Council planning record

Discharge of Conditions 4 5 7 21 23 26 29 - Proposed new cycle / footbridge to span the River Severn and associated access paths to the local highway

On land including and between Gheluvelt Park, Waterworks Road on the east side of the River Severn and the restored landfill site, Hallow Road, on the west side of the River Severn, Worcester, Worcestershire

PermittedReference: 21/000034/DISWorcestershire County Council

Last published check: 14 Sept 2026, 20:18. Check the council record for more recent changes.

Application location

On land including and between Gheluvelt Park, Waterworks Road on the east side of the River Severn and the restored landfill site, Hallow Road, on the west side of the River Severn, Worcester, Worcestershire

This record has no verified map location.

Application summary

Status
Permitted
Application type
Discharge of Condition(s)
Received
7 Oct 2021
Validated
7 Oct 2021
Determination deadline
Not published
Local authority
Worcestershire County Council

Application overview

Discharge of Conditions 4 5 7 21 23 26 29 - Proposed new cycle / footbridge to span the River Severn and associated access paths to the local highway

Proposal details

Reference
21/000034/DIS
Parish
Worcester
Agent
Victoria Edge, Jacobs

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 83 of 83

DocumentPublishedAction
21 2021.10.26 Natural England re Con 721_2021.10.26_Natural_England_re_Con_7.pdfNot publishedView
20 2021.10.21 Canal and River Trust re Con 420_2021.10.21_Canal_and_River_Trust_re_Con_4.pdfNot publishedView
19 2021.10.21 Worcestershire Wildlife Trust re Con 719_2021.10.21_Worcestershire_Wildlife_Trust_re_Con_7.pdfNot publishedView
18 2021.10.14 County Archaeology to EC re Con 2118_2021.10.14_County_Archaeology_to_EC_re_Con_21.pdfNot publishedView
17 2021.10.13 South Worcestershire Land Drainage to EC re Con 417_2021.10.13_South_Worcestershire_Land_Drainage_to_EC_re_Con_4.pdfNot publishedView
16 Decision Notice - Dated 29 September 202116_Decision_Notice_-_Dated_29_September_2021.pdfNot publishedView
15 Condition 29 - Piling Risk Assessment15_Condition_29_-_Piling_Risk_Assessment.pdfNot publishedView
14 Condition 26 - Water Management Standard_Redacted14_Condition_26_-_Water_Management_Standard_Redacted.pdfNot publishedView
13 Condition 26 - Method Statement for Pollution Management13_Condition_26_-_Method_Statement_for_Pollution_Management.pdfNot publishedView
12 Condition 26 - Method Statement for Control of Site Nuisances12_Condition_26_-_Method_Statement_for_Control_of_Site_Nuisances.pdfNot publishedView
11 Condition 26 - Method Statement for Control of invasive species11_Condition_26_-_Method_Statement_for_Control_of_invasive_species.pdfNot publishedView
10 Condition 23 - Pylon Base, Backstay Anchor Block and Typical Pier10_Condition_23_-_Pylon_Base,_Backstay_Anchor_Block_and_Typical_Pier.pdfNot publishedView
09 Condition 23 - Pylon Base and Anchor Block Setting Out09_Condition_23_-_Pylon_Base_and_Anchor_Block_Setting_Out.pdfNot publishedView
08 Condition 23 - Pier and Abutment Base Setting Out08_Condition_23_-_Pier_and_Abutment_Base_Setting_Out.pdfNot publishedView
07 Condition 23 - General Arrangment West Abutment07_Condition_23_-_General_Arrangment_West_Abutment.pdfNot publishedView
06 Condition 23 - General Arrangement East Abutment06_Condition_23_-_General_Arrangement_East_Abutment.pdfNot publishedView
05 Condition 23 - General Arrangement B2367216-06-JAC-SBR-00-DR-C-1001 P0205_Condition_23_-_General_Arrangement_B2367216-06-JAC-SBR-00-DR-C-1001_P02.pdfNot publishedView
04 Superseded Condition 21 - Evaluation Written Scheme of Investigation04_Superseded_Condition_21_-_Evaluation_Written_Scheme_of_Investigation.pdfNot publishedView
03 Condition 7 -T10 Bat Roost Inspection Survey03_Condition_7_-T10_Bat_Roost_Inspection_Survey.pdfNot publishedView
02 Superseded Conditions 4 & 5 CEMP - Part 602_Superseded_Conditions_4_&_5_CEMP_-_Part_6.pdfNot publishedView
02 Superseded Conditions 4 & 5 CEMP - Part 502_Superseded_Conditions_4_&_5_CEMP_-_Part_5.pdfNot publishedView
02 Superseded Conditions 4 & 5 CEMP - Part 402_Superseded_Conditions_4_&_5_CEMP_-_Part_4.pdfNot publishedView
02 Superseded Conditions 4 & 5 CEMP - Part 302_Superseded_Conditions_4_&_5_CEMP_-_Part_3.pdfNot publishedView
02 Superseded Conditions 4 & 5 CEMP - Part 202_Superseded_Conditions_4_&_5_CEMP_-_Part_2.pdfNot publishedView
02 Superseded Conditions 4 & 5 CEMP - Part 102_Superseded_Conditions_4_&_5_CEMP_-_Part_1.pdfNot publishedView
01 2021.10.07 Cover Email01_2021.10.07_Cover_Email.pdfNot publishedView
45 2022.01.07 Discharge of Conditions 4 5 7 21 23 26 & 2945_2022.01.07_Discharge_of_Conditions_4_5_7_21_23_26_&_29.pdfNot publishedView
44 Planning_Condition_2644_Planning_Condition_26.pdfNot publishedView
43 Discovering Possibly Contaminated Materials on Site43_Discovering_Possibly_Contaminated_Materials_on_Site.pdfNot publishedView
42 Part 3 - Geotechnical Design Report42_Part_3_-_Geotechnical_Design_Report.pdfNot publishedView
42 Part 2 - Geotechnical Design Report42_Part_2_-_Geotechnical_Design_Report.pdfNot publishedView
42 Part 1 - Geotechnical Design Report42_Part_1_-_Geotechnical_Design_Report.pdfNot publishedView
41 Part 27 - Ground Investigation Report - Con 2641_Part_27_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 26 - Ground Investigation Report - Con 2641_Part_26_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 25 - Ground Investigation Report - Con 2641_Part_25_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 24 - Ground Investigation Report - Con 2641_Part_24_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 23 - Ground Investigation Report - Con 2641_Part_23_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 22 - Ground Investigation Report - Con 2641_Part_22_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 21 - Ground Investigation Report - Con 2641_Part_21_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 20 - Ground Investigation Report - Con 2641_Part_20_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 19 - Ground Investigation Report - Con 2641_Part_19_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 18 - Ground Investigation Report - Con 2641_Part_18_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 17 - Ground Investigation Report - Con 2641_Part_17_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 16 - Ground Investigation Report - Con 2641_Part_16_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 15 - Ground Investigation Report - Con 2641_Part_15_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 14 - Ground Investigation Report - Con 2641_Part_14_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 13 - Ground Investigation Report - Con 2641_Part_13_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 12 - Ground Investigation Report - Con 2641_Part_12_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 11 - Ground Investigation Report - Con 2641_Part_11_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 10 - Ground Investigation Report - Con 2641_Part_10_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 9 - Ground Investigation Report - Con 2641_Part_9_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 8 - Ground Investigation Report - Con 2641_Part_8_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 7 - Ground Investigation Report - Con 2641_Part_7_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 6 - Ground Investigation Report - Con 2641_Part_6_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 5 - Ground Investigation Report - Con 2641_Part_5_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 4 - Ground Investigation Report - Con 2641_Part_4_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 3 - Ground Investigation Report - Con 2641_Part_3_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 2 - Ground Investigation Report - Con 2641_Part_2_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
41 Part 1 - Ground Investigation Report - Con 2641_Part_1_-_Ground_Investigation_Report_-_Con_26.pdfNot publishedView
40 2021.10.28 Planning Condition 2640_2021.10.28_Planning_Condition_26.pdfNot publishedView
39 2021.10.28 Method Statement -Discovery of Possible Contaminated Materials Con 2639_2021.10.28_Method_Statement_-Discovery_of_Possible_Contaminated_Materials_Con_26.pdfNot publishedView
38 2021.10.28 Amended Evaluation Written Scheme of Investigation - Condition 2138_2021.10.28_Amended_Evaluation_Written_Scheme_of_Investigation_-_Condition_21.pdfNot publishedView
37 Amended CEMP Conditions 4 and 5 - Part 637_Amended_CEMP_Conditions_4_and_5_-_Part_6.pdfNot publishedView
37 Amended CEMP Conditions 4 and 5 - Part 537_Amended_CEMP_Conditions_4_and_5_-_Part_5.pdfNot publishedView
37 Amended CEMP Conditions 4 and 5 - Part 437_Amended_CEMP_Conditions_4_and_5_-_Part_4.pdfNot publishedView
37 Amended CEMP Conditions 4 and 5 - Part 337_Amended_CEMP_Conditions_4_and_5_-_Part_3.pdfNot publishedView
37 Amended CEMP Conditions 4 and 5 - Part 237_Amended_CEMP_Conditions_4_and_5_-_Part_2.pdfNot publishedView
37 Amended CEMP Conditions 4 and 5 - Part 137_Amended_CEMP_Conditions_4_and_5_-_Part_1.pdfNot publishedView
36 2021.10.14 County Archaeology to EC re Con 2336_2021.10.14_County_Archaeology_to_EC_re_Con_23.pdfNot publishedView
35 2021.10.29 LUC Ecology Con 735_2021.10.29_LUC_Ecology_Con_7.pdfNot publishedView
34 2021.12.08 LUC Ecology Comments re Con 534_2021.12.08_LUC_Ecology_Comments re Con 5.pdfNot publishedView
33 2021.11.04 Environment Agency re Con 533_2021.11.04_Environment_Agency_re_Con_5.pdfNot publishedView
32 2021.10.29 LUC Ecology Con 532_2021.10.29_LUC_Ecology_Con_5.pdfNot publishedView
31 2021.10.26 Natural England re Con 531_2021.10.26_Natural_England_re_Con_5.pdfNot publishedView
30 2021.10.21 Worcestershire Wildlife Trust re Con 530_2021.10.21_Worcestershire_Wildlife_Trust_re_Con_5.pdfNot publishedView
29 2021.10.21 Canal and River Trust re Con 529_2021.10.21_Canal_and_River_Trust_re_Con_5.pdfNot publishedView
28 2021.10.15 Natural England to EC re Con 528_2021.10.15_Natural_England_to_EC_re_Con_5.pdfNot publishedView
27 Worcestershire Regulatory Services to EC re Con 427_Worcestershire_Regulatory_Services_to_EC_re_Con_4.pdfNot publishedView
26 2021.10.26 Natural England re Con 426_2021.10.26_Natural_England_re_Con_4.pdfNot publishedView
25 2021.10.26 Lead Local Flood Authority re Con 425_2021.10.26_Lead_Local_Flood_Authority_re_Con_4.pdfNot publishedView
24 2021.10.21 Worcestershire Wildlife Trust re Con 424_2021.10.21_Worcestershire_Wildlife_Trust_re_Con_4.pdfNot publishedView
23 2021.10.15 Natural England to EC re Con 423_2021.10.15_Natural_England_to_EC_re_Con_4.pdfNot publishedView
22 2021.11.03 Environment Agency re Con 422_2021.11.03_Environment_Agency_re_Con_4.pdfNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Valid Date

    Published milestoneCouncil source
  3. Consultation Start Date

    Published milestoneCouncil source
  4. Site Visited / Site Notice Date

    Published milestoneCouncil source
  5. Consultation End

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Date

    Published milestoneCouncil source

Decision & conditions

Permitted
16 Decision Notice - Dated 29 September 2021
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.