Council planning record

Construction and operation of an Incinerator Bottom Ash (IBA) Recycling Facility accepting 120,000 tonnes per annum along with ancillary/welfare facilities and operation of mobile equipment on site.

Veolia,Sandy Lane,Wildmoor,Bromsgrove,B61 0QT

RefusedReference: 13/000027/CMWorcestershire County Council

Last published check: 20 Sept 2026, 10:10. Check the council record for more recent changes.

Application location

Veolia,Sandy Lane,Wildmoor,Bromsgrove,B61 0QT

This record has no verified map location.

Application summary

Status
Refused
Application type
County Matter
Received
30 Apr 2013
Validated
3 May 2013
Determination deadline
Not published
Local authority
Worcestershire County Council

Application overview

Construction and operation of an Incinerator Bottom Ash (IBA) Recycling Facility accepting 120,000 tonnes per annum along with ancillary/welfare facilities and operation of mobile equipment on site.

Proposal details

Reference
13/000027/CM
Parish
Belbroughton
Agent
Miss Belinder Gill, Veolia Environmental Services

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 212 of 212

DocumentPublishedAction
Minutes - 1st November 2016Minutes_-_1st_November_2016.pdfNot publishedView
Press Notice (Dated 9th November 2016)Press_Notice_(Dated_9th_November_2016).pdfNot publishedView
Refusal Planning PermissionRefusal_Planning_Permission.pdfNot publishedView
Judicial Review 1Judicial_Review_1.pdfNot publishedView
Final Report PackFinal_Report_Pack.pdfNot publishedView
15 Chapter 5 Waste Policy and Legislation15_Chapter_5_Waste_Policy_and_Legislation.pdfNot publishedView
14 Chapter 4 Development Description14_Chapter_4_Development_Description.pdfNot publishedView
13 Chapter 3 Alternatives13_Chapter_3_Alternatives.pdfNot publishedView
12 Chapter 2 Scoping and Key Issues12_Chapter_2_Scoping_and_Key_Issues.pdfNot publishedView
11 Chapter 1 Introduction11_Chapter_1_Introduction.pdfNot publishedView
10 Environmental Statement Contents Page10_Environmental_Statement_Contents_Page.pdfNot publishedView
09 Environmental Statement Front Cover09_Environmental_Statement_Front_Cover.pdfNot publishedView
08 Environmental Statement Non-Technical Summary08_Environmental_Statement_Non-Technical_Summary.pdfNot publishedView
07 Design and Access Statement07_Design_and_Access_Statement.pdfNot publishedView
06 Planning Supporting Statement Appendix B - Sandy Lane survey of additional area06_Planning_Supporting_Statement_Appendix_B_-_Sandy_Lane_survey_of_additional_area.pdfNot publishedView
05 Planning Supporting Statement Appendix B - Sandy Lane survey of additional area - Figures05_Planning_Supporting_Statement__Appendix_B_-_Sandy_Lane_survey_of_additional_area_-_Figures.pdfNot publishedView
04 Planning Supporting Statement Appendix A - Mineral and Secondary Aggregate Assessment04_Planning_Supporting_Statement_Appendix_A_-_Mineral_and_Secondary_Aggregate_Assessment.pdfNot publishedView
03 Planning Supporting Statement03_Planning_Supporting_Statement.pdfNot publishedView
02 Covering Letter02_Covering_Letter.pdfNot publishedView
01 Application Form01_ApplicationFormNoPersonalData.pdfNot publishedView
REG22 - 99 BPL_PA_2_001 Part A v6 2012#104499_BPL_PA_2_001_Part_A_v6_2012#1044.pdfNot publishedView
REG22 - 98 BPL_PA_1_021 Environmental Policy 2012#7F6098_BPL_PA_1_021_Environmental_Policy_2012#7F60.pdfNot publishedView
REG22 - 97 BPL_PA_1_020 P011 Emergency Preparedness Procedure#D7E397_BPL_PA_1_020_P011_Emergency_Preparedness_Procedure#D7E3.pdfNot publishedView
REG22 - 96 BPL_PA_1_019 IBA Stockpiles - Dust potential letter#A23696_BPL_PA_1_019_IBA_Stockpiles_-_Dust_potential_letter#A236.pdfNot publishedView
REG22 - 95 BPL_PA_1_018 P006 Dust Management Plan#53EC95_BPL_PA_1_018_P006_Dust_Management_Plan#53EC.pdfNot publishedView
REG22 - 94 BPL_PA_1_017 Waste accepted on site#D74694_BPL_PA_1_017_Waste_accepted_on_site#D746.pdfNot publishedView
REG22 - 93 BPL_PA_1_016 P005 Acceptance Criteria#B6B393_BPL_PA_1_016_P005_Acceptance_Criteria#B6B3.pdfNot publishedView
REG22 - 92 BPL_PA_1_015 BPL P 001 Accidents incidents reporting procedure#F60592_BPL_PA_1_015_BPL_P_001_Accidents_incidents_reporting_procedure#F605.pdfNot publishedView
REG22 - 91 BPL_PA_1_014 Objectives Program#576D91_BPL_PA_1_014_Objectives_Program#576D.pdfNot publishedView
REG22 - 90 BPL_PA_1_013 SGN5.06 Recovery and disposal of non hazardous waste#37B590_BPL_PA_1_013_SGN5.06_Recovery_and_disposal_of_non_hazardous_waste#37B5.pdfNot publishedView
REG22 - 89 BPL_PA_1_012 Plant List example#992089_BPL_PA_1_012_Plant_List_example#9920.pdfNot publishedView
REG22 - 88 BPL_PA_1_011 BS EN ISO 14001 EMS 523409 2013#454888_BPL_PA_1_011_BS_EN_ISO_14001_EMS_523409_2013#4548.pdfNot publishedView
REG22 - 87 BPL_PA_1_010Layout-Drainage Plan#20FF87_BPL_PA_1_010Layout-Drainage_Plan#20FF.pdfNot publishedView
REG22 - 86 BPL_PA_1_009 002 Sandy Lane Site Boundary#F7EB86_BPL_PA_1_009_002_Sandy_Lane_Site_Boundary#F7EB.pdfNot publishedView
REG22 - 85 BPL_PA_1_008 EP RA Sandy Lane#C67685_BPL_PA_1_008_EP_RA_Sandy_Lane#C676.pdfNot publishedView
REG22 - 84 BPL_PA_1_007 Site condition report Sandy Lane#2CD984_BPL_PA_1_007_Site_condition_report_Sandy_Lane#2CD9.pdfNot publishedView
REG22 - 83 BPL_PA_1_006 Non_technical_summary Sandy Lane#A0EC83_BPL_PA_1_006_Non_technical_summary_Sandy_Lane#A0EC.pdfNot publishedView
REG22 - 82 BPL_PA_1_005 Opra score sheet#24D982_BPL_PA_1_005_Opra_score_sheet#24D9.pdfNot publishedView
REG22 - 81 BPL_PA_1_004 Part F1 v7 2012 Sandy Lane#E4AB81_BPL_PA_1_004_Part_F1_v7_2012_Sandy_Lane#E4AB.pdfNot publishedView
REG22 - 80 BPL_PA_1_003 Part B3 - New bespoke installation permit#CF8B80_BPL_PA_1_003_Part_B3_–_New_bespoke_installation_permit#CF8B.pdfNot publishedView
REG22 - 79 BPL_PA_1_002 Part B2 v6 2012#440F79_BPL_PA_1_002_Part_B2_v6_2012#440F.pdfNot publishedView
REG22 - 78 BPL_PA_1_001 Part A v6 2012#564378_BPL_PA_1_001_Part_A_v6_2012#5643.pdfNot publishedView
REG22 - 77 BPL_PA1_000 Application Letter - Sandy Lane#DA9477_BPL_PA1_000_Application_Letter_-_Sandy_Lane#DA94.pdfNot publishedView
REG22 - 76 Appendix A - Mineral & Secondary Aggregates Assessment Mar 1676_Appendix_A_-_Mineral_&_Secondary_Aggregates_Assessment__Mar_16.pdfNot publishedView
REG22 - 75 Veolia Sandy Lane IBA Policy Update March 201675_Veolia_Sandy_Lane_IBA_Policy_Update_March_2016.pdfNot publishedView
REG22 - 74 Veolia Schedule of Additional Information_Regulation 2274_Veolia_Schedule_of_Additional_Information_Regulation_22.pdfNot publishedView
REG22 - 73 Veolia Clarifications 13_000027_CM73_Veolia_Clarifications_13_000027_CM.pdfNot publishedView
REG22 - 72 Veolia Regulation 22 13_000027_CM72_Veolia_Regulation_22___13_000027_CM.pdfNot publishedView
REG22 - 71 Veolia Covering letter71_Veolia_Covering_letter.pdfNot publishedView
REG22 - 190 Public Notice (Dated 27th April 2016)190_Public_Notice_(Dated_27th_April_2016).pdfNot publishedView
REG22 - 189 EPR-XP3030VM-A001_Decision Document189_EPR-XP3030VM-A001_Decision_Document.pdfNot publishedView
REG22 - 188 Application New Bespoke - PI Schedul188_Application_New_Bespoke_-_PI_Schedule.pdfNot publishedView
REG22 - 187 Application New Bespoke - PI Notice187_Application_New_Bespoke_-_PI_Notice.pdfNot publishedView
REG22 - 186 Application New Bespoke - PI Letter186_Application_New_Bespoke_-_PI_Letter.pdfNot publishedView
REG22 - 185 Application New Bespoke - Permit Issued (PDF)185_Application_New_Bespoke_-_Permit_Issued_(PDF).pdfNot publishedView
REG22 - 184 Application New Bespoke - Issue Letter to Registered Office184_Application_New_Bespoke_-_Issue_Letter_to_Registered_Office.pdfNot publishedView
REG22 - 183 BPL_PAD_05_001SANDY LANE - PERMIT CONSULTATION RESPONSES 20-10-15#C0D9183_BPL_PAD_05_001SANDY_LANE_–_PERMIT_CONSULTATION_RESPONSES_20-10-15#C0D9.pdfNot publishedView
REG22 - 182 BPL_PAD_04_001 Permit Site Plan#AF4D182_BPL_PAD_04_001_Permit_Site_Plan#AF4D.pdfNot publishedView
REG22 - 181 Chapter_7_Ecology181_Chapter_7_Ecology.pdfNot publishedView
REG22 - 180 Appendix_7_1_ecology_report180_Appendix_7_1_ecology_report.pdfNot publishedView
REG22 - 179 BPL_PS5N_03_005 Sch 5 Notice Covering Letter 21-05-15#6C3B179_BPL_PS5N_03_005_Sch_5_Notice_Covering_Letter_21-05-15#6C3B.pdfNot publishedView
REG22 - 178 BPL_PS5N_03_004EA Schedule 5 Response_AQ Assessment_Sandy Lane_21-04-15_final#F94A178_BPL_PS5N_03_004EA_Schedule_5_Response_AQ_Assessment_Sandy_Lane_21-04-15_final#F94A.pdfNot publishedView
REG22 - 177 BPL_PS5N_03_003 Sandy Lane Noise Modelling Information Storage Options#500E177_BPL_PS5N_03_003_Sandy_Lane_Noise_Modelling_Information_Storage_Options#500E.pdfNot publishedView
REG22 - 176 BPL_PS5N_03_002 Sandy Lane IBA facility_BAT Assessment_Rev D_Final#B75E176_BPL_PS5N_03_002_Sandy_Lane_IBA_facility_BAT_Assessment_Rev_D_Final#B75E.pdfNot publishedView
REG22 - 175 BPL_PS5N_03_001 KU027600-0001#18E6175_BPL_PS5N_03_001_KU027600-0001#18E6.pdfNot publishedView
REG22 - 174 Schedule 5-2 Clarification Letter 29.01.15174_Schedule_5-2_Clarification_Letter_29.01.15.pdfNot publishedView
REG22 - 173 BPL_PS5N_02_018 Spill Kit and Fire Extinguisher location Plan#B2E5173_BPL_PS5N_02_018_Spill_Kit_and_Fire_Extinguisher_location_Plan#B2E5.pdfNot publishedView
REG22 - 172 BPL_PS5N_02_017 Sch 5 Notice 050814 Covering Letter#37E5172_BPL_PS5N_02_017_Sch_5_Notice_050814_Covering_Letter#37E5.pdfNot publishedView
REG22 - 171b BPL_PS5N_02_016 Noise Modelling Information Storage Op - Source Calculations171b_BPL_PS5N_02_016_Noise_Modelling_Information_Storage_Op_-_Source_Calculations.pdfNot publishedView
REG22 - 171a BPL_PS5N_02_016 Sandy Lane Noise Modelling Information Storage Options171a_BPL_PS5N_02_016_Sandy_Lane_Noise_Modelling_Information_Storage_Options.pdfNot publishedView
REG22 - 170 BPL_PS5N_02_015 Particulate Monitoring Location Plan#6260170_BPL_PS5N_02_015_Particulate_Monitoring_Location_Plan#6260.pdfNot publishedView
REG22 - 169 BPL_PS5N_02_014 P008 v3 Incident Non-conformance Corrective & Preventive Action#B136169_BPL_PS5N_02_014_P008_v3_Incident_Non-conformance_Corrective_&_Preventive_Action#B136.pdfNot publishedView
REG22 - 168 BPL_PS5N_02_013 model results#953D168_BPL_PS5N_02_013_model_results#953D.pdfNot publishedView
REG22 - 167 BPL_PS5N_02_012 model inputs#5C3B167_BPL_PS5N_02_012_model_inputs#5C3B.pdfNot publishedView
REG22 - 166 BPL_PS5N_02_011 KU027600_Sandy Lane Lagoon Monitoring Plan_Rev 1#656F166_BPL_PS5N_02_011_KU027600_Sandy_Lane_Lagoon_Monitoring_Plan_Rev_1#656F.pdfNot publishedView
REG22 - 165 BPL_PS5N_02_010 KU027600_Lagoon & Hard-standing Design_Rev1.0_27112014#6C96165_BPL_PS5N_02_010_KU027600_Lagoon_&_Hard-standing_Design_Rev1.0_27112014#6C96.pdfNot publishedView
REG22 - 164 BPL_PS5N_02_009 KU027600_Sandy Lane IBA_BAT Assessment_Rev1.0_28112014#9A2D164_BPL_PS5N_02_009_KU027600_Sandy_Lane_IBA_BAT_Assessment_Rev1.0_28112014#9A2D.pdfNot publishedView
REG22 - 163 BPL_PS5N_02_008KU027600_Sandy Lane GWMP_Rev1.0_27112014#6425163_BPL_PS5N_02_008KU027600_Sandy_Lane_GWMP_Rev1.0_27112014#6425.pdfNot publishedView
REG22 - 162 BPL_PS5N_02_007 Fuel Tank Specification#9024162_BPL_PS5N_02_007_Fuel_Tank_Specification#9024.pdfNot publishedView
REG22 - 161 BPL_PS5N_02_006 FOO1 v3 Accident Management Plan 24 System in place#FC61161_BPL_PS5N_02_006_FOO1_v3_Accident_Management_Plan_24_System_in_place#FC61.pdfNot publishedView
REG22 - 160 BPL_PS5N_02_005 FOO1 v3 Accident Management Plan 24 Risk#010B160_BPL_PS5N_02_005_FOO1_v3_Accident_Management_Plan_24_Risk#010B.pdfNot publishedView
REG22 - 159b BPL_PS5N_02_004 DRA Annex C#5739 model results159b_BPL_PS5N_02_004_DRA_Annex_C#5739_model_results.pdfNot publishedView
REG22 - 159a BPL_PS5N_02_004 DRA Annex C#5739 model inputs159a_BPL_PS5N_02_004_DRA_Annex_C#5739_model_inputs.pdfNot publishedView
REG22 - 158 BPL_PS5N_02_003 Chapter_6_AirQuality#74DB158_BPL_PS5N_02_003_Chapter_6_AirQuality#74DB.pdfNot publishedView
REG22 - 157 BPL_PS5N_02_001 Response to SGN5 06 and BAT v4#9EE6157_BPL_PS5N_02_001_Response_to_SGN5_06_and_BAT_v4#9EE6.pdfNot publishedView
REG22 - 156 BPL_PS5N_01_022 wi_bref_0806#747B156_BPL_PS5N_01_022_wi_bref_0806#747B.pdfNot publishedView
REG22 - 155 BPL_PS5N_01_021 Stockpile Area Calculation#26B9155_BPL_PS5N_01_021_Stockpile_Area_Calculation#26B9.pdfNot publishedView
REG22 - 154 BPL_PS5N_01_020 Site infrastucture response#2E0A154_BPL_PS5N_01_020_Site_infrastucture_response#2E0A.pdfNot publishedView
REG22 - 153 BPL_PS5N_01_019 Schedule 5 Submission Response letter 07-07-14#5578153_BPL_PS5N_01_019_Schedule_5_Submission_Response_letter_07-07-14#5578.pdfNot publishedView
REG22 - 152 BPL_PS5N_01_018 Schedule 5 Cover Letter#A06D152_BPL_PS5N_01_018_Schedule_5_Cover_Letter#A06D.pdfNot publishedView
REG22 - 151 BPL_PS5N_01_017 PLAN_IBA_Construction_Details#4710151_BPL_PS5N_01_017_PLAN_IBA_Construction_Details#4710.pdfNot publishedView
REG22 - 150 BPL_PS5N_01_016 P016 v2 Dust Monitoring#3BEA150_BPL_PS5N_01_016_P016_v2_Dust_Monitoring#3BEA.pdfNot publishedView
REG22 - 149 BPL_PS5N_01_015 P005 Acceptance Criteria v3 07.06.14#F559149_BPL_PS5N_01_015_P005_Acceptance_Criteria_v3_07.06.14#F559.pdfNot publishedView
REG22 - 148 BPL_PS5N_01_014 F001 v1 SL Accident Managemnt Plan 01.07.14 Systems in Place#F78F148_BPL_PS5N_01_014_F001_v1_SL_Accident_Managemnt_Plan_01.07.14_Systems_in_Place#F78F.pdfNot publishedView
REG22 - 147 BPL_PS5N_01_013 F001 v1 SL Accident Managemnt Plan 01.07.14 Risk Assessment#DC56147_BPL_PS5N_01_013_F001_v1_SL_Accident_Managemnt_Plan_01.07.14_Risk_Assessment#DC56.pdfNot publishedView
REG22 - 146 BPL_PS5N_01_012 Example of generator specification#68CD146_BPL_PS5N_01_012_Example_of_generator_specification#68CD.pdfNot publishedView
REG22 - 145 BPL_PS5N_01_011 Example of fuel tank#8AAF145_BPL_PS5N_01_011_Example_of_fuel_tank#8AAF.pdfNot publishedView
REG22 - 144 BPL_PS5N_01_010 ES Groundwater Monitoring Plan extract#E274144_BPL_PS5N_01_010_ES_Groundwater_Monitoring_Plan_extract#E274.pdfNot publishedView
REG22 - 143 BPL_PS5N_01_009 EC Declaration of Conformity for example fuel tank#0583143_BPL_PS5N_01_009_EC_Declaration_of_Conformity_for_example_fuel_tank#0583.pdfNot publishedView
REG22 - 142 BPL_PS5N_01_008 BPL QMS P 002 v1 Storage and Handling#AB9F142_BPL_PS5N_01_008_BPL_QMS_P_002_v1_Storage_and_Handling#AB9F.pdfNot publishedView
REG22 - 141 BPL_PS5N_01_007 BPL Material Storage Options Appraisal Draft v2 07-07-14#12EC141_BPL_PS5N_01_007_BPL_Material_Storage_Options_Appraisal_Draft_v2_07-07-14#12EC.pdfNot publishedView
REG22 - 140 BPL_PS5N_01_006 Application Bespoke Schedule 5 Notice#EC86140_BPL_PS5N_01_006_Application_Bespoke_Schedule_5_Notice#EC86.pdfNot publishedView
REG22 - 139 BPL_PS5N_01_005 Appendix_9_1_Flood_risk#ACD5139_BPL_PS5N_01_005_Appendix_9_1_Flood_risk#ACD5.pdfNot publishedView
REG22 - 138 BPL_PS5N_01_004 Accident Management Plan v1#C7BF138_BPL_PS5N_01_004_Accident_Management_Plan_v1#C7BF.pdfNot publishedView
REG22 - 137 BPL_PS5N_01_003 Chapter 8 Noise assessment#9423137_BPL_PS5N_01_003_Chapter_8_Noise_assessment#9423.pdfNot publishedView
REG22 - 136 BPL_PS5N_01_002 Chapter_9_hydrology#418E136_BPL_PS5N_01_002_Chapter_9_hydrology#418E.pdfNot publishedView
REG22 - 135 BPL_PS5N_01_001 Response to SGN5 06 and BAT v3#5133135_BPL_PS5N_01_001_Response_to_SGN5_06_and_BAT_v3#5133.pdfNot publishedView
REG22 - 134 BPL_PAD_01_001 Sandy Lane_water balance calcs_V2#2DD9134_BPL_PAD_01_001_Sandy_Lane_water_balance_calcs_V2#2DD9.pdfNot publishedView
REG22 - 133 Sandy Lane Table of Contents133_Sandy_Lane_Table_of_Contents.pdfNot publishedView
REG22 - 132 EPR-XP3030VM-A001 response to not duly made letter Draft 27-03-14132_EPR-XP3030VM-A001_response_to_not_duly_made_letter_Draft_27-03-14.pdfNot publishedView
REG22 - 131 BPL_PA_2_033 Plan Site Context#B058131_BPL_PA_2_033_Plan_Site_Context#B058.pdfNot publishedView
REG22 - 130c BPL_PA_2_032c Appendix 8.2 Measurement sheet NMP02#A739130c_BPL_PA_2_032c_Appendix_8.2_Measurement_sheet_NMP02#A739.pdfNot publishedView
REG22 - 130b BPL_PA_2_032b Appendix 8.1 Measurement sheet NMP01#D48E130b_BPL_PA_2_032b_Appendix_8.1_Measurement_sheet_NMP01#D48E.pdfNot publishedView
REG22 - 130a BPL_PA_2_032a Chapter 8 Noise assessment#9BE0130a_BPL_PA_2_032a_Chapter_8_Noise_assessment#9BE0.pdfNot publishedView
REG22 - 129d BPL_PA_2_031d Plan_IBA_Building_Plan#D4C4129d_BPL_PA_2_031d_Plan_IBA_Building_Plan#D4C4.pdfNot publishedView
REG22 - 129c BPL_PA_2_031c Plan_IBA_Building_Elevations#343A129c_BPL_PA_2_031c_Plan_IBA_Building_Elevations#343A.pdfNot publishedView
REG22 - 129b BPL_PA_2_031b Plan_IBA_Construction_Details#4E8E129b_BPL_PA_2_031b_Plan_IBA_Construction_Details#4E8E.pdfNot publishedView
REG22 - 129a BPL_PA_2_031a Plan_Proposed_Sections#BBF4129a_BPL_PA_2_031a_Plan_Proposed_Sections#BBF4.pdfNot publishedView
REG22 - 128 BPL_PA_2_030 Chapter_7_Ecology#509F128_BPL_PA_2_030_Chapter_7_Ecology#509F.pdfNot publishedView
REG22 - 127d BPL_PA_2_029d BPL Fugitive Emissions Management Plan v5#D077127d_BPL_PA_2_029d_BPL_Fugitive_Emissions_Management_Plan_v5#D077.pdfNot publishedView
REG22 - 127c BPL_PA_2_029c BPL Fugitive Emissions Management Plan v5#CA9E127c_BPL_PA_2_029c_BPL_Fugitive_Emissions_Management_Plan_v5#CA9E.pdfNot publishedView
REG22 - 127b BPL_PA_2_029b BPL Fugitive Emissions Management Plan v5.3#5F4F127b_BPL_PA_2_029b_BPL_Fugitive_Emissions_Management_Plan_v5.3#5F4F.pdfNot publishedView
REG22 - 127a BPL_PA_2_029a BPL Fugitive Emissions Management Plan v5.2#0603127a_BPL_PA_2_029a_BPL_Fugitive_Emissions_Management_Plan_v5.2#0603.pdfNot publishedView
REG22 - 126e BPL_PA_2_028e Chapter_9_Figure_9_4_Hydrological_model#50AF126e_BPL_PA_2_028e_Chapter_9_Figure_9_4_Hydrological_model#50AF.pdfNot publishedView
REG22 - 126d BPL_PA_2_028d Chapter_9_Figure_9_3_Groundwater#E241126d_BPL_PA_2_028d_Chapter_9_Figure_9_3_Groundwater#E241.pdfNot publishedView
REG22 - 126c BPL_PA_2_028c Chapter_9_Figure_9_2_Geology#FE61126c_BPL_PA_2_028c_Chapter_9_Figure_9_2_Geology#FE61.pdfNot publishedView
REG22 - 126b BPL_PA_2_028b Chapter_9_Figure_9_1_Hydrology_Features#1988126b_BPL_PA_2_028b_Chapter_9_Figure_9_1_Hydrology_Features#1988.pdfNot publishedView
REG22 - 126a BPL_PA_2_028a Chapter_9_hydrology#38F8126a_BPL_PA_2_028a_Chapter_9_hydrology#38F8.pdfNot publishedView
REG22 - 125d BPL_PA_2_027d EU Skills Ltd CMS - requirements v2 Nov 2013#2DC3125d_BPL_PA_2_027d_EU_Skills_Ltd_CMS_-_requirements_v2_Nov_2013#2DC3.pdfNot publishedView
REG22 - 125c BPL_PA_2_27c Competence Management System - Guidance v4 Nov 2013#34E3125c_BPL_PA_2_27c_Competence_Management_System_-_Guidance_v4_Nov_2013#34E3.pdfNot publishedView
REG22 - 125b BPL_PA_2_027bP002 v2 APR 12 Technical Competence#97C7125b_BPL_PA_2_027bP002_v2_APR_12_Technical_Competence#97C7.pdfNot publishedView
REG22 - 125a BPL_PA_2_027a Ballast Phoenix EPA Technical Competence Sandy Lane#6FA1125a_BPL_PA_2_027a_Ballast_Phoenix_EPA_Technical_Competence_Sandy_Lane#6FA1.pdfNot publishedView
REG22 - 124 BPL_PA_2_026 Management Summary v2#9A75124_BPL_PA_2_026_Management_Summary_v2#9A75.pdfNot publishedView
REG22 - 123 BPL_PA_2_025 P009 Document and Data Retention#0D39123_BPL_PA_2_025_P009_Document_and_Data_Retention#0D39.pdfNot publishedView
REG22 - 122 BPL_PA_2_024 P013 Waste Transfer Procedure#C797122_BPL_PA_2_024_P013_Waste_Transfer_Procedure#C797.pdfNot publishedView
REG22 - 121 BPL_PA_2_023 P011A Procedure for general spillage#A233121_BPL_PA_2_023_P011A_Procedure_for_general_spillage#A233.pdfNot publishedView
REG22 - 120 BPL_PA_2_022 P008 Non-conformance and Corrective and Preventive Action#1A2B120_BPL_PA_2_022_P008_Non-conformance_and_Corrective_and_Preventive_Action#1A2B.pdfNot publishedView
REG22 - 119 BPL_PA_2_021 Environmental Policy 2012#DF4B119_BPL_PA_2_021_Environmental_Policy_2012#DF4B.pdfNot publishedView
REG22 - 118 BPL_PA_2_020 P011 Emergency Preparedness Procedure#7F61118_BPL_PA_2_020_P011_Emergency_Preparedness_Procedure#7F61.pdfNot publishedView
REG22 - 117 BPL_PA_2_019 IBA Stockpiles - Dust potential letter#9287117_BPL_PA_2_019_IBA_Stockpiles_-_Dust_potential_letter#9287.pdfNot publishedView
REG22 - 116 BPL_PA_2_018 P006 Dust Management Plan#E114116_BPL_PA_2_018_P006_Dust_Management_Plan#E114.pdfNot publishedView
REG22 - 115 BPL_PA_2_017 Waste accepted on site#234A115_BPL_PA_2_017_Waste_accepted_on_site#234A.pdfNot publishedView
REG22 - 114 BPL_PA_2_016 P005 Acceptance Criteria#8D15114_BPL_PA_2_016_P005_Acceptance_Criteria#8D15.pdfNot publishedView
REG22 - 113 BPL_PA_2_015 BPL P 001 Accidents incidents reporting procedure#4182113_BPL_PA_2_015_BPL_P_001_Accidents_incidents_reporting_procedure#4182.pdfNot publishedView
REG22 - 112 BPL_PA_2_014 Objectives Program#9400112_BPL_PA_2_014_Objectives_Program#9400.pdfNot publishedView
REG22 - 111 BPL_PA_2_013 Response to SGN5 06 and BAT v2#4D32111_BPL_PA_2_013_Response_to_SGN5_06_and_BAT_v2#4D32.pdfNot publishedView
REG22 - 110 BPL_PA_2_012 BPL Proposed Plant List 0815#AE83110_BPL_PA_2_012_BPL_Proposed_Plant_List_0815#AE83.pdfNot publishedView
REG22 - 109 BPL_PA_2_011 BS EN ISO 14001 EMS Certificate#805D109_BPL_PA_2_011_BS_EN_ISO_14001_EMS_Certificate#805D.pdfNot publishedView
REG22 - 108 BPL_PA_2_010 Layout-Drainage Plan#3596108_BPL_PA_2_010_Layout-Drainage_Plan#3596.pdfNot publishedView
REG22 - 107 BPL_PA_2_009 BPL 002 Sandy Lane Site Boundary#61B8107_BPL_PA_2_009_BPL_002_Sandy_Lane_Site_Boundary#61B8.pdfNot publishedView
REG22 - 106 BPL_PA_2_008 EP RA Sandy Lane#E3FB106_BPL_PA_2_008_EP_RA_Sandy_Lane#E3FB.pdfNot publishedView
REG22 - 105 BPL_PA_2_007 Site condition report Sandy Lane v2#89C2105_BPL_PA_2_007_Site_condition_report_Sandy_Lane_v2#89C2.pdfNot publishedView
REG22 - 104 BPL_PA_2_006 Non_technical_summary Sandy Lane#83CA104_BPL_PA_2_006_Non_technical_summary_Sandy_Lane#83CA.pdfNot publishedView
REG22 - 103 BPL_PA_2_005 Opra score sheet v2#0BEA103_BPL_PA_2_005_Opra_score_sheet_v2#0BEA.pdfNot publishedView
REG22 - 102 BPL_PA_2_004 Part F1 v7 2012 Sandy Lane v2#D354102_BPL_PA_2_004_Part_F1_v7_2012_Sandy_Lane_v2#D354.pdfNot publishedView
REG22 - 101 BPL_PA_2_003 Part B3 - New bespoke installation permit v2#792E101_BPL_PA_2_003_Part_B3_–_New_bespoke_installation_permit_v2#792E.pdfNot publishedView
REG22 - 100 BPL_PA_2_002 Part B2 v6 2012 v2#5D71100_BPL_PA_2_002_Part_B2_v6_2012_v2#5D71.pdfNot publishedView
70 Public Notice (Dated 29 May 2013)70_Public_Notice_(Dated_29_May_2013).pdfNot publishedView
69 Plan - Proposed Sections69_Plan_-_Proposed_Sections.pdfNot publishedView
68 Plan - Existing Site Levels68_Plan_-_Existing_Site_Levels.pdfNot publishedView
67 Plan - Existing Sections67_Plan_-_Existing_Sections.pdfNot publishedView
66 Plan - Location Plan66_Plan_-_Location_Plan.pdfNot publishedView
65 Plan - Site Context65_Plan_-_Site_Context.pdfNot publishedView
64 IBA Construction Details64_IBA_Construction_Details.pdfNot publishedView
63 IBA Building Elevations63_IBA_Building_Elevations.pdfNot publishedView
62 IBA Building Plan62_IBA_Building_Plan.pdfNot publishedView
61 Plan - IBA Site Levels Layout61_Plan_-_IBA_Site_Levels_Layout.pdfNot publishedView
60 Alternative Site Assessment - Appendix C60_Alternative_Site_Assessment_-_Appendix_C.pdfNot publishedView
59 Alternative Site Assessment - Appendix B59_Alternative_Site_Assessment_-_Appendix_B.pdfNot publishedView
58 Alternative Site Assessment - Appendix A58_Alternative_Site_Assessment_-_Appendix_A.pdfNot publishedView
57 Alternative Site Assessment Willenhall Lane57_Alternative_Site_Assessment_Willenhall_Lane.pdfNot publishedView
56 Alternative Site Assessment - Sandy Lane56_Alternative_Site_Assessment_-_Sandy_Lane.pdfNot publishedView
55 Alternative Site Assessment - Middlemore Road55_Alternative_Site_Assessment_-_Middlemore_Road.pdfNot publishedView
54 Alternative Site Assessment - Darlaston Road54_Alternative_Site_Assessment_-_Darlaston_Road.pdfNot publishedView
53 Alternative Site Assessment - Bloomfield Road53_Alternative_Site_Assessment_-_Bloomfield_Road.pdfNot publishedView
52 Alternative Site Assessment - Bentley52_Alternative_Site_Assessment_-_Bentley.pdfNot publishedView
51 Alternative Site Assessment - Figure 1 Site Context51_Alternative_Site_Assessment_-_Figure_1_Site_Context.pdfNot publishedView
50 Alternative Site Assessment50_Alternative_Site_Assessment.pdfNot publishedView
49 Appendix 9 4 Consultation Responses49_Appendix_9_4_Consultation_Responses.pdfNot publishedView
48 Appendix 9.3 Comparision of IBA Leachate to the Water Supply (Water Quality) Regulations 200048_Appendix_9.3_Comparision_of_IBA_Leachate_to_the_Water_Supply_(Water_Quality)_Regulations_2000.pdfNot publishedView
47 Appendix 9.2 Hydrogeological Conceptual Site Model47_Appendix_9.2_Hydrogeological_Conceptual_Site_Model.pdfNot publishedView
46 Appendix 9.1 Appendix C Water Balance Calculations46_Appendix_9.1_Appendix_C_Water_Balance_Calculations.pdfNot publishedView
45 Appendix 9.1 Appendix B Topographical Survey45_Appendix_9.1_Appendix_B_Topographical_Survey.pdfNot publishedView
44 Appendix 9.1 Flood Risk Assessment44_Appendix_9.1_Flood_Risk_Assessment.pdfNot publishedView
43 Appendix 8.2 Noise Measurement Sheet (no2)43_Appendix_8.2_Noise_Measurement_Sheet_(no2).pdfNot publishedView
42 Appendix 8.1 Noise Measurement Sheet (no1)42_Appendix_8.1_Noise_Measurement_Sheet_(no1).pdfNot publishedView
41 Appendix 7.1 Extended Phase 1 Habitat Survey Figure 141_Appendix_7.1_Extended_Phase_1_Habitat_Survey_Figure_1.pdfNot publishedView
40 Appendix 7.1 Extended Phase 1 Habitat Survey Report40_Appendix_7.1_Extended_Phase_1_Habitat_Survey_Report.pdfNot publishedView
39 Appendix 6.1 Construction Dust Methodology39_Appendix_6.1_Construction_Dust_Methodology.pdfNot publishedView
38 Appendix 2.2 Scoping Opinion38_Appendix_2.2_Scoping_Opinion.pdfNot publishedView
37 Appendix 2.1 Scoping Report Site Location Plan37_Appendix_2.1_Scoping_Report_Site_Location_Plan.pdfNot publishedView
36 Appendix 2.1 Scoping Report36_Appendix_2.1_Scoping_Report.pdfNot publishedView
35 Figure 10.4.7 Viewpoint 735_Figure_10.4.7_Viewpoint_7.pdfNot publishedView
34 Figure 10.4.6 Viewpoint 634_Figure_10.4.6_Viewpoint_6.pdfNot publishedView
33 Figure 10.4.5 Viewpoint 533_Figure_10.4.5_Viewpoint_5.pdfNot publishedView
32 Figure 10.4.4 Viewpoint 432_Figure_10.4.4_Viewpoint_4.pdfNot publishedView
31 Figure 10.4.3 Viewpoint 331_Figure_10.4.3_Viewpoint_3.pdfNot publishedView
30 Figure 10.4.2.Viewpoint 230_Figure_10.4.2.Viewpoint_2.pdfNot publishedView
29 Figure 10.4.1 Viewpoint 129_Figure_10.4.1_Viewpoint_1.pdfNot publishedView
28 Figure 10.3 Viewpoint Locations28_Figure_10.3_Viewpoint_Locations.pdfNot publishedView
27 Figure 10.2 Landscape Character27_Figure_10.2_Landscape_Character.pdfNot publishedView
26 Figure 10.1 Designations26_Figure_10.1_Designations.pdfNot publishedView
25 Figure 9.4 Hydrological Model25_Figure_9.4_Hydrological_Model.pdfNot publishedView
24 Figure 9.3 Groundwater Levels24_Figure_9.3_Groundwater_Levels.pdfNot publishedView
23 Figure 9.2 Solid and Superficial Geology23_Figure_9.2_Solid_and_Superficial_Geology.pdfNot publishedView
22 Figure 9.1 Hydrological Features22_Figure_9.1_Hydrological_Features.pdfNot publishedView
21 Chapter 11 Conclusion21_Chapter_11_Conclusion.pdfNot publishedView
20 Chapter 10 Landscape and Visual Impact Assessment20_Chapter_10_Landscape_and_Visual_Impact_Assessment.pdfNot publishedView
19 Chapter 9 Hydrogeology, Hydrology and Flood Risk19_Chapter_9_Hydrogeology,_Hydrology_and_Flood_Risk.pdfNot publishedView
18 Chapter 8 Noise Assessment18_Chapter_8_Noise_Assessment.pdfNot publishedView
17 Chapter 7 Ecology and Nature Conservation17_Chapter_7_Ecology_and_Nature_Conservation.pdfNot publishedView
16 Chapter 6 Air Quality and Dust16_Chapter_6_Air_Quality_and_Dust.pdfNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Valid Date

    Published milestoneCouncil source
  3. Consultation Start Date

    Published milestoneCouncil source
  4. Site Visited / Site Notice Date

    Published milestoneCouncil source
  5. Consultation End

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Date

    Published milestoneCouncil source

Decision & conditions

Refused
REG22 - 189 EPR-XP3030VM-A001_Decision Document
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.