Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Land Adjacent Titchfield Lane Wickham Hampshire
Last published check: 9 Oct 2026, 20:31. Check the council record for more recent changes.
Land Adjacent Titchfield Lane Wickham Hampshire
This record has no verified map location.
View council mapErection of Battery Energy Storage Facility including creation of new vehicular access along with landscaping and all associated engineering works (AMENDED PLANS AND ADDITIONAL INFORMATION)
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| COMMITTEE UPDATE SHEETReport · PDF | 27 Mar 2026 | View |
| Decision NoticeDecision Notice · PDF | 27 Mar 2026 | View |
| EMMA ROSLING (OBJECT)Public Comment · PDF | 10 Mar 2026 | View |
| SUBSTATION SITE VIEWDrawing Revised · PDF | 3 Mar 2026 | View |
| FIRE STRATEGY PLANRevised Drawing · PDF | 2 Mar 2026 | View |
| INFO RE BATTERY RECYCLINGCorrespondence · PDF | 2 Mar 2026 | View |
| DNV COMPETENT PERSON MEMOBackground Papers · PDF | 2 Mar 2026 | View |
| OBJECTION LETTER FEB 2026 EMMA ROSLIN PART 1Public Comment | 25 Feb 2026 | View |
| OBJECTION LETTER FEB 2026 EMMA ROSLIN PART 2Public Comment | 25 Feb 2026 | View |
| LLFA FLOODConsultee Comment · PDF | 24 Feb 2026 | View |
| FURTHER DRAINAGE INFO -CULVERT CAPACITYBackground Papers · PDF | 18 Jan 2026 | View |
| DRAINAGE STRATEGYSuperseded Drawing · PDF | 13 Jan 2026 | View |
| CLARIFICATION OF STORAGE FOR FIRE WATERBackground Papers · PDF | 13 Jan 2026 | View |
| DRAINAGE STRATEGYDrawing · PDF | 13 Jan 2026 | View |
| FIRE FIGHTING WATER CALCULATIONSBackground Papers · PDF | 13 Jan 2026 | View |
| RAINFALL MODEL CALCULATIONS WATER CALCULATIONSBackground Papers · PDF | 13 Jan 2026 | View |
| EMAIL - FURTHER EXPLANATION OF RAINWATER STORAGE CALCULATIONSBackground Papers · PDF | 13 Jan 2026 | View |
| LLFA RESPONSEConsultee Comment · PDF | 13 Jan 2026 | View |
| LLFA FIRE WATERConsultee Comment · PDF | 13 Jan 2026 | View |
| LLFA RESPONSEConsultee Comment · PDF | 13 Jan 2026 | View |
| NATIONAL FIRE PREVENTION ASSOCATION 2023 (USA)Report · PDF | 11 Jan 2026 | View |
| FM GLOBAL 2024 PROPERTY LOSS SHEETReport · PDF | 11 Jan 2026 | View |
| REVISED REPTILE MITIGATION STRATEGYBackground Papers · PDF | 8 Jan 2026 | View |
| EMAIL FROM AGENT RE DRAINAGECorrespondence · PDF | 16 Dec 2025 | View |
| SURFACE WATER DRAINAGE STRATEGYSuperseded Drawing · PDF | 16 Dec 2025 | View |
| CROSS SECTION THROUGH PROPOSED SWALEDrawing · PDF | 16 Dec 2025 | View |
| CULVERT CAPACITY CHECK CALCULATIONSBackground Papers · PDF | 6 Dec 2025 | View |
| EMMA ROSLING - OBJECTIONPublic Comment | 27 Nov 2025 | View |
| EMAIL FROM AGENT RESPONDING TO LLFA CONCERNSBackground Papers · PDF | 25 Nov 2025 | View |
| EMAIL FROM AGENT RE REPTILESCorrespondence · PDF | 13 Nov 2025 | View |
| REPTILE MITIGATION STRATEGYSuperseded Drawing · PDF | 13 Nov 2025 | View |
| RETILE MITIGATION STRATEGYBackground Papers · PDF | 7 Nov 2025 | View |
| BNG METRIC UPDATED 07-11-25Background Papers | 7 Nov 2025 | View |
| BNG ASSESSMENT AND BIODIVERSITY ENHANCEMENT SCHEMEBackground Papers · PDF | 7 Nov 2025 | View |
| EMAIL FROM AGENT RESPOND TO ECOLOGY QUERIESCorrespondence · PDF | 7 Nov 2025 | View |
| FLOOD AND WATER MANAGEMENTConsultee Comment · PDF | 6 Nov 2025 | View |
| DORMOUSE SURVEY REPORTBackground Papers · PDF | 22 Oct 2025 | View |
| BAT SURVEY REPORTBackground Papers · PDF | 22 Oct 2025 | View |
| APPLICANT RESPONSE TO LEAD LOCAL FLOOD AUTHORITY COMMENTSBackground Papers · PDF | 30 Sept 2025 | View |
| Correspondence EOTCorrespondence EOT · PDF | 25 Sept 2025 | View |
| HCC FLOOD MANAGEMENTConsultee Comment · PDF | 13 Sept 2025 | View |
| Correspondence EOTCorrespondence EOT · PDF | 10 Sept 2025 | View |
| WCC ECOLOGYConsultee Comment · PDF | 10 Sept 2025 | View |
| UK HABITAT ASSESSMENT (UKHABS)Revised Background Papers · PDF | 2 Sept 2025 | View |
| BAT ACTIVITY SURVEYS & ASSESSMENTSuperseded Drawing · PDF | 2 Sept 2025 | View |
| DORMOUSE SURVEY AND ASSESSMENTRevised Background Papers · PDF | 30 Aug 2025 | View |
| PRELIMINARY ECOLOGICAL ASSESSMENTRevised Background Papers · PDF | 30 Aug 2025 | View |
| REPTILE MITIGATION STRATEGYSuperseded Drawing · PDF | 30 Aug 2025 | View |
| HCC HIGHWAYSConsultee Comment · PDF | 28 Aug 2025 | View |
| WCC ECOLOGYConsultee Comment · PDF | 27 Aug 2025 | View |
| HCC HIGHWAYSConsultee Comment · PDF | 18 Aug 2025 | View |
| Correspondence EOTCorrespondence EOT · PDF | 14 Aug 2025 | View |
| DORMOUSE SURVEY AND ASSESSMENTSuperseded Drawing · PDF | 3 Aug 2025 | View |
| BREEDING BIRD SURVEYS TECHNICAL NOTEBackground Papers · PDF | 3 Aug 2025 | View |
| PRELIMINARY ECOLOGICAL ASSESSMENT (PEA)Superseded Drawing · PDF | 3 Aug 2025 | View |
| UK HABITAT ASSESSMENT (UKHABS)Superseded Drawing · PDF | 3 Aug 2025 | View |
| STATUTORY BIODIVERSITY NET GAIN METRICRevised Background Papers | 3 Aug 2025 | View |
| INVERTEBRATE SURVEY TECHNICAL NOTERevised Background Papers · PDF | 3 Aug 2025 | View |
| ECOLOGICAL SURVEYS TECHNICAL NOTEBackground Papers · PDF | 3 Aug 2025 | View |
| WCC ECOLOGYConsultee Comment · PDF | 4 Jul 2025 | View |
| FIRE STRATEGY PLANSuperseded Drawing · PDF | 2 Jul 2025 | View |
| LANDSCAPE STRATEGY PLANRevised Drawing · PDF | 2 Jul 2025 | View |
| HCC-FLOOD AND WATER MANAGEMENT TEAMConsultee Comment · PDF | 1 Jul 2025 | View |
| PROPOSED SITE LAYOUT PLANRevised Drawing · PDF | 27 Jun 2025 | View |
| PROPOSED SITE LAYOUT PLAN WITH ANNOTATIONSRevised Drawing · PDF | 27 Jun 2025 | View |
| CLARIFICATION ON DRAINAGE TO HIGHWAYS CULVERTCorrespondence · PDF | 24 Jun 2025 | View |
| APPLICANT RESPONSE TO HAMPSHIRE FIRE AND RESCUE SERVICECorrespondence · PDF | 24 Jun 2025 | View |
| DORMOUSE SURVEY AND ASSESSMENTSuperseded Drawing · PDF | 24 Jun 2025 | View |
| BAT ACTIVITY SURVEYS & ASSESSMENTSuperseded Drawing · PDF | 24 Jun 2025 | View |
| AGENT RESPONSE TO ECOLOGY CONCERNSCorrespondence · PDF | 24 Jun 2025 | View |
| HAMPSHIRE FIRE AND RESCUE SERVICEConsultee Comment · PDF | 24 Jun 2025 | View |
| HAMPSHIRE FIRE AND RESCUE SERVICEConsultee Comment · PDF | 20 Jun 2025 | View |
| Correspondence EOTCorrespondence EOT · PDF | 13 Jun 2025 | View |
| FLOOD RISK ASSESSMENT AND SURFACE WATER DRAINAGE STRATEGYRevised Background Papers · PDF | 9 Jun 2025 | View |
| ECOLOGY FURTHER COMMENTConsultee Comment · PDF | 23 Apr 2025 | View |
| WCC _ ENV HEALTHConsultee Comment · PDF | 17 Apr 2025 | View |
| FLOOD AND WATER MANAGEMENT COMMENTConsultee Comment · PDF | 14 Apr 2025 | View |
| WCC DRAINAGE ENGINEERConsultee Comment · PDF | 8 Apr 2025 | View |
| HAMPSHIRE HIGHWAYS FURTHER COMMENTConsultee Comment · PDF | 3 Apr 2025 | View |
| NATURAL ENGLAND COMMENTSConsultee Comment · PDF | 3 Apr 2025 | View |
| WCC TREE OFFICER FURTHER COMMENTConsultee Comment · PDF | 31 Mar 2025 | View |
| ENVIRONMENTAL AGENCY COMMENTConsultee Comment · PDF | 28 Mar 2025 | View |
| NATURE SPACE FURTHER COMMENTConsultee Comment · PDF | 27 Mar 2025 | View |
| EMMA ROSLING OBJECTIONPublic Comment | 26 Mar 2025 | View |
| WCC LANDSCAPE TEAMConsultee Comment · PDF | 25 Mar 2025 | View |
| NETWORK RAIL COMMENTSConsultee Comment · PDF | 20 Mar 2025 | View |
| WCC _ ENV HEALTHConsultee Comment · PDF | 17 Mar 2025 | View |
| LIGHTING IMPACT ASSESSMENT AND EXTERNAL LIGHTING DESIGNRevised Background Papers · PDF | 11 Mar 2025 | View |
| FLOOD RISK ASSESSMENT AND SURFACE WATER DRAINAGE STRATEGYSuperseded Drawing · PDF | 11 Mar 2025 | View |
| CONSTRUCTION TRAFFIC MANAGEMENT PLANRevised Background Papers · PDF | 11 Mar 2025 | View |
| ACOUSTIC MITIGATION FENCERevised Drawing · PDF | 11 Mar 2025 | View |
| EMERGENCY RESPONSE PLANRevised Background Papers · PDF | 11 Mar 2025 | View |
| ACOUSTIC 24 RESPONSE TO ENVIRONMENTAL PROTECTION COMMENTRevised Background Papers · PDF | 11 Mar 2025 | View |
| RISK MANAGEMENT PLANRevised Background Papers · PDF | 11 Mar 2025 | View |
| LUX PLANDrawing · PDF | 11 Mar 2025 | View |
| FIRE STRATEGY PLANSuperseded Drawing · PDF | 11 Mar 2025 | View |
| PROPOSED SITE LAYOUT PLANSuperseded Drawing · PDF | 11 Mar 2025 | View |
| EMMA ROSLING OBJECTIONPublic Comment | 21 Feb 2025 | View |
| EMMA ROSLING CORRESPONDENCEPublic Comment · PDF | 21 Feb 2025 | View |
| APPLICANT RESPONSE TO EHO COMMENTBackground Papers · PDF | 20 Feb 2025 | View |
| HCC HIGHWAYSConsultee Comment · PDF | 18 Feb 2025 | View |
| PARISH COUNCIL CALL IN REQUESTPublic Comment · PDF | 17 Feb 2025 | View |
| WCC ECOLOGYConsultee Comment · PDF | 10 Feb 2025 | View |
| ENVIRONMENTAL PROTECTIONCorrespondence · PDF | 7 Feb 2025 | View |
| FURTHER INFO FROM AGENTBackground Papers · PDF | 5 Feb 2025 | View |
| FLOOD AND WATER MANAGEMENT COMMENTConsultee Comment · PDF | 4 Feb 2025 | View |
| SOUTHERN WATERConsultee Comment · PDF | 31 Jan 2025 | View |
| FURTHER INFO FROM AGENTCorrespondence · PDF | 30 Jan 2025 | View |
| MR PETER MOODY-SUPPORTS(FULL)Public Comment · PDF | 30 Jan 2025 | View |
| WICKHAM PARISH COUNCILPublic Comment · PDF | 29 Jan 2025 | View |
| APPLICANT RESPONSE TO EHO COMMENTBackground Papers · PDF | 28 Jan 2025 | View |
| NATIONAL GRID COMMENTSConsultee Comment · PDF | 24 Jan 2025 | View |
| NATIONAL GRID COMMENTSConsultee Comment · PDF | 24 Jan 2025 | View |
| NATIONAL GRID COMMENTSConsultee Comment · PDF | 24 Jan 2025 | View |
| NATIONAL GRID COMMENTSConsultee Comment · PDF | 24 Jan 2025 | View |
| NATIONAL GRID COMMENTSConsultee Comment · PDF | 24 Jan 2025 | View |
| WCC TREE OFFICERConsultee Comment · PDF | 24 Jan 2025 | View |
| NATURAL ENGLAND COMMENTSConsultee Comment · PDF | 23 Jan 2025 | View |
| NATURESPACE COMMENTSConsultee Comment · PDF | 23 Jan 2025 | View |
| FIRE AND RESCUE SERVICE COMMENTSConsultee Comment · PDF | 23 Jan 2025 | View |
| WCC _ ENV HEALTHConsultee Comment · PDF | 21 Jan 2025 | View |
| WCC _ ENV HEALTHConsultee Comment · PDF | 21 Jan 2025 | View |
| SOUTHERN WATERConsultee Comment · PDF | 14 Jan 2025 | View |
| CUT AND FILL ANALYSIS SHEET 1 OF 2Drawing · PDF | 13 Jan 2025 | View |
| CUT AND FILL ANALYSIS SHEET 2 OF 2Drawing · PDF | 13 Jan 2025 | View |
| AGENT EMAIL WITH FURTHER INFORMATIONCorrespondence · PDF | 13 Jan 2025 | View |
| WCC LANDSCAPE TEAMConsultee Comment · PDF | 8 Jan 2025 | View |
| 132KV SUBSTATION - SIDE VIEWDrawing · PDF | 3 Jan 2025 | View |
| CCTV AND LIGHTING POLEDrawing · PDF | 3 Jan 2025 | View |
| LOCATION PLANDrawing · PDF | 3 Jan 2025 | View |
| CONTEXTUAL ELEVATIONS (SHEET 2 OF 3)Drawing · PDF | 3 Jan 2025 | View |
| ACOUSTIC MITIGATION FENCESuperseded Drawing · PDF | 3 Jan 2025 | View |
| AUXILIARY TRANSFORMERDrawing · PDF | 3 Jan 2025 | View |
| DNO BUILDING (132KV)Drawing · PDF | 3 Jan 2025 | View |
| PROPOSED SITE LAYOUT PLANSuperseded Drawing · PDF | 3 Jan 2025 | View |
| BATTERY UNITDrawing · PDF | 3 Jan 2025 | View |
| ACCESS TRACKDrawing · PDF | 3 Jan 2025 | View |
| MONITORING ROOM, OFFICE AND WAREHOUSEDrawing · PDF | 3 Jan 2025 | View |
| CONTEXTUAL ELEVATIONS (SHEET 3 OF 3)Drawing · PDF | 3 Jan 2025 | View |
| CONTEXTUAL ELEVATIONS (SHEET 1 OF 1)Drawing · PDF | 3 Jan 2025 | View |
| PALISADE FENCEDrawing · PDF | 3 Jan 2025 | View |
| POWER STATION (SKID) BESSDrawing · PDF | 3 Jan 2025 | View |
| SWITCHGEAR BUILDINGDrawing · PDF | 3 Jan 2025 | View |
| EXISTING SITE PLANDrawing · PDF | 3 Jan 2025 | View |
| FIRE STRATEGY PLANSuperseded Drawing · PDF | 3 Jan 2025 | View |
| APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form · PDF | 23 Dec 2024 | View |
| TRANSPORT ASSESSMENTBackground Papers · PDF | 23 Dec 2024 | View |
| LVIA VIEWPOINTS 1,2,3Background Papers · PDF | 23 Dec 2024 | View |
| STORAGE CONTAINERSuperseded Drawing · PDF | 23 Dec 2024 | View |
| CCTV POLEDrawing · PDF | 23 Dec 2024 | View |
| ALTERNATIVE SITE ASSESSMENTBackground Papers · PDF | 23 Dec 2024 | View |
| LVIA FIGURESBackground Papers · PDF | 23 Dec 2024 | View |
| LVABackground Papers · PDF | 23 Dec 2024 | View |
| LANDSCAPE MITIGATION PLANSuperseded Drawing · PDF | 23 Dec 2024 | View |
| LVIA APPENDIX 1Background Papers · PDF | 23 Dec 2024 | View |
| LVIA APPENDIX 2: VISUAL AIDSBackground Papers · PDF | 23 Dec 2024 | View |
| LVIA APPENDIX 3Background Papers · PDF | 23 Dec 2024 | View |
| LVIA APPENDIX 4Background Papers · PDF | 23 Dec 2024 | View |
| EMPLOYMENT AND SKILLS PLANBackground Papers · PDF | 23 Dec 2024 | View |
| ARBORICULTURAL IMPACT ASSESSMENT (AIA)Background Papers · PDF | 23 Dec 2024 | View |
| NOISE IMPACT ASSESSMENTBackground Papers · PDF | 23 Dec 2024 | View |
| STATEMENT OF COMMUNITY INVOLVEMENTBackground Papers · PDF | 23 Dec 2024 | View |
| FLOOD RISK ASSESSMENT AND SURFACE WATER DRAINAGE STRATEGYSuperseded Drawing · PDF | 23 Dec 2024 | View |
| CONSTRUCTION TRAFFIC MANAGEMENT PLANSuperseded Drawing · PDF | 23 Dec 2024 | View |
| GEO ENVIRONMENTAL MAPPINGBackground Papers · PDF | 23 Dec 2024 | View |
| APPENDIX E HISTORICAL MAPSBackground Papers · PDF | 23 Dec 2024 | View |
| PHASE I GEO-ENVIRONMENTAL ASSESSMENTBackground Papers · PDF | 23 Dec 2024 | View |
| LIGHTING ASSESSMENTSuperseded Drawing · PDF | 23 Dec 2024 | View |
| BAT ACTIVITY SURVEY & ASSESSMENTSuperseded Drawing · PDF | 23 Dec 2024 | View |
| BOTANY SURVEY & ASSESSMENTBackground Papers · PDF | 23 Dec 2024 | View |
| PRELIMINARY ECOLOGICAL ASSESSMENT (PEA)Superseded Drawing · PDF | 23 Dec 2024 | View |
| GREAT CRESTED NEWT HABITAT SUITABILITY INDEX (HSI)Background Papers · PDF | 23 Dec 2024 | View |
| REPTILE SURVEY & ASSESSMENTSuperseded Drawing · PDF | 23 Dec 2024 | View |
| BIODIVERSITY GAIN PLANBiodiversity · PDF | 23 Dec 2024 | View |
| BIODIVERSITY METRIC CALCULATION TOOLSuperseded Drawing | 23 Dec 2024 | View |
| PLANNING DESIGN AND ACCESS STATEMENTBackground Papers · PDF | 23 Dec 2024 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.