Council planning record

Proposed development of an Energy and Resource Park

Land to the rear (south and east) of Liberty Aluminium Foundry, Stourport Road, Kidderminster, Worcestershire, DY11 7QE

PermittedReference: 20/000034/CMWorcestershire County Council

Last published check: 14 Sept 2026, 21:12. Check the council record for more recent changes.

Application location

Land to the rear (south and east) of Liberty Aluminium Foundry, Stourport Road, Kidderminster, Worcestershire, DY11 7QE

This record has no verified map location.

Application summary

Status
Permitted
Application type
County Matter
Received
19 Aug 2020
Validated
1 Sept 2020
Determination deadline
Not published
Local authority
Worcestershire County Council

Application overview

Proposed development of an Energy and Resource Park

Proposal details

Reference
20/000034/CM
Parish
Kidderminster
Agent
Sharon Queeney, Enzygo Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 263 of 263

DocumentPublishedAction
95 HRA Appropriate Assessment Appendix B95_HRA_Appropriate_Assessment_Appendix_B.pdfNot publishedView
94 HRA Appropriate Assessment Appendix A94_HRA_Appropriate_Assessment_Appendix_A.pdfNot publishedView
93 HRA Appropriate Assessment93_HRA_Appropriate_Assessment.pdfNot publishedView
92 2020.05.14 Updated Guidance Notes v292_2020.05.14_Updated_Guidance_Notes_v2.pdfNot publishedView
91 Public Notice - Dated 18 February 202191_Public_Notice_-_Dated_18_February_2021.pdfNot publishedView
90 2021.02.02 re Reference list WIPA Agglomeration lines90_2021.02.02_re_Reference_list_WIPA_Agglomeration_lines.pdfNot publishedView
89 2021.02.01 re Appendix 10 Responses89_2021.02.01_re_Appendix_10_Responses.pdfNot publishedView
88 2021.02.01 re Appendix 9 Supplementary Planning Statement88_2021.02.01_re_Appendix_9_Supplementary_Planning_Statement.pdfNot publishedView
87 2021.02.01 re Appendix 8 Part 9 Flood Risk and Drainage Management87_2021.02.01_re_Appendix_8_Part_9_Flood_Risk_and_Drainage_Management.pdfNot publishedView
86 2021.02.01 re Appendix 8 Part 8 Flood Risk and Drainage Management_Redacted86_2021.02.01_re_Appendix_8_Part_8_Flood_Risk_and_Drainage_Management_Redacted.pdfNot publishedView
85 2021.02.01 re Appendix 8 Part 7 Flood Risk and Drainage Management85_2021.02.01_re_Appendix_8_Part_7_Flood_Risk_and_Drainage_Management.pdfNot publishedView
84 2021.02.01 re Appendix 8 Part 6 Flood Risk and Drainage Management84_2021.02.01_re_Appendix_8_Part_6__Flood_Risk_and_Drainage_Management.pdfNot publishedView
83 2021.02.01 re Appendix 8 Part 5 Flood Risk and Drainage Management83_2021.02.01_re_Appendix_8_Part_5_Flood_Risk_and_Drainage_Management.pdfNot publishedView
82 2021.02.01 re Appendix 8 Part 4 Flood Risk and Drainage Management_Redacted82_2021.02.01_re_Appendix_8_Part_4_Flood_Risk_and_Drainage_Management_Redacted.pdfNot publishedView
81 2021.02.01 re Appendix 8 Part 3 Flood Risk and Drainage Management81_2021.02.01_re_Appendix_8_Part_3_Flood_Risk_and_Drainage_Management.pdfNot publishedView
80 2021.02.01 re Appendix 8 Part 2 Flood Risk and Drainage Management80_2021.02.01_re_Appendix_8_Part_2_Flood_Risk_and_Drainage_Management.pdfNot publishedView
79 2021.02.01 re Appendix 8 Part 1 Flood Risk and Drainage Management_Redacted79_2021.02.01_re_Appendix_8_Part_1_Flood_Risk_and_Drainage_Management_Redacted.pdfNot publishedView
78 2021.02.01 re Appendix 7 Climate Change78_2021.02.01_re_Appendix_7_Climate_Change.pdfNot publishedView
77 2021.02.01 re Appendix 6b Proposed Site Section Showing Typical Lighting77_2021.02.01_re_Appendix_6b_Proposed_Site_Section_Showing_Typical_Lighting.pdfNot publishedView
76 2021.02.01 re Appendix 6a Lighting Plan76_2021.02.01_re_Appendix_6a_Lighting_Plan.pdfNot publishedView
75 2021.02.01 re Appendix 5b Ecology75_2021.02.01_re_Appendix_5b_Ecology.pdfNot publishedView
74 2021.02.01 re Appendix 5a Updated HRA Screening Letter74_2021.02.01_re_Appendix_5a_Updated_HRA_Screening_Letter.pdfNot publishedView
73 2021.02.01 re Appendix 4_Noise Assessment on the SSSI and LWS_Redacted73_2021.02.01_re_Appendix_4_Noise_Assessment_on_the_SSSI_and_LWS_Redacted.pdfNot publishedView
72 2021.02.01 re Appendix 3 - Slope Stability Assessment_Redacted72_2021.02.01_re_Appendix_3_-_Slope_Stability_Assessment_Redacted.pdfNot publishedView
71 2021.02.01 re Appendix 2 Landscape and Visual71_2021.02.01_re_Appendix_2_Landscape_and_Visual.pdfNot publishedView
70 2021.02.01 re Appendix 1 Regulation 25 Request70_2021.02.01_re_Appendix_1_Regulation_25_Request.pdfNot publishedView
69 2020.01.08 Regulation 25 Request - Ref 20000034CM69_2020.01.08_Regulation_25_Request_-_Ref_20000034CM.pdfNot publishedView
68 2020.12.10 Woodland Trusts Comments68_2020.12.10_Woodland_Trusts_Comments.pdfNot publishedView
67 2020.11.30 Sustainability Comments67_2020.11.30_Sustainability_Comments.pdfNot publishedView
66 2020.11.12 Hartlebury PC66_2020.11.12_Hartlebury_PC.pdfNot publishedView
65 2020.11.12 EA Comments65_2020.11.12_EA_Comments.pdfNot publishedView
64 2020.11.09 Natural Englands Comments64_2020.11.09_Natural_Englands_Comments.pdfNot publishedView
63 2020.10.30 County Landscape Comments63_2020.10.30_County_Landscape_Comments.pdfNot publishedView
62 2020.10.29 WWT Comments62_2020.10.29_WWT_Comments.pdfNot publishedView
61 2020.10.29 Ecology Comments61_2020.10.29_Ecology_Comments.pdfNot publishedView
60 2020.10.29 Bewdley Town Councils Comments60_2020.10.29_Bewdley_Town_Councils_Comments.pdfNot publishedView
59 2020.10.28 LLFA Comments59_2020.10.28_LLFA_Comments.pdfNot publishedView
58 2020.10.26 Hartlebury Parish Council58_2020.10.26_Hartlebury_Parish_Council.pdfNot publishedView
57 2020.10.26 Councillor Fran Oborski Comments57_2020.10.26_Councillor_Fran_Oborski_Comments.pdfNot publishedView
56 2020.10.23 NWWM Comments56_2020.10.23_NWWM_Comments.pdfNot publishedView
55 2020.10.20 County Arch Comments55_2020.10.20_County_Arch_Comments.pdfNot publishedView
54 2020.10.15 Canal and River Trust Comments54_2020.10.15_Canal_and_River_Trust_Comments.pdfNot publishedView
53 2020.10.21 WRS Air Quality & Contam Land Comments53_2020.10.21_WRS_Air_Quality_&_Contam_Land_Comments.pdfNot publishedView
52 2020.10.21 PROW Comments52_2020.10.21_PROW_Comments.pdfNot publishedView
51 2020.10.21 Kidderminster Civic Society Comments51_2020.10.21_Kidderminster_Civic_Society_Comments.pdfNot publishedView
50 2020.10.14 County Highways Comments50_2020.10.14_County_Highways_Comments.pdfNot publishedView
49 2020.10.13 WRS Comments49_2020.10.13_WRS_Comments.pdfNot publishedView
48 2020.10.13 West Mercia Police Comments48_2020.10.13_West_Mercia_Police_Comments.pdfNot publishedView
47 2020.10.13 STWL Comments47_2020.10.13_STWL_Comments.pdfNot publishedView
46 2020.10.09 Historic Englands Comments46_2020.10.09_Historic_Englands_Comments.pdfNot publishedView
45 2020.10.07 Stourport Town Council Comments45_2020.10.07_Stourport_Town_Council_Comments.pdfNot publishedView
44 2020.09.28 Wychavon District Council Comments44_2020.09.28_Wychavon_District_Council_Comments.pdfNot publishedView
43 2020.09.21 Highways England Comments43_2020.09.21_Highways_England_Comments.pdfNot publishedView
42 2020.09.08 Western Power Line Search Comments42_2020.09.08_Western_Power_Line_Search_Comments.pdfNot publishedView
41 2020.05.14 Updated Guidance Notes v241_2020.05.14_Updated_Guidance_Notes_v2.pdfNot publishedView
40 Public Notice - Dated 17 September 202040_Public_Notice_-_Dated_17_September_2020.pdfNot publishedView
39 1057 005B Service Yard Tracking - Articulated HGV Service Yard Turns39_1057_005B_Service_Yard_Tracking_-_Articulated_HGV_Service_Yard_Turns.pdfNot publishedView
38 1057 004A Site Access Tracking - Articulated HGV Turns At A45138_1057_004A_Site_Access_Tracking_-_Articulated_HGV_Turns_At_A451.pdfNot publishedView
37 Figure 8.23 Landscape Strategy Plan37_Figure_8.23_Landscape_Strategy_Plan.pdfNot publishedView
36 TFK-2020-07 - D1 P0 Drainage Strategy36_TFK-2020-07_-_D1_P0_Drainage_Strategy.pdfNot publishedView
35 Site Topographical Survey - Additional Buildings35_Site_Topographical_Survey_-_Additional_Buildings.pdfNot publishedView
34 Proposed Block Plan - Additional Buildings34_Proposed_Block_Plan_-_Additional_Buildings.pdfNot publishedView
33 Proposed Site Plan - External Lighting33_Proposed_Site_Plan_-_External_Lighting.pdfNot publishedView
32 Proposed Fuel Reception and Energy Centre Elevations Sheet 232_Proposed_Fuel_Reception_and_Energy_Centre_Elevations_Sheet_2.pdfNot publishedView
_158 2021.08.03 WWT Comments_158_2021.08.03_WWT_Comments.pdfNot publishedView
_157 2021.08.03 Bewdley TC Comments_157_2021.08.03_Bewdley_TC_Comments.pdfNot publishedView
_156 2021.07.29 WRS Comments_156_2021.07.29_WRS_Comments.pdfNot publishedView
_155 2021.07.28 Kidderminster TC Comments_155_2021.07.28_Kidderminster_TC_Comments.pdfNot publishedView
_154 2021.07.23 Historic England Comments_154_2021.07.23_Historic_England_Comments.pdfNot publishedView
_153 2021.07.26 WRS contaminated land issues_153_2021.07.26_WRS_contaminated_land_issues.pdfNot publishedView
_152 2021.07.26 Severn Trent Water_152_2021.07.26_Severn_Trent_Water.pdfNot publishedView
_151 2021.07.22 Public Rights of Way_151_2021.07.22_Public_Rights_of_Way.pdfNot publishedView
_150 2021.07.07 Location of Public Notices_150_2021.07.07_Location_of_Public_Notices.pdfNot publishedView
_149 2021.07.20 Further Highways Comments_149_2021.07.20_Further_Highways_Comments.pdfNot publishedView
_148 2021.07.20 EA Comments_148_2021.07.20_EA_Comments.pdfNot publishedView
_147 2021.07.16 CRT Comments_147_2021.07.16_CRT_Comments.pdfNot publishedView
_146 2021.07.09 County Sustainability Comments_146_2021.07.09_County_Sustainability_Comments.pdfNot publishedView
_145 2021.07.07 WRS Noise Vibration Dust and Odour Comments_145_2021.07.07_WRS_Noise_Vibration_Dust_and_Odour_Comments.pdfNot publishedView
_144 2021.07.06 Wyre Forest DC Comments_144_2021.07.06_Wyre_Forest_DC_Comments.pdfNot publishedView
_143 2021.07.06 Sustrans Comments_143_2021.07.06_Sustrans_Comments.pdfNot publishedView
_142 2021.07.06 County Highways Comments_142_2021.07.06_County_Highways_Comments.pdfNot publishedView
_141 2021.06.26 WPD Comments_141_2021.06.26_WPD_Comments.pdfNot publishedView
_140 2021.06.26 Cadent National Grid Plant Comments_140_2021.06.26_Cadent_National_Grid_Plant_Comments.pdfNot publishedView
_139 Consultees List to Upload on APAS - July 2021_139_Consultees_List_to_Upload_on_APAS_-_July_2021.pdfNot publishedView
_138 2020.05.14 Updated Guidance Notes v2_138_2020.05.14_Updated_Guidance_Notes_v2.pdfNot publishedView
_137 Public Notice - Dated 8th July 2021_137_Public_Notice_-_Dated_8th_July_2021.pdfNot publishedView
_136 Addendum to Environmental Statement_136_Addendum_to_Environmental_Statement.pdfNot publishedView
_135 2021.07.02 Final Sustainability Officer Comments_135_2021.07.02_Final_Sustainability_Officer_Comments.pdfNot publishedView
_134 2021.06.30 Further County Sustainability Team Comments_134_2021.06.30_Further_County_Sustainability_Team_Comments.pdfNot publishedView
_133 2021.06.23 Further EA Comments_133_2021.06.23_Further_EA_Comments.pdfNot publishedView
_132 2021.06.23 Further Sustainability Officer Comments_132_2021.06.23_Further_Sustainability_Officer_Comments.pdfNot publishedView
_131 2021.06.25 Response to Substainability_131_2021.06.25_Response_to_Substainability.pdfNot publishedView
_130 2021.06.18 Sustainability Officer Comments_130_2021.06.18_Sustainability_Officer_Comments.pdfNot publishedView
_129 2021.06.22 From SQ re Response to Sustainability_129_2021.06.22_From_SQ_re_Response_to_Sustainability.pdfNot publishedView
_128 2021.05.21 Wyre Forest DC Comments_128_2021.05.21_Wyre_Forest_DC_Comments.pdfNot publishedView
_127 Spread sheet of public responses 250521_127_Spread_sheet_of_public_responses_250521.pdfNot publishedView
_126 20000034CM Response to Regulation 25 consultees 280521_Redacted_126_20000034CM_Response_to_Regulation_25_consultees_280521_Redacted.pdfNot publishedView
_125 Part 2 21047-R1-LH-P03 Energy Statement_125_Part_2_21047-R1-LH-P03_Energy_Statement.pdfNot publishedView
_125 Part 1 21047-R1-LH-P03 Energy Statement_125_Part_1_21047-R1-LH-P03_Energy_Statement.pdfNot publishedView
_124 2021.04.09 H&W Fire Service Comments_124_2021.04.09_H&W_Fire_Service_Comments.pdfNot publishedView
_123 2021.04.07 West Mercia Police Comments_123_2021.04.07_West_Mercia_Police_Comments.pdfNot publishedView
_122 2021.04.07 STWL Comments_122_2021.04.07_STWL_Comments.pdfNot publishedView
_121 2021.04.07 County Public Health Comments_121_2021.04.07_County_Public_Health_Comments.pdfNot publishedView
_120 2021.04.06 Cycling UK Comments_120_2021.04.06_Cycling_UK_Comments.pdfNot publishedView
_119 2021.04.06 County Highways Comments_119_2021.04.06_County_Highways_Comments.pdfNot publishedView
_118 2021.04.05 County Landscape Comments_118_2021.04.05_County_Landscape_Comments.pdfNot publishedView
_117 2021.04.01 Natural England Comments_117_2021.04.01_Natural_England_Comments.pdfNot publishedView
_116 2021.04.01 County Sustainability Comments_116_2021.04.01_County_Sustainability_Comments.pdfNot publishedView
_115 2021.03.30 Kidderminster Civic Society Comments_115_2021.03.30_Kidderminster_Civic_Society_Comments.pdfNot publishedView
_114 2021.03.30 Ecology Comments_114_2021.03.30_Ecology_Comments.pdfNot publishedView
_113 2021.03.26 WWT Comments_113_2021.03.26_WWT_Comments.pdfNot publishedView
_112 2021.03.25 NWWM Comments_112_2021.03.25_NWWM_Comments.pdfNot publishedView
_111 2021.03.25 Bewdley TC Comments_111_2021.03.25_Bewdley_TC_Comments.pdfNot publishedView
_110 2021.03.23 WRS Air Quality & Contam Land Comments_110_2021.03.23_WRS_Air_Quality_&_Contam_Land_Comments.pdfNot publishedView
_109 2021.03.22 EA Comments_109_2021.03.22_EA_Comments.pdfNot publishedView
_108 2021.04.01 Natural England Comments on HRA AA_108_2021.04.01_Natural_England_Comments_on_HRA_AA.pdfNot publishedView
_107 2021.03.22 EA Comments on HRA AA_107_2021.03.22_EA_Comments_on_HRA_AA.pdfNot publishedView
_106 2021.03.11 Cadent Gas Comments_106_2021.03.11_Cadent_Gas_Comments.pdfNot publishedView
_105 2021.03.10 Kidderminster Town Council Comments_105_2021.03.10_Kidderminster_Town_Council_Comments.pdfNot publishedView
_104 2021.03.10 CRT Comments_104_2021.03.10_CRT_Comments.pdfNot publishedView
_103 2021.03.08 Hartlebury PC Comments_103_2021.03.08_Hartlebury_PC_Comments.pdfNot publishedView
_102 2021.02.25 Wychavon DC Comments_102_2021.02.25_Wychavon_DC_Comments.pdfNot publishedView
_101 2021.02.25 Highways England Comments_101_2021.02.25_Highways_England_Comments.pdfNot publishedView
_100 2021.02.25 Cadent Holding Comments_100_2021.02.25_Cadent_Holding_Comments.pdfNot publishedView
99 2021.02.22 WRS Noise Vibration Dust & Lighting Comments99_2021.02.22_WRS_Noise_Vibration_Dust_&_Lighting_Comments.pdfNot publishedView
98_2021.02.22_Historic_England_Comments98_2021.02.22_Historic_England_Comments.pdfNot publishedView
97_2021.02.18_PROW_Comments97_2021.02.18_PROW_Comments.pdfNot publishedView
96 Consultees List to upload on APAS96_Consultees_List_to_upload_on_APAS.pdfNot publishedView
13h Appendix 8.4 a 3 - Contextual Viewpoint 5, 6 & 713h_Appendix_8.4_a_3_-_Contextual_Viewpoint_5,_6_&_7.pdfNot publishedView
13h Appendix 8.4 a 2 - Contextual Viewpoint 3 & 413h_Appendix_8.4_a_2_-_Contextual_Viewpoint_3_&_4.pdfNot publishedView
13h Appendix 8.4 a 1 - Contextual Viewpoint 1 & 213h_Appendix_8.4_a_1_-_Contextual_Viewpoint_1_&_2.pdfNot publishedView
13g Appendix 8.3 d - Email re viewpoints13g_Appendix_8.3_d_-_Email_re_viewpoints.pdfNot publishedView
13f Appendix 8.3 c - Email re viewpoints13f_Appendix_8.3_c_-_Email_re_viewpoints.pdfNot publishedView
13e Appendix 8.3 b - Viewpoint Location Plan13e_Appendix_8.3_b_-_Viewpoint_Location_Plan.pdfNot publishedView
13d Appendix 8.3 a - Viewpoint 3 and 413d_Appendix_8.3_a_-_Viewpoint_3_and_4.pdfNot publishedView
13c Appendix 8.2 - Assessment Summary Tables13c_Appendix_8.2_-_Assessment_Summary_Tables.pdfNot publishedView
13b Appendix 8.1 - Method for Landscape and Visual Impact Assessment13b_Appendix_8.1_-_Method_for_Landscape_and_Visual_Impact_Assessment.pdfNot publishedView
13a Chapter 8 - Landscape and Visual Impact13a_Chapter_8_-_Landscape_and_Visual_Impact.pdfNot publishedView
12b Appendix 7.1 - Baseline Conditions Report12b_Appendix_7.1_-_Baseline_Conditions_Report.pdfNot publishedView
12a Chapter 7 - Historic Environment12a_Chapter_7_-_Historic_Environment.pdfNot publishedView
11 SUPERSEDED Chapter 6 - Need and Alternatives11_SUPERSEDED_Chapter_6_-_Need_and_Alternatives.pdfNot publishedView
10f Appendix 5.4 Proposed Cable Route10f_Appendix_5.4_Proposed_Cable_Route.pdfNot publishedView
10e Appendix 5.3 Materials Schedule10e_Appendix_5.3_Materials_Schedule.pdfNot publishedView
10d Appendix 5.2 Response Cadent10d_Appendix_5.2_Response_Cadent.pdfNot publishedView
10c Appendix 5.2 Email Cadent10c_Appendix_5.2_Email_Cadent.pdfNot publishedView
10b SUPERSEDED Appendix 5.1 A_ Part 2 Flood Risk Assessment and Drainage Management Strategy10b_SUPERSEDED_Appendix_5.1_A__Part_2_Flood_Risk_Assessment_and_Drainage_Management_Strategy.pdfNot publishedView
10b SUPERSEDED Appendix 5.1 A_ Part 1 Flood Risk Assessment and Drainage Management Strategy10b_SUPERSEDED_Appendix_5.1_A__Part_1_Flood_Risk_Assessment_and_Drainage_Management_Strategy.pdfNot publishedView
10a Chapter 5 - Development Description10a_Chapter_5_-_Development_Description.pdfNot publishedView
09 Chapter 4 - Planning Policy Context09_Chapter_4_-_Planning_Policy_Context.pdfNot publishedView
08 Chapter 3 - Site and Setting08_Chapter_3_-_Site_and_Setting.pdfNot publishedView
07o Appendix 2.3 PAC Report07o_Appendix_2.3_PAC_Report.pdfNot publishedView
07n Appendix 2.2 Fig 7 - Consultee Responses07n_Appendix_2.2_Fig_7_-_Consultee_Responses.pdfNot publishedView
07m Appendix 2.2 Fig 6 - Consultee Responses07m_Appendix_2.2_Fig_6_-_Consultee_Responses.pdfNot publishedView
07l Appendix 2.2 Fig 5 - Planning Application Boundary Plan07l_Appendix_2.2_Fig_5_-_Planning_Application_Boundary_Plan.pdfNot publishedView
07k Appendix 2.2 Fig 4 - Proposed Elevations - Additional Buildings07k_Appendix_2.2_Fig_4_-_Proposed_Elevations_-_Additional_Buildings.pdfNot publishedView
07j Appendix 2.2 Fig 3 - Proposed Site Plan - Additional Buildings07j_Appendix_2.2_Fig_3_-_Proposed_Site_Plan_-_Additional_Buildings.pdfNot publishedView
07i Appendix 2.2 Fig 2 - Site Location Plan07i_Appendix_2.2_Fig_2_-_Site_Location_Plan.pdfNot publishedView
07h Appendix 2.2 Fig 1 - EIA Scoping Opinion Request07h_Appendix_2.2_Fig_1_-_EIA_Scoping_Opinion_Request.pdfNot publishedView
07g Appendix 2.2 Scoping Opinion07g_Appendix_2.2_Scoping_Opinion.pdfNot publishedView
07f Appendix 2.1 Site Location Plan07f_Appendix_2.1_Site_Location_Plan.pdfNot publishedView
07e Appendix 2.1 Proposed Site Plan - Additional Buildings07e_Appendix_2.1_Proposed_Site_Plan_-_Additional_Buildings.pdfNot publishedView
07d Appendix 2.1 Proposed Elevations - Additional Buildings07d_Appendix_2.1_Proposed_Elevations_-_Additional_Buildings.pdfNot publishedView
07c Appendix 2.1 Planning Application Boundary Plan07c_Appendix_2.1_Planning_Application_Boundary_Plan.pdfNot publishedView
07b Appendix 2.1 EIA Scoping Opinion Request07b_Appendix_2.1_EIA_Scoping_Opinion_Request.pdfNot publishedView
07a Chapter 2 Scope of Environmental Statement07a_Chapter_2_Scope_of_Environmental_Statement.pdfNot publishedView
06 Chapter 1 Introduction of ES06_Chapter_1_Introduction_of_ES.pdfNot publishedView
05c Appendix J Drainage Strategy05c_Appendix_J_Drainage_Strategy.pdfNot publishedView
05b Appendix I Drainage Strategy05b_Appendix_I_Drainage_Strategy.pdfNot publishedView
05 Flood Risk Assessment and Drainage 3 of 305_Flood_Risk_Assessment_and_Drainage_3_of_3.pdfNot publishedView
05 Flood Risk Assessment and Drainage 2 of 305_Flood_Risk_Assessment_and_Drainage_2_of_3.pdfNot publishedView
05 Flood Risk Assessment and Drainage 1 of 305_Flood_Risk_Assessment_and_Drainage_1_of_3.pdfNot publishedView
04 Pre-Application Consultation Report04_Pre-Application_Consultation_Report.pdfNot publishedView
03q Appendix 4 to PS Validation Checklist03q_Appendix_4_to_PS_Validation_Checklist.pdfNot publishedView
03p Appendix 3 to PS Response from Cadent Gas03p_Appendix_3_to_PS__Response_from_Cadent_Gas.pdfNot publishedView
03o Appendix 3 to PS Email to Cadent Gas03o_Appendix_3_to_PS_Email_to_Cadent_Gas.pdfNot publishedView
03n Appendix 2 to PS Fig 7 Consultee responses03n_Appendix_2_to_PS_Fig_7_Consultee_responses.pdfNot publishedView
03m Appendix 2 to PS Fig 6 Consultee responses03m_Appendix_2_to_PS_Fig_6_Consultee_responses.pdfNot publishedView
03l Appendix 2 to PS Fig 5 - Planning Application Boundary Plan03l_Appendix_2_to_PS_Fig_5_-_Planning_Application_Boundary_Plan.pdfNot publishedView
03k Appendix 2 to PS Fig 4 - Proposed Elevations -Additional Buildings03k_Appendix_2_to_PS_Fig_4_-_Proposed_Elevations_-Additional_Buildings.pdfNot publishedView
03j Appendix 2 to PS Fig 3 - Proposed Site Plan - Additional Buildings03j_Appendix_2_to_PS_Fig_3_-_Proposed_Site_Plan_-_Additional_Buildings.pdfNot publishedView
03i Appendix 2 to PS Fig 2 - Site Location Plan03i_Appendix_2_to_PS_Fig_2_-_Site_Location_Plan.pdfNot publishedView
03h Appendix 2 to PS Fig 1 - EIA Scoping Opinion Request03h_Appendix_2_to_PS_Fig_1_-_EIA_Scoping_Opinion_Request.pdfNot publishedView
03g Appendix 2 to PS Scoping Opinion03g_Appendix_2_to_PS_Scoping_Opinion.pdfNot publishedView
03f Appendix 1 to PS Site Location Plan03f_Appendix_1_to_PS_Site_Location_Plan.pdfNot publishedView
03e Appendix 1 to PS Proposed Site Plan - Additional Buildings03e_Appendix_1_to_PS_Proposed_Site_Plan_-_Additional_Buildings.pdfNot publishedView
03d Appendix 1 to PS Proposed Elevations -Additional Buildings03d_Appendix_1_to_PS_Proposed_Elevations_-Additional_Buildings.pdfNot publishedView
03c Appendix 1 to PS Planning Application Boundary Plan03c_Appendix_1_to_PS_Planning_Application_Boundary_Plan.pdfNot publishedView
03b Appendix 1 to PS Scoping Opinion Request03b_Appendix_1_to_PS_Scoping_Opinion_Request.pdfNot publishedView
03a Planning Statement03a_Planning_Statement.pdfNot publishedView
02 Amended Application Form 2020.09.01_Redacted02_Amended_Application_Form_2020.09.01_Redacted.pdfNot publishedView
01 2020.09.01 Submission Contents Page01_2020.09.01_Submission_Contents_Page.pdfNot publishedView
_166 Public Notice re Decision_166_Public_Notice_re_Decision.pdfNot publishedView
_165 Decision Notice - Dated 29 September 2021_165_Decision_Notice_-_Dated_29_September_2021.pdfNot publishedView
_164 Committee Report Agenda Item 5 - Dated 28 September 2021_164_Committee_Report_Agenda_Item_5_-_Dated_28_September_2021.pdfNot publishedView
_163 Committee Presentation for Members_163_Committee_Presentation_for_Members.pdfNot publishedView
_162 2021.08.12 Ecology Comments_162_2021.08.12_Ecology_Comments.pdfNot publishedView
_161 2021.08.10 NWWM Comments_161_2021.08.10_NWWM_Comments.pdfNot publishedView
_160 2021.08.05 Natural England Comments_160_2021.08.05_Natural_England_Comments.pdfNot publishedView
_159 2021.08.04 County Arch Comments_159_2021.08.04_County_Arch_Comments.pdfNot publishedView
31 Proposed Fuel Reception and Energy Centre Elevations Sheet 131_Proposed_Fuel_Reception_and_Energy_Centre_Elevations_Sheet_1.pdfNot publishedView
30 Proposed Fuel Reception and Energy Centre Floor Plans30_Proposed_Fuel_Reception_and_Energy_Centre_Floor_Plans.pdfNot publishedView
29 Planning Application Boundary Plan29_Planning_Application_Boundary_Plan.pdfNot publishedView
28 Proposed Plastics Recovery Plant28_Proposed_Plastics_Recovery_Plant.pdfNot publishedView
27 Proposed Site Section Elevations - Additional Buildings27_Proposed_Site_Section_Elevations_-_Additional_Buildings.pdfNot publishedView
26 Proposed Site Plan - Additional Buildings26_Proposed_Site_Plan_-_Additional_Buildings.pdfNot publishedView
25 Existing Site Sections25_Existing_Site_Sections.pdfNot publishedView
24 Site Location Plan24_Site_Location_Plan.pdfNot publishedView
23 Amended Non Technical Summary23_Amended_Non_Technical_Summary.pdfNot publishedView
22 Chapter 17 - Summary & Conclusions22_Chapter_17_-_Summary_&_Conclusions.pdfNot publishedView
21 Chapter 16 - Amenity(1)21_Chapter_16_-_Amenity(1).pdfNot publishedView
20 Chapter 15 - Socio Economic20_Chapter_15_-_Socio_Economic.pdfNot publishedView
19 Chapter 14 - Climate Change19_Chapter_14_-_Climate_Change.pdfNot publishedView
18l Appendix 13.1 - Transport Assessment18l_Appendix_13.1_-_Transport_Assessment.pdfNot publishedView
18k Appendix 13.1 G - Changes In 2027 and 2032 Traffic Flows18k_Appendix_13.1_G_-_Changes_In_2027_and_2032_Traffic_Flows.pdfNot publishedView
18j Appendix 13.1 Figure 2 - Site and Local Transport Network18j_Appendix_13.1_Figure_2_-_Site_and_Local_Transport_Network.pdfNot publishedView
18i Appendix 13.1 Figure 1 - Site Location and Strategic Road Network18i_Appendix_13.1_Figure_1_-_Site_Location_and_Strategic_Road_Network.pdfNot publishedView
18h Appendix 13.1 F TEMPro Growth Rates18h_Appendix_13.1_F_TEMPro_Growth_Rates.pdfNot publishedView
18g Appendix 13.1 E - Public Transport Timetable18g_Appendix_13.1_E_-_Public_Transport_Timetable.pdfNot publishedView
18f Appendix 13.1 D Guide18f_Appendix_13.1_D_Guide.pdfNot publishedView
18e Appendix 13.1 C - Articulated HGV Service Yard Turns18e_Appendix_13.1_C_-_Articulated_HGV_Service_Yard_Turns.pdfNot publishedView
18d Appendix 13.1 C Vehicle Tracking - Articulated HGV Turns at A45118d_Appendix_13.1_C_Vehicle_Tracking_-_Articulated_HGV_Turns_at_A451.pdfNot publishedView
18c Appendix 13.1 B - Proposed Site Plan -Additional Buildings18c_Appendix_13.1__B_-_Proposed_Site_Plan_-Additional_Buildings.pdfNot publishedView
18b Appendix 13.1 A - 2014 Base Traffic Flows AM Peak Hour18b_Appendix_13.1_A_-_2014_Base_Traffic_Flows_AM_Peak_Hour.pdfNot publishedView
18a Chapter 13 - Traffic and Transportation18a_Chapter_13_-_Traffic_and_Transportation.pdfNot publishedView
17d Appendix 12.3 HRA Screening Letter17d_Appendix_12.3_HRA_Screening_Letter.pdfNot publishedView
17c Appendix 12.2 - SSSI Site of Special Scientific Interest Assessment17c_Appendix_12.2_-_SSSI_Site_of_Special_Scientific_Interest_Assessment.pdfNot publishedView
17b Appendix 12.1 - Preliminary Ecological Appraisal_Redacted17b_Appendix_12.1_-_Preliminary_Ecological_Appraisal_Redacted.pdfNot publishedView
17a Chapter 12 - Ecology17a_Chapter_12_-_Ecology.pdfNot publishedView
16b Appendix 11.1 to 11.3 - Appendix A - Glossary of Terminology16b_Appendix_11.1_to_11.3_-_Appendix_A_–_Glossary_of_Terminology.pdfNot publishedView
16a Chapter 11 - Noise and Vibration16a_Chapter_11_-_Noise_and_Vibration.pdfNot publishedView
15f Appendix 10.4_Part 2 - Phase I Ground Contamination Report15f_Appendix_10.4_Part_2_-_Phase_I_Ground_Contamination_Report.pdfNot publishedView
15f Appendix 10.4_Part 1 - Phase I Ground Contamination Report15f_Appendix_10.4_Part_1_-_Phase_I_Ground_Contamination_Report.pdfNot publishedView
15e Appendix 10.3_Redacted correspondence to EA re scope for updated Controlled Waters Detailed Quantitative Risk Assessment15e_Appendix_10.3_Redacted_correspondence_to_EA_re_scope_for_updated_Controlled_Waters_Detailed_Quantitative_Risk_Assessment.pdfNot publishedView
15d Appendix 10.2_Part 6 Supplementary Phase II Environmental Site Assessment15d_Appendix_10.2_Part_6_Supplementary_Phase_II_Environmental_Site_Assessment.pdfNot publishedView
15d Appendix 10.2 - Part 5 Supplementary Phase II Environmental Site Assessment15d_Appendix_10.2_-_Part_5_Supplementary_Phase_II_Environmental_Site_Assessment.pdfNot publishedView
15d Appendix 10.2 - Part 4 Supplementary Phase II Environmental Site Assessment15d_Appendix_10.2_-_Part_4_Supplementary_Phase_II_Environmental_Site_Assessment.pdfNot publishedView
15d Appendix 10.2 - Part 3 Supplementary Phase II Environmental Site Assessment15d_Appendix_10.2_-_Part_3_Supplementary_Phase_II_Environmental_Site_Assessment.pdfNot publishedView
15d Appendix 10.2 - Part 2 Supplementary Phase II Environmental Site Assessment15d_Appendix_10.2_-_Part_2_Supplementary_Phase_II_Environmental_Site_Assessment.pdfNot publishedView
15d Appendix 10.2 - Part 1 Supplementary Phase II Environmental Site Assessment15d_Appendix_10.2_-_Part_1_Supplementary_Phase_II_Environmental_Site_Assessment.pdfNot publishedView
15c Appendix 10.1 b - Phase 1 Preliminary Risk Assessment15c_Appendix_10.1_b_-_Phase_1_Preliminary_Risk_Assessment.pdfNot publishedView
15b Appendix 10.1 a - Phase I Preliminary Risk Assessment15b_Appendix_10.1_a_-_Phase_I_Preliminary_Risk_Assessment.pdfNot publishedView
15a SUPERSEDED Chapter 10 - Geo Environmental15a_SUPERSEDED_Chapter_10_-_Geo_Environmental.pdfNot publishedView
14e Appendix 9.4 - Air Quality Figures14e_Appendix_9.4_-_Air_Quality_Figures.pdfNot publishedView
14d Appendix 9.3 - Odour Management Plan14d_Appendix_9.3_-_Odour_Management_Plan.pdfNot publishedView
14c Appendix 9.2 - Dust Risk Assessment14c_Appendix_9.2_-_Dust_Risk_Assessment.pdfNot publishedView
14b Appendix 9.1 - Air Quality Adms 5 Inputs and Stack Height Assessment14b_Appendix_9.1_-_Air_Quality_Adms_5_Inputs_and_Stack_Height_Assessment.pdfNot publishedView
14a Chapter 9 - Air Quality and Human Health14a_Chapter_9_-_Air_Quality_and_Human_Health.pdfNot publishedView
13o Appendix 8.5 Trees - Arboricultural Report & Impact Assessment13o_Appendix_8.5_Trees_-_Arboricultural_Report_&_Impact_Assessment.pdfNot publishedView
13n Appendix 8.4 g 10 - Viewpoint 1013n_Appendix_8.4_g_9_-_Viewpoint_9_-_Including_3D_Photomontage.pdfNot publishedView
13n Appendix 8.4 g 9 - Viewpoint 9 - Including 3D Photomontage13n_Appendix_8.4_g_8_-_Viewpoint_8.pdfNot publishedView
13n Appendix 8.4 g 8 - Viewpoint 813n_Appendix_8.4_g_7_-_Viewpoint_7.pdfNot publishedView
13n Appendix 8.4 g 7 - Viewpoint 713n_Appendix_8.4_g_6_-_Viewpoint_6.pdfNot publishedView
13n Appendix 8.4 g 6 - Viewpoint 613n_Appendix_8.4_g_5_-_Viewpoint_5.pdfNot publishedView
13n Appendix 8.4 g 5 - Viewpoint 513n_Appendix_8.4_g_4_-_Viewpoint_4_-_Including_3D_Photomontage.pdfNot publishedView
13n Appendix 8.4 g 4 - Viewpoint 4 - Including 3D Photomontage13n_Appendix_8.4_g_3_-_Viewpoint_3_-_Including_3D_Photomontage.pdfNot publishedView
13n Appendix 8.4 g 3 - Viewpoint 3 - Including 3D Photomontage13n_Appendix_8.4_g_2_-_Viewpoint_2.pdfNot publishedView
13n Appendix 8.4 g 2 - Viewpoint 213n_Appendix_8.4_g_10_-_Viewpoint_10.pdfNot publishedView
13n Appendix 8.4 g 1 - Viewpoint 113n_Appendix_8.4_g_1_-_Viewpoint_1.pdfNot publishedView
13m Appendix 8.4 f - Viewpoint Location Plan13m_Appendix_8.4_f_-_Viewpoint_Location_Plan.pdfNot publishedView
13l Appendix 8.4 e - Landscape Character Plan13l_Appendix_8.4_e_-_Landscape_Character_Plan.pdfNot publishedView
13k Appendix 8.4 d - Landscape Constraints Plan13k_Appendix_8.4_d_-_Landscape_Constraints_Plan.pdfNot publishedView
13j Appendix 8.4 c - Zone of Theoretical Visibility Plans13j_Appendix_8.4_c_-_Zone_of_Theoretical_Visibility_Plans.pdfNot publishedView
13i Appendix 8.4 b - Topographic Plan13i_Appendix_8.4_b_-_Topographic_Plan.pdfNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Valid Date

    Published milestoneCouncil source
  3. Consultation Start Date

    Published milestoneCouncil source
  4. Site Visited / Site Notice Date

    Published milestoneCouncil source
  5. Consultation End

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Date

    Published milestoneCouncil source

Decision & conditions

Permitted
_166 Public Notice re Decision _165 Decision Notice - Dated 29 September 2021
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.