Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
England · Local authority
Explore collected planning applications and decisions for Worcester City Council. Search an address, application reference or proposal to find a record.
19,755 approved · 2,021 refused · 1,914 withdrawn. Received dates in our records: 23 Feb 1988 to 12 Oct 2026. Most recent record check: 14 Oct 2026. Counts reflect the last collected status; some records may be out of date.
We haven’t verified direct planning guidance links for this authority yet. Use its official website in Council sources.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.
5 Upper Park Street, WR5 1EX
Received 10 Sept 19982 Reedham Close, WR3 7BQ
Received 18 Jan 2005The Lodge Bridgewater House Blackpole Road Worcester
Received 1 Dec 20058 Bull Ring Worcester
Received 29 Jul 201442 Severn Street
Received 1 Aug 2008Land between Swanpool Walk/Malvern Road/Bromwich Road
Received 27 Jul 2001The Homestead 17 Lansdowne Crescent Worcester WR3 8JH
Received 28 Jan 2025Former Seven Trent Water Offices, Bromwich Road, Worcester
Received 31 Jan 201411 ST DUNSTANS CLOSE, WORCESTER, WR5 2AJ
Received 15 Aug 20188 Ostler Drive, WR2 6AF
Received 26 Mar 20141 Winterburn Road
Received 25 Mar 2002The Alice Ottley School, Upper Tything
Received 23 Oct 200110 Greenfield Close Worcester WR4 0HG
Received 24 Apr 2003Unit 7 Lowesmoor Trading Estate
Received 28 Aug 2013Unit A1 A2 Blackpole East Blackpole Road Worcester
Received 30 May 2019Land At Everard Close Worcester
Received 10 May 2021Apartment 5 Battenhall Lodge 60 Battenhall Road WORCESTER WR5 2BX
Received 30 Oct 2012ROYAL GRAMMAR SCHOOL WORCESTER, UPPER TYTHING, WORCESTER, WR1 1HP
Received 20 Jun 201820 Collings Avenue Worcester WR4 0DL
Received 3 Aug 20192 The Cross Worcester WR1 3PT
Received 4 Mar 1999The Glovers Needle, Windermere Drive, WR4 9JB
Received 2 Apr 2013Worcestershire County Cricket Club, County Ground,, New Road, WR2 4QQ
Received 23 May 201332 Sidbury Worcester WR1 2HZ
Received 31 May 200619 St Annes Road Worcester WR3 7PG
Received 16 Jan 2020Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Worcester City Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage