacement windows, demolition of first-floor rear storage area and construction of first-floor rear infill extension plus ground-floor store in rear yard, roof removed to rear yard. Application to Vary Condition 1 of previously approved AWDM/2007/22. (Approved Plans). Amendments to include reconfiguration of internal layouts inlcuding to grd floor kitchen/dining areas, 1st floor stair lobbies and 2nd floor link corridor; plus insertion of rooflight windows and solar PVs to rear outbuilding
Reference
AWDM/0958/23
Alternative references
PP-12294732
Ward
Central
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.