Council planning record

Proposed replacement bridge to provide upgraded shared use pedestrian and cycle bridge access over the A38 corridor with associated active travel improvements

Existing footbridge spanning A38 Bromsgrove on land between Fordhouse Road west of the A38 and Carnforth Road east of the A38, Bromsgrove, Worcestershire

PermittedReference: 22/000002/REG3Worcestershire County Council

Last published check: 14 Sept 2026, 20:10. Check the council record for more recent changes.

Application location

Existing footbridge spanning A38 Bromsgrove on land between Fordhouse Road west of the A38 and Carnforth Road east of the A38, Bromsgrove, Worcestershire

This record has no verified map location.

Application summary

Status
Permitted
Application type
Regulation 3 Application
Received
24 Jan 2022
Validated
24 Jan 2022
Determination deadline
Not published
Local authority
Worcestershire County Council

Application overview

Proposed replacement bridge to provide upgraded shared use pedestrian and cycle bridge access over the A38 corridor with associated active travel improvements

Proposal details

Reference
22/000002/REG3
Agent
Mark Gorry, Burroughs

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 120 of 120

DocumentPublishedAction
01 Cover Letter01_Cover_Letter.pdfNot publishedView
02 ApplicationFormRedacted02_ApplicationFormRedacted.pdfNot publishedView
03 Planning Statement03_Planning_Statement.pdfNot publishedView
04 Aboriculture Impact Assessment - Redacted04_Aboriculture_Impact_Assessment_-_Redacted.pdfNot publishedView
05 Arboriculture Survey Report_Redacted05_Arboriculture_Survey_Report_Redacted.pdfNot publishedView
06 Part 1 - Archaeological Desk Based Assessment06_Part_1_-_Archaeological_Desk_Based_Assessment.pdfNot publishedView
06 Part 2 - Archaeological Desk Based Assessment06_Part_2_-_Archaeological_Desk_Based_Assessment.pdfNot publishedView
06 Part 3 - Archaeological Desk Based Assessment06_Part_3_-_Archaeological_Desk_Based_Assessment.pdfNot publishedView
06 Part 4 - Archaeological Desk Based Assessment06_Part_4_-_Archaeological_Desk_Based_Assessment.pdfNot publishedView
07 Construction Environmental Management Plan (CEMP)07_Construction_Environmental_Management_Plan_(CEMP).pdfNot publishedView
08 Landscape & Environmental Mangement Plan (LEMP)08_Landscape_&_Environmental_Mangement_Plan_(LEMP).pdfNot publishedView
09 Preliminary Drainage Strategy Report_Redacted09_Preliminary_Drainage_Strategy_Report_Redacted.pdfNot publishedView
10 Superseded Preliminary Ecological Appraisal (PEA)10_Superseded Preliminary_Ecological_Appraisal_(PEA).pdfNot publishedView
11 Part 1 - Preliminary Sources Study Report - Report and App A_Redacted11_Part_1_-_Preliminary_Sources_Study_Report_-_Report_and_App_A_Redacted.pdfNot publishedView
11 Part 2 - Preliminary Sources Study Report - Report and App A_Redacted11_Part_2_-_Preliminary_Sources_Study_Report_-_Report_and_App_A_Redacted.pdfNot publishedView
11 Part 3 - Preliminary Sources Study Report - Report and App A_Redacted11_Part_3_-_Preliminary_Sources_Study_Report_-_Report_and_App_A_Redacted.pdfNot publishedView
11 Part 4 - Preliminary Sources Study Report - App B C D E11_Part_4_-_Preliminary_Sources_Study_Report_-_App_B_C_D_E.pdfNot publishedView
12 Preliminary Site Lines To Residential Properties12_Preliminary_Site_Lines_To_Residential_Properties.pdfNot publishedView
13 Preliminary Key Links General Arrangement Plan Overview13_Preliminary_Key_Links_General_Arrangement_Plan_Overview.pdfNot publishedView
14 Part 1 - Utilities Assessment Report14_Part_1_-_Utilities_Assessment_Report.pdfNot publishedView
14 Part 2 - Utilities Assessment Report14_Part_2_-_Utilities_Assessment_Report.pdfNot publishedView
14 Part 3 - Utilities Assessment Report14_Part_3_-_Utilities_Assessment_Report.pdfNot publishedView
14 Part 4 - Utilities Assessment Report14_Part_4_-_Utilities_Assessment_Report.pdfNot publishedView
15 Structures Preliminary Design Report_Redacted15_Structures_Preliminary_Design_Report_Redacted.pdfNot publishedView
16 Landscape Visual Impact Assessment (LVIA)16_Landscape_Visual_Impact_Assessment_(LVIA).pdfNot publishedView
17 Part 1 - Geotechnical Assessment Report_Redacted17_Part_1_-_Geotechnical_Assessment_Report_Redacted.pdfNot publishedView
17 Part 2 - Geotechnical Assessment Report_Redacted17_Part_2_-_Geotechnical_Assessment_Report_Redacted.pdfNot publishedView
18 Part 1 - Lighting Assessment Report18_Part_1_-_Lighting_Assessment_Report.pdfNot publishedView
18 Part 2 - Lighting Assessment Report18_Part_2_-_Lighting_Assessment_Report.pdfNot publishedView
19 Appendix 4 - Air Quality Appendices19_Appendix_4_-_Air_Quality_Appendices.pdfNot publishedView
20 Part 1 - Appendix 5 - Noise and Vibration Appendices20_Part_1_-_Appendix_5_-_Noise_and_Vibration_Appendices.pdfNot publishedView
20 Part 2 - Appendix 5 - Noise and Vibration Appendices20_Part_2_-_Appendix_5_-_Noise_and_Vibration_Appendices.pdfNot publishedView
21 Environmental Report - Chapter 8 Air Quality21_Environmental_Report_-_Chapter_8_Air_Quality.pdfNot publishedView
22 Environmental Report - Chapter 9 Noise and Vibration22_Environmental_Report_-_Chapter_9_Noise_and_Vibration.pdfNot publishedView
23 BREP A38 Screening Opinion23_BREP_A38_Screening_Opinion.pdfNot publishedView
24 View from 1 Oakalls Avenue-A124_View_from_1_Oakalls_Avenue-A1.pdfNot publishedView
25 View from 27 Carnforth Road-A125_View_from_27_Carnforth_Road-A1.pdfNot publishedView
26 View from 71 Fordhouse Road-A126_View_from_71_Fordhouse_Road-A1.pdfNot publishedView
27 View from Wendron Close-A127_View_from_Wendron_Close-A1.pdfNot publishedView
28 Viewpoint A38 Facing North28_Viewpoint_A38_Facing_North.pdfNot publishedView
29 Viewpoint A38 Facing South-A129_Viewpoint_A38_Facing_South-A1.pdfNot publishedView
30 Red Line Boundary Plan30_Red_Line_Boundary_Plan.pdfNot publishedView
31 Red & Blue Line Boundary Plan31_Red_&_Blue_Line_Boundary_Plan.pdfNot publishedView
32 Amended Proposed Site Location Plan32_Amended_Proposed_Site_Location_Plan.pdfNot publishedView
33 Travel Connectivity - Planning Boundary Plan33_Travel_Connectivity_-_Planning_Boundary_Plan.pdfNot publishedView
34 Existing Site Plan34_Existing_Site_Plan.pdfNot publishedView
35 Proposed General Arrangement Plan35_Proposed_General_Arrangement_Plan.pdfNot publishedView
36 General Arrangement Plan - Sheet 136_General_Arrangement_Plan_-_Sheet_1.pdfNot publishedView
37 General Arrangement Plan - Sheet 237_General_Arrangement_Plan_-_Sheet_2.pdfNot publishedView
38 General Arrangement OverView Plan38_General_Arrangement_OverView_Plan.pdfNot publishedView
39 General Arrangement - Road Markings39_General_Arrangement_-_Road_Markings.pdfNot publishedView
40 Road Geometry General Arrangement Plan40_Road_Geometry_General_Arrangement_Plan.pdfNot publishedView
41 Drainage Existing Surface Water General Arrangement41_Drainage_Existing_Surface_Water_General_Arrangement.pdfNot publishedView
42 Superseded Drainage Proposed Surface Water General Arrangement Sheet 142_Superseded Drainage_Proposed_Surface_Water_General_Arrangement_Sheet_1.pdfNot publishedView
43 Superseded Drainage Proposed Surface Water General Arrangement Sheet 243_Superseded Drainage_Proposed_Surface_Water_General_Arrangement_Sheet_2.pdfNot publishedView
44 Earthworks General Arrangement Plan44_Earthworks_General_Arrangement_Plan.pdfNot publishedView
45 Earthworks Standard Details Sheet 145_Earthworks_Standard_Details_Sheet_1.pdfNot publishedView
46 Existing Topographical Survey46_Existing_Topographical_Survey.pdfNot publishedView
47 Fencing General Arrangement Plan47_Fencing_General_Arrangement_Plan.pdfNot publishedView
48 Fencing Standard Details - Sheet 148_Fencing_Standard_Details_-_Sheet_1.pdfNot publishedView
49 Kerbs Footways & Paved Areas General Arrangement49_Kerbs_Footways_&_Paved_Areas_General_Arrangement.pdfNot publishedView
50 Kerbs Footways & Paved Areas Sheet 150_Kerbs_Footways_&_Paved_Areas_Sheet_1.pdfNot publishedView
51 Kerbs Footways & Paved Areas Sheet 251_Kerbs_Footways_&_Paved_Areas_Sheet_2.pdfNot publishedView
52 Kerbs Footways & Paved Areas Sheet 352_Kerbs_Footways_&_Paved_Areas_Sheet_3.pdfNot publishedView
53 Geometric Layout Long Section53_Geometric_Layout_Long_Section.pdfNot publishedView
54 Bridge Longsection Plan54_Bridge_Longsection_Plan.pdfNot publishedView
55 Bridge Sections Plan55_Bridge_Sections_Plan.pdfNot publishedView
56 Amended Landscape Proposals - Planting56 Amended_Landscape_Proposals_-_Planting.pdfNot publishedView
57 Landscape Proposals - Seeding57_Landscape_Proposals_-_Seeding.pdfNot publishedView
58 Site Clearance General Arrangement Plan58_Site_Clearance_General_Arrangement_Plan.pdfNot publishedView
59 Site Constraints Plans & Photos - Part 259_Site_Constraints_Plans_&_Photos_-_Part_2.pdfNot publishedView
60 Temporary Works Plan60_Temporary_Works_Plan.pdfNot publishedView
61 Public Rights of Way Plan61_Public_Rights_of_Way_Plan.pdfNot publishedView
62 Scheme Bollards Locations General Arrangement Plan62_Scheme_Bollards_Locations_General_Arrangement_Plan.pdfNot publishedView
63 Lighting Layout Plan63_Lighting_Layout_Plan.pdfNot publishedView
64 Linesearch Results - Part 264_Linesearch_Results_-_Part_2.pdfNot publishedView
65 Public Notice - Dated 9 February 202265_Public_Notice_-_Dated_9_February_2022.pdfNot publishedView
66 2020.05.14 Updated Guidance Notes v266_2020.05.14_Updated_Guidance_Notes_v2.pdfNot publishedView
67 Location of Public Notices67_Location_of_Public_Notices.pdfNot publishedView
68 2022.02.14 Severn Trent Water68_2022.02.14_Severn_Trent_Water.pdfNot publishedView
69 2022.02.17 County Archaeology Comments69_2022.02.17_County_Archaeology_Comments.pdfNot publishedView
70 2022.02.17 Historic England Comments70_2022.02.17_Historic_England_Comments.pdfNot publishedView
71 2022.02.17 WRS - Air Quality Comments71_2022.02.17_WRS_-_Air_Quality_Comments.pdfNot publishedView
72 2022.02.23 PRoW Comments72_2022.02.23_PRoW_Comments.pdfNot publishedView
73 2022.02.23 West Mercia Police73_2022.02.23_West_Mercia_Police.pdfNot publishedView
74 Cadent Gas74_Cadent_Gas.pdfNot publishedView
75 2022.02.25 Ecology Comments75_2022.02.25_Ecology_Comments.pdfNot publishedView
76 2022.03.01 County Public Health76_2022.03.01_County_Public_Health.pdfNot publishedView
77 2022.03.01 Cycling UK Comments77_2022.03.01_Cycling_UK_Comments.pdfNot publishedView
78 2022.03.01 Fire Service78_2022.03.01_Fire_Service.pdfNot publishedView
79 2022.03.01 Natural England Comments79_2022.03.01_Natural_England_Comments.pdfNot publishedView
80 2022.03.01 NWWM & LLFA80_2022.03.01_NWWM_&_LLFA.pdfNot publishedView
81 2022.03.01 Open Space Society81_2022.03.01_Open_Space_Society.pdfNot publishedView
82 2022.03.01 WRS Noise, Dust & Vibration82_2022.03.01_WRS_Noise,_Dust_&_Vibration.pdfNot publishedView
83 2022.03.02 National Highways83_2022.03.02_National_Highways.pdfNot publishedView
84 2022.03.02 Ramblers84_2022.03.02_Ramblers.pdfNot publishedView
85 2022.03.02 WWT Comments85_2022.03.02_WWT_Comments.pdfNot publishedView
86 2022.03.03 Councillor Joshua Robinson86_2022.03.03_Councillor_Joshua_Robinson.pdfNot publishedView
87 2022.03.08 County Landscape87_2022.03.08_County_Landscape.pdfNot publishedView
88 2022.03.21 Sustrans Comments88_2022.03.21_Sustrans_Comments.pdfNot publishedView
89 2022.03.22 Highways Comments89_2022.03.22_Highways_Comments.pdfNot publishedView
90 2022.03.23 Bromsgrove District Council90_2022.03.23 Bromsgrove_District_Council.pdfNot publishedView
91 2022.03.24 Amended Preliminary Ecological Appraisal (PEA)91_2022.03.24_Amended_Preliminary_Ecological_Appraisal_(PEA).pdfNot publishedView
92 2022.03.24 Amended Proposed Surface Water General Arrangement Sheet 192_2022.03.24_Amended_Proposed_Surface_Water_General_Arrangement_Sheet_1.pdfNot publishedView
93 2022.03.24 Amended Drainage Proposed Surface Water General Arrangement Plan Sheet 293_2022.03.24_Amended_Drainage_Proposed_Surface_Water_General_Arrangement_Plan_Sheet_2.pdfNot publishedView
94 2022.03.24 Bromsgrove District Council Conservation Comments94_2022.03.24_Bromsgrove_District_Council_Conservation_Comments.pdfNot publishedView
95 2022.03.25 LLFA Comments95_2022.03.25_LLFA_Comments.pdfNot publishedView
96 2022.03.25 County Landscape Officer Comments re Bromsgrove DC Comments96_2022.03.25_County_Landscape_Officer_Comments_re_Bromsgrove_DC_Comments.pdfNot publishedView
97 2022.04.04 County Ecology Comments on Amended Documents97_2022.04.04_County_Ecology_Comments_on_Amended_Documents.pdfNot publishedView
98 2022.04.04 County Landscape Officer Comments on Amended Documents98_2022.04.04_County_Landscape_Officer_Comments_on_Amended_Documents.pdfNot publishedView
99 2022.04.04 NWWM Comments on Amended Documents99_2022.04.04_NWWM_Comments_on_Amended_Documents.pdfNot publishedView
_100 2022.04.12 Bromsgrove District Council Response to Amended Plans & Additional Information_100_2022.04.12_Bromsgrove_District_Council_Response_to_Amended_Plans_&_Additional_Information.pdfNot publishedView
_101 Sustrans_101_Sustrans.pdfNot publishedView
_102 2022.04.12 Bromsgrove District Council Response to Amended Plans & Additional Information_102_2022.04.12_Bromsgrove_District_Council_Response_to_Amended_Plans_&_Additional_Information.pdfNot publishedView
_103 Councillor Robinson consultaion comments_103_Councillor_Robinson_consultaion_comments.pdfNot publishedView
_104 BREP A38 - Ecology Comments_Redacted_104_BREP_A38_-_Ecology_Comments_Redacted.pdfNot publishedView
_105 2022.03.25 BREP A38 Response to Bromsgrove District Council_105_2022.03.25_BREP_A38_Response_to_Bromsgrove_District_Council.pdfNot publishedView
_106 2022.05.24 Committee Report_106_2022.05.24_Committee_Report.pdfNot publishedView
_107 Signed BREP Scheme 5 Decision Notice - 27 May 2022_107_Signed_BREP_Scheme_5_Decision_Notice_-_27_May_2022.pdfNot publishedView
_108 Printed minutes 24052022 1000 Planning and Regulatory Committee_108_Printed_minutes_24052022_1000_Planning_and_Regulatory_Committee.pdfNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Valid Date

    Published milestoneCouncil source
  3. Consultation Start Date

    Published milestoneCouncil source
  4. Site Visited / Site Notice Date

    Published milestoneCouncil source
  5. Consultation End

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Date

    Published milestoneCouncil source

Decision & conditions

Permitted
_107 Signed BREP Scheme 5 Decision Notice - 27 May 2022
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.