Council planning record

Change of use of the former Baptist chapel from Use Class F1 (non-residential institution) to a single residential dwelling (Use Class C3).

Porton Baptist Chapel, High Street, Porton, Salisbury, SP4 0LH

ClosedReference: PL/2026/02713Wiltshire Council

We couldn’t update every section. Some information is from an earlier collection.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Valid Date

    Published milestoneCouncil source
  2. Consultation Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Closed
Application type
Full planning permission
Received
Not published
Validated
7 May 2026
Determination deadline
Not published
Local authority
Wiltshire Council

Application overview

Change of use of the former Baptist chapel from Use Class F1 (non-residential institution) to a single residential dwelling (Use Class C3).

Proposal details

Reference
PL/2026/02713
Ward
Winterslow & Upper Bourne Valley ED
Parish
Idmiston CP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Porton Baptist Chapel, High Street, Porton, Salisbury, SP4 0LH

This record has no verified map location.

Documents 30 of 30

DocumentPublishedAction
Existing West ElevationPlan · PDF27 Apr 2026View
Existing East ElevationPlan · PDF27 Apr 2026View
List of Consultees & Neighbours · PDF8 May 2026View
Existing South ElevationPlan · PDF27 Apr 2026View
Site Location PlanPlan · PDF27 Apr 2026View
LG-New-Facelift-R32-ASHP-HP-stripped - heat pump detailsCorrespondence · PDF7 May 2026View
Proposed Lower Ground Floor PlanPlan · PDF27 Apr 2026View
bat surveyAdditional28 Aug 2026View
Proposed North ElevationPlan · PDF27 Apr 2026View
THERMA-V-MONOBLOC-S-II-NPI-1-1 - heat pump specificationsCorrespondence · PDF7 May 2026View
Application Form RedactedApplication Form · PDF27 Apr 2026View
Applicants response to comments receivedCorrespondence · PDF3 Jun 2026View
ReportReport · PDF2 Oct 2026View
Proposed Section 1Plan · PDF27 Apr 2026View
neighbour mapConsultation List7 May 2026View
Proposed South ElevationPlan · PDF27 Apr 2026View
Decision Notice · PDF2 Oct 2026View
ECO_Full_Response_PL202602713Consultee Response17 Jul 2026View
Existing Upper Ground Floor PlanPlan · PDF27 Apr 2026View
Proposed West ElevationPlan · PDF27 Apr 2026View
Proposed Section 2Plan · PDF27 Apr 2026View
Design Access and Heritage statementStatements27 Apr 2026View
Existing Lower Ground Floor PlanPlan · PDF27 Apr 2026View
Section 111Legal Agreement · PDF28 Sept 2026View
Block PlanPlan · PDF27 Apr 2026View
Proposed East ElevationPlan · PDF27 Apr 2026View
Existing North ElevationPlan · PDF27 Apr 2026View
Proposed Mezzanine Floor PlanPlan · PDF27 Apr 2026View
Planning statementStatements27 Apr 2026View
20260521 PL_2026_02713 HDM Consultation response Porton Baptist Chapel High Street PortonConsultee Response · PDF21 May 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve with Conditions
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.