Original application: 24/02780/FUL Conditions: 10, 13, 14, 17, 18 and 21Design Stage SAP calculation demonstrating that the development will achieve a Dwelling Emission Rate (DER) at least 19% lower than the 2013 Part L Target Emission Rate (TER).Water efficiency calculator confirming predicted internal water use of no more than 105 litres per person per day.Confirmation that protective measures (fencing) have been installed in accordance with the Arboricultural Method Statement (Ref: 1396.bjh.Jan25) and Tree Protection Plan (Ref: BJH03/04).Notification to the Local Planning Authority that protective measures have been installed and a request for site inspection by the Arboricultural Officer to confirm compliance with the approved Arboricultural Method Statement and Tree Protection Plan.Confirmation of appointment of Bernie Harverson (author of the approved Arboricultural Method Statement) as the supervising arboricultural consultant.Utility Services Layout Plan showing the location of all existing and proposed utility services (gas, electricity, water, drainage, and communications) in relation to the approved development.Detailed surface water drainage strategy, drawings, and specifications prepared by the drainage consultant.
Original application: 24/02780/FUL Conditions: 10, 13, 14, 17, 18 and 21Design Stage SAP calculation demonstrating that the development will achieve a Dwelling Emission Rate (DER) at least 19% lower than the 2013 Part L Target Emission Rate (TER).Water efficiency calculator confirming predicted internal water use of no more than 105 litres per person per day.Confirmation that protective measures (fencing) have been installed in accordance with the Arboricultural Method Statement (Ref: 1396.bjh.Jan25) and Tree Protection Plan (Ref: BJH03/04).Notification to the Local Planning Authority that protective measures have been installed and a request for site inspection by the Arboricultural Officer to confirm compliance with the approved Arboricultural Method Statement and Tree Protection Plan.Confirmation of appointment of Bernie Harverson (author of the approved Arboricultural Method Statement) as the supervising arboricultural consultant.Utility Services Layout Plan showing the location of all existing and proposed utility services (gas, electricity, water, drainage, and communications) in relation to the approved development.Detailed surface water drainage strategy, drawings, and specifications prepared by the drainage consultant.
Reference
25/01730/DIC
Alternative references
PP-14262480
Ward
ALRESFORD AND ITCHEN VALLEY WARD
Parish
Old Alresford Parish Council
Agent
Mr Nick Pratt
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.