APPLICATION FOR WORKS TO PROTECTED TREE(S) TPO-1520-2016 T1 – Cherry - Reduce secondary branches away from neighbours’ property by 1m. T2 – Lime – Pollard back to previous points. T3 – Cherry - Reduce secondary branches away from neighbours’ property by 1m. T4 – Lime – Pollard back to previous points. T5 – Lawson Cypress – reduce secondary branches away from wires by 30cm. T6 – Lime – Pollard back to previous points. T8 – Oak – reduce secondary branches away from wires and lamp post by 30cm. T9 – Lime – Pollard back to previous points. T10, Oak (Maple on TPO) – Reduce secondary branches away from lamp post by 30cm. Remove epicormic growth. Reason for Works: Very low canopy interfering with fence. Canopy is rubbing on roof, reduce branches away from wires and lamp post.
APPLICATION FOR WORKS TO PROTECTED TREE(S) TPO-1520-2016 T1 – Cherry - Reduce secondary branches away from neighbours’ property by 1m. T2 – Lime – Pollard back to previous points. T3 – Cherry - Reduce secondary branches away from neighbours’ property by 1m. T4 – Lime – Pollard back to previous points. T5 – Lawson Cypress – reduce secondary branches away from wires by 30cm. T6 – Lime – Pollard back to previous points. T8 – Oak – reduce secondary branches away from wires and lamp post by 30cm. T9 – Lime – Pollard back to previous points. T10, Oak (Maple on TPO) – Reduce secondary branches away from lamp post by 30cm. Remove epicormic growth. Reason for Works: Very low canopy interfering with fence. Canopy is rubbing on roof, reduce branches away from wires and lamp post.
Reference
252364
Agent
Mr Ollie Micallef Pigeon House Farm Sheepridge Lane London Nw2 5qs, Marlow, Buckin SL7 3SG
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.