Awaiting decisionCouncil status: Registered

Condition Discharge application to discharge Condition No.3 (Road Structure), Condition No.4 (Highway and Infrastructure Works), Condition No.28 (Floor Levels), Condition No.29 (Drainage Strategy), Condition No.30 (Protection of Carr Brook and other Watercourses), Condition No.32 (Flood Plain Compensation), Condition No.33 (Sewage Pipe Work - Zone 1) and Condition No.34 (Pollution Prevention) in respsect of approved application A/23/95513/MAJOR

Land Adjacent Lower Pocket Nook Farm Pocket Nook Lane Lowton Warrington WA3 1AX

Wigan Metropolitan Borough CouncilReference A/26/101770/CONCondition discharge

Last published check: 21 Nov 2026, 07:48. Check the council record for more recent changes.

Status and dates

Last published check: 21 Nov 2026, 07:48 (UK)

37days until target decision date1 Jan 2027

  1. DoneReceived6 Nov 2026
  2. DoneValidated6 Nov 2026
  3. OpenConsultationEnds 1 Dec 2026
  4. Next date · in 37 daysTarget decision date1 Jan 2027
  5. Not yet publishedDecisionNo decision on council record

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (7)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Consultation Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Condition discharge
Ward
Lowton East
Parish
Golborne And Lowton Township
Documents
47 published

Proposal

Condition Discharge application to discharge Condition No.3 (Road Structure), Condition No.4 (Highway and Infrastructure Works), Condition No.28 (Floor Levels), Condition No.29 (Drainage Strategy), Condition No.30 (Protection of Carr Brook and other Watercourses), Condition No.32 (Flood Plain Compensation), Condition No.33 (Sewage Pipe Work - Zone 1) and Condition No.34 (Pollution Prevention) in respsect of approved application A/23/95513/MAJOR

Reference
A/26/101770/CON
Alternative references
PP-15337500
Ward
Lowton East
Parish
Golborne And Lowton Township

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • UU RESPONSEConsultee Reply17 Nov 2026View
  • APPLICATIONFORMREDACTEDApplication Form6 Nov 2026View
  • 110052-PEF-S278-LB-AIP-CB-0003 AIP (P01) RC RETAINING WALL D2Supporting Report6 Nov 2026View
  • 110052-PEF-S278-LB-AIP-CB-0002 AIP (P01) RC T-RETAINING WALLSupporting Report6 Nov 2026View
  • 110052-PEF-S278-01-TN-D-0002_PCC RETAINING WALL - DESIGN SPECIFICATION - TECHNICSupporting Report6 Nov 2026View
  • 110052-PEF-S278-HCS-DR-D-00002 - S278 - CROSS SECTIONS P03Plans and Drawings6 Nov 2026View
  • 110052-PEF-S278-HCS-DR-D-00001 - S278 - CROSS SECTIONS P03Plans and Drawings6 Nov 2026View
  • 110052-PEF-S278-HCS-DR-D-00003 - S278 - CROSS SECTIONS P02Plans and Drawings6 Nov 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.