Awaiting decisionCouncil status: Current

Newlands Footpath 735 is to be diverted to facilitate the delivery of the Phase 4 Infrastructure Road and Southern Access Junction. From the west, the route starts at terminal point C E 467056.37, N 107934.42, continuing south to traverse the proposed Phase 4 Infrastructure Road to terminal point D E 467081.59, N 107934.07, where it will reconnect with the existing Footpath 735 to the south of Woodside Nursery School.The route will be a connection which will align with the proposed crossing point on the Phase 4 Infrastructure Road to provide a connection between Woodside Nursery School and the entrance to Rowans Hospice on Purbrook Heath Road.

Berewood Phase 1 Hambledon Road Denmead Hampshire

Winchester City CouncilReference 25/01845/PTHFootpath Application

Last published check: 24 Nov 2026, 10:33. Check the council record for more recent changes.

Status and dates

Last published check: 24 Nov 2026, 10:33 (UK)

  1. DoneReceived9 Sept 2025
  2. DoneValidated20 Oct 2025
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. Not yet publishedDecisionNo decision on council record

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (3)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
Application type
Footpath Application
Ward
DENMEAD WARD
Parish
Newlands
Documents
6 published

Proposal

Newlands Footpath 735 is to be diverted to facilitate the delivery of the Phase 4 Infrastructure Road and Southern Access Junction. From the west, the route starts at terminal point C E 467056.37, N 107934.42, continuing south to traverse the proposed Phase 4 Infrastructure Road to terminal point D E 467081.59, N 107934.07, where it will reconnect with the existing Footpath 735 to the south of Woodside Nursery School.The route will be a connection which will align with the proposed crossing point on the Phase 4 Infrastructure Road to provide a connection between Woodside Nursery School and the entrance to Rowans Hospice on Purbrook Heath Road.

Reference
25/01845/PTH
Ward
DENMEAD WARD
Parish
Newlands
Agent
Savills

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • HCC HIGHWAYS COMMENTConsultee Comment18 Dec 2025View
  • SITE MAPDrawing9 Sept 2025View
  • ROUTE OF EXISTING RIGHT OF WAY FP735Drawing9 Sept 2025View
  • PROPOSED RIGHT OF WAY DIVERSION FP735Drawing9 Sept 2025View
  • FP735 SCHEDULE REV ABackground Papers9 Sept 2025View
  • FP735 STATEMENTBackground Papers9 Sept 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.