Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
England · Local authority
Explore collected planning applications and decisions for Worcester City Council. Search an address, application reference or proposal to find a record.
19,605 approved · 2,002 refused · 1,902 withdrawn. Received dates in our records: 23 Feb 1988 to 12 Oct 2026. Most recent record check: 14 Oct 2026. Counts reflect the last collected status; some records may be out of date.
We haven’t verified direct planning guidance links for this authority yet. Use its official website in Council sources.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.
JJB Sports, 49 The Shambles, Worcester
Received 2 Nov 2004'Avenbury', Park View Terrace
Received 19 May 2003King George V Playing Field, Brickfields Road
Received 19 Apr 200517 Kenwood Avenue, Worcester, WR4 9DD
Received 8 Apr 2015Worcester Cathedral, College Green, WR1 2LA
Received 18 Jul 2008Rear of The Singapore Restaurant 29 Friar Street Worcester WR1 2NA
Received 18 Jan 20223 Fountain Place, WR1 3HW
Received 9 Jul 1999GRASMERE, NORTHWICK ROAD, BEVERE, WORCESTER WR3 7RF
Received 21 Dec 201529 Friar Street Worcester
Received 27 Jul 2021PERDISWELL LEISURE CENTRE, BILFORD ROAD, WORCESTER, WR3 8DX
Received 20 Nov 2015Holy Claines Barn Hindlip Lane Worcester WR3 8SB
Received 18 Mar 2004Lidl Foodstore, Newtown Road, WR5 1HG
Received 9 Mar 2010127 Hallow Road Worcester WR2 6DF
Received 24 Jul 2025Diglis Basin, Diglis Dock Road, Worcester
Received 7 Aug 2006Bennetts Farm, Lower Wick, Worcester
Received 8 Feb 2011Teme Court Residential Care Home, Old Road, Worcester
Received 26 Nov 20141 Fir Way
Received 25 Apr 2007Pause for Thought, 159 London Road, WR5 2EE
Received 27 May 200219 Rea Way, WR2 5HA
Received 22 May 2000Hallow Ridge, Hallow Road, WR2 6DF
Received 11 Apr 2006New Bungalow Grosvenor Walk WORCESTER WR2 5BJ
Received 23 Jul 202121 Woodbridge Close WORCESTER WR5 3BJ
Received 9 Dec 202044 HIMBLETON ROAD, WORCESTER, WR2 6BQ
Received 28 Jul 201718 LOWER CHESTNUT STREET, WORCESTER WR1 1PB
Received 23 Nov 2016Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Worcester City Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage