Council planning record

2 Oak trees in 21 Tanglewood - First Oak tree in centre of garden reduce crown all over by 2m leaving 3m growth all to growth points and remove deadwood. Second Oak tree growing over both properties - completely remove two lower limbs, one at 4 metres and one at 5 metres to stop growing into gutters of houses. Reduce canopy 3m leaving 6m. Large Oak tree in 20 Tanglewood - reduce shape by 2m all round leaving 3m growth all to growth points. So that trees can grow safely and in their own shape. (Works subject to TPO 626/0072/1966). Note : permission not required for deadwood.

20 And 21 Tanglewood Close Pyrford Woking Surrey GU22 8LG

DecidedReference: TREE/2024/8266Woking Borough Council

Last published check: 3 Oct 2026, 09:46. Check the council record for more recent changes.

Application location

20 And 21 Tanglewood Close Pyrford Woking Surrey GU22 8LG

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Works to Trees Covered by a TPO
Received
Not published
Validated
24 Sept 2024
Determination deadline
19 Nov 2024
Local authority
Woking Borough Council

Application overview

2 Oak trees in 21 Tanglewood - First Oak tree in centre of garden reduce crown all over by 2m leaving 3m growth all to growth points and remove deadwood. Second Oak tree growing over both properties - completely remove two lower limbs, one at 4 metres and one at 5 metres to stop growing into gutters of houses. Reduce canopy 3m leaving 6m. Large Oak tree in 20 Tanglewood - reduce shape by 2m all round leaving 3m growth all to growth points. So that trees can grow safely and in their own shape. (Works subject to TPO 626/0072/1966). Note : permission not required for deadwood.

Proposal details

Reference
TREE/2024/8266
Ward
Pyrford
Parish
Not Available, if this is a comment please see the Documents Tab
Agent
AceTrees Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 7 of 7

DocumentPublishedAction
DELEGATED REPORTReport · PDF14 Nov 2024View
APPROVED - TPO TREES - DECISIONDecision · PDF12 Nov 2024View
ACK. - TREE - TPOCorrespondence · PDF2 Oct 2024View
WORKSHEET FOR PLANNING APPLICATIONCorrespondence · PDF2 Oct 2024View
APPLICATIONFORMREDACTEDApplication Form · PDF24 Sept 2024View
TREE LOCATION PLANPlans24 Sept 2024View
PHOTOPhoto24 Sept 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Validated Date

    Published milestoneCouncil source
  2. Decision Issued Date

    Published milestoneCouncil source
  3. Decision Made Date

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Permitted

Appeal status: Not Available, if this is a comment please see the Documents Tab · Not Available, if this is a comment please see the Documents Tab

APPROVED - TPO TREES - DECISION
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.