Council planning record

Discharge of Conditions 10, 11 and 12 - Proposed Pershore Northern Link Road comprising the construction of a new highway and road bridge to the north of Pershore in Worcestershire. The scheme will provide a direct link between the existing A44 / B4083 roundabout (north of the Oxford to Worcester (OWW) railway line) and the B4083 roundabout (south of the OWW railway line) to provide a critical connection between the A44 and B4083 Wyre Road and access to the Pershore Trading Estate. As part of the Northern Link Road a new road bridge will be constructed which will cross the OWW railway line to the east of Pershore railway station

Land between the A44/B4083 roundabout and the Wyre Road/Ascot road roundabout, Pershore, Worcestershire

PermittedReference: 21/000013/DISWorcestershire County Council

Last published check: 14 Sept 2026, 20:39. Check the council record for more recent changes.

Application location

Land between the A44/B4083 roundabout and the Wyre Road/Ascot road roundabout, Pershore, Worcestershire

This record has no verified map location.

Application summary

Status
Permitted
Application type
Discharge of Condition(s)
Received
17 May 2021
Validated
17 May 2021
Determination deadline
Not published
Local authority
Worcestershire County Council

Application overview

Discharge of Conditions 10, 11 and 12 - Proposed Pershore Northern Link Road comprising the construction of a new highway and road bridge to the north of Pershore in Worcestershire. The scheme will provide a direct link between the existing A44 / B4083 roundabout (north of the Oxford to Worcester (OWW) railway line) and the B4083 roundabout (south of the OWW railway line) to provide a critical connection between the A44 and B4083 Wyre Road and access to the Pershore Trading Estate. As part of the Northern Link Road a new road bridge will be constructed which will cross the OWW railway line to the east of Pershore railway station

Proposal details

Reference
21/000013/DIS
Parish
Pershore, Pinvin, Wyre Piddle
Agent
Chris Harding, Jacobs

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 26 of 26

DocumentPublishedAction
02 Condition 10 - Rail Bridge Construction Seqence02_Condition_10_-_Rail_Bridge_Construction_Seqence.pdfNot publishedView
01 Condition 10 - Rail Overbridge - Approval in Principle General Arrangment01_Condition_10_-_Rail_Overbridge_-_Approval_in_Principle_General_Arrangment.pdfNot publishedView
26 2021.07.02 Discharge of Con 12 re 19.000013REG326_2021.07.02_Discharge_of_Con_12_re_19.000013REG3.pdfNot publishedView
25 2021.07.07 19.000013 Discharge of Condition 1125_2021.07.07_19.000013_Discharge_of_Condition_11.pdfNot publishedView
24 2021.06.01 19000013REG3 Discharge of Condition 1024_2021.06.01_19000013REG3_Discharge_of_Condition_10.pdfNot publishedView
23 Con 12 Revised SuDS Management Plan 2188-BUR-XX-ZZ-RP-C-0008-S4-P2.0 redacted23_Con_12_Revised_SuDS_Management_Plan_2188-BUR-XX-ZZ-RP-C-0008-S4-P2.0_redacted.pdfNot publishedView
22 Revised - Con 11 Drainage Standard Details Sheet 3 2188-BUR-HDG-XX-DR-D-0052-A1-C2.022_Revised_-_Con_11_Drainage_Standard_Details_Sheet_3_2188-BUR-HDG-XX-DR-D-0052-A1-C2.0.pdfNot publishedView
21 Revised - Con 11 Drainage Standard Details Sheet 2 2188-BUR-HDG-XX-DR-D-0051-A1-C1.021_Revised_-_Con_11_Drainage_Standard_Details_Sheet_2_2188-BUR-HDG-XX-DR-D-0051-A1-C1.0.pdfNot publishedView
20 Revised - Con 11 Drainage Standard Details Sheet 1 2188-BUR-HDG-XX-DR-D-0050-A1-C2.020_Revised_-_Con_11_Drainage_Standard_Details_Sheet_1_2188-BUR-HDG-XX-DR-D-0050-A1-C2.0.pdfNot publishedView
19 Revised - Con 11 Drainage General Arrangement 2 of 2 188-BUR-HDG-XX-DR-D-0004 C2.019_Revised_-_Con_11_Drainage_General_Arrangement_2_of_2_188-BUR-HDG-XX-DR-D-0004_C2.0.pdfNot publishedView
18 Revised - Con 11 Drainage General Arrangement 1 of 2 2188-BUR-HDG-XX-DR-D-0002 C2.018_Revised_-_Con_11_Drainage_General_Arrangement_1_of_2_2188-BUR-HDG-XX-DR-D-0002_C2.0.pdfNot publishedView
17 Revised - Con 11 Drainage General Arrangement 2188-BUR-HDG-XX-DR-D-0001 C2.017_Revised_-_Con_11_Drainage_General_Arrangement_2188-BUR-HDG-XX-DR-D-0001_C2.0.pdfNot publishedView
16 Decision Notice - Dated 10th July 201916_Decision_Notice_-_Dated_10th_July_2019.pdfNot publishedView
15 Superseded Condition 12 - SuDS Management Plan_Redacted15_Superseded Condition_12_-_SuDS_Management_Plan_Redacted.pdfNot publishedView
14 Superseded Condition 11 Series 500 - Drainage Standard Details Sheet 214_Superseded Condition_11_Series_500_-_Drainage_Standard_Details_Sheet_2.pdfNot publishedView
13 Superseded Condition 11 Series 500 - Drainage Standard Details Sheet 113_Superseded Condition_11_Series_500_-_Drainage_Standard_Details_Sheet_1.pdfNot publishedView
12 Superseded Condition 11 Series 500 - Drainage General Arrangment Schedules 2 of 212_Superseded Condition_11_Series_500_-_Drainage_General_Arrangment_Schedules_2_of_2.pdfNot publishedView
11 Superseded Condition 11 Series 500 - Drainage General Arrangment Schedules 1 of 211_Superseded Condition_11_Series_500_-_Drainage_General_Arrangment_Schedules_1_of_2.pdfNot publishedView
10 Superseded Condition 11 Series 500 - Drainage General Arrangment10_Superseded Condition_11_Series_500_-_Drainage_General_Arrangment.pdfNot publishedView
09 Superseded Condition 11 - Series 100 - Preliminary General Arrangement09_Superseded Condition_11_-_Series_100_-_Preliminary_General_Arrangement.pdfNot publishedView
08 Condition 10 - Rail Bridge Deck Finishes08_Condition_10_-_Rail_Bridge_Deck_Finishes.pdfNot publishedView
07 Condition 10 - Rail Bridge Deck Layout07_Condition_10_-_Rail_Bridge_Deck_Layout.pdfNot publishedView
06 Condition 10 - Rail Bridge Deck End Diaphragm South06_Condition_10_-_Rail_Bridge_Deck_End_Diaphragm_South.pdfNot publishedView
05 Condition 10 - Rail Bridge Deck End Diaphragm North05_Condition_10_-_Rail_Bridge_Deck_End_Diaphragm_North.pdfNot publishedView
04 Condition 10 - Rail Bridge Reinforced Soil Wall Layout South04_Condition_10_-_Rail_Bridge_Reinforced_Soil_Wall_Layout_South.pdfNot publishedView
03 Condition 10 - Rail Bridge Reinforced Soil Wall Layout North03_Condition_10_-_Rail_Bridge_Reinforced_Soil_Wall_Layout_North.pdfNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Consultation Start Date

    Published milestoneCouncil source
  3. Site Visited / Site Notice Date

    Published milestoneCouncil source
  4. Application Valid Date

    Published milestoneCouncil source
  5. Consultation End

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Date

    Published milestoneCouncil source

Decision & conditions

Permitted
16 Decision Notice - Dated 10th July 2019
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.