Council planning record

Request for a scoping opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for replacing the existing operational wind farm, comprising five turbines with a tip height of 72 metres (m), with a new wind farm of up to seven wind turbines with a maximum tip height of up to 200 m, together with associated infrastructure

Lambrigg Wind Farm New Hutton KENDAL LA8 0AP

Consultation StartedReference: 2026/1825/SCOPEWestmorland and Furness Council

Last published check: 4 Oct 2026, 03:53. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Valid Date

    Published milestoneCouncil source
  3. Consultation Start Date

    Published milestoneCouncil source
  4. Consultation End

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Consultation Started
Application type
Scoping Opinion
Received
17 Sept 2026
Validated
17 Sept 2026
Determination deadline
Not published
Local authority
Westmorland and Furness Council

Application overview

Request for a scoping opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for replacing the existing operational wind farm, comprising five turbines with a tip height of 72 metres (m), with a new wind farm of up to seven wind turbines with a maximum tip height of up to 200 m, together with associated infrastructure

Proposal details

Reference
2026/1825/SCOPE
Ward
Sedbergh and Kirkby Lonsdale
Parish
New Hutton, Docker, Lambrigg
Agent
Magnus Woods, ERM

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Lambrigg Wind Farm New Hutton KENDAL LA8 0AP

This record has no verified map location.

Documents 39 of 39

DocumentPublishedAction
Figure 5.7 Comparative Blade Tip ZTV - Existing & propsoed TurbinesExisting and Proposed Plan17 Sept 2026View
Figure 11.1 Site Layout and Culture Heritage Study AreasProposed Layout Plan17 Sept 2026View
Figure 1.2 Site Layout PlanProposed Layout Plan17 Sept 2026View
Figure 5.1 Landscape & Visual Assessment Study AreaProposed Plan17 Sept 2026View
Figure 5.2 Landscape Character Areas & TypesProposed Plan17 Sept 2026View
Figure 5.3 Landscape DesignationsProposed Plan17 Sept 2026View
Figure 5.4 Viewpoint Landscape PlanProposed Plan17 Sept 2026View
Figure 5.5 Turbine Blade Tip Height Zone of Theoretical Visibility to 45kmProposed Plan17 Sept 2026View
Figure 5.6 Turbine Blade Tip Height Zone of Theoretical Visibility to 20kmProposed Plan17 Sept 2026View
Figure 6.1 Statutory Designated Sites within a 5km buffer of siteProposed Plan17 Sept 2026View
Figure 6.2 ERM protected species survey results and previous survey boundaryProposed Plan17 Sept 2026View
Figure 6.3a Local Record Center protected species data within 2km of siteProposed Plan17 Sept 2026View
Figure 6.3b Local Record Center Flora and Invertebrates data within 2km of siteProposed Plan17 Sept 2026View
Figure 7.1 Ornithological of Designated SitesProposed Plan17 Sept 2026View
Figure 7.2 The FAS VP Locations & ViewshedsProposed Plan17 Sept 2026View
Figure 7.3 The Ornithology Survey AreasProposed Plan17 Sept 2026View
Figure 8.2 Surface Water HydrologyProposed Plan17 Sept 2026View
Figure 8.3 EA Flood Map Rivers & SeaProposed Plan17 Sept 2026View
Figure 8.4 EA Surface Water Flood MapProposed Plan17 Sept 2026View
Figure 9.1 Interpolated Peat DepthsProposed Plan17 Sept 2026View
Figure 9.2 Groundwater BodiesProposed Plan17 Sept 2026View
Figure 9.3 HydrogeologyProposed Plan17 Sept 2026View
Figure 10.1 Transport PlanProposed Plan17 Sept 2026View
Figure 11.2 Non-Designated Assets within 1km and designated assets within 5kmProposed Plan17 Sept 2026View
Figure 11.3 Designated Assets within 15kmProposed Plan17 Sept 2026View
Figure 12.1 Noise Sensitive ReceptorsProposed Plan17 Sept 2026View
Figure 12.2 Cumulative DevelopmentsProposed Plan17 Sept 2026View
Figure 13.1 Socio-economics, tourism and recreation study areaProposed Plan17 Sept 2026View
Figure 13.2 Index of Multiple DeprivationProposed Plan17 Sept 2026View
Figure 13.3 Public Right of Way and National ParksProposed Plan17 Sept 2026View
Figure 8.1 Hydrology Study AreaProposed Plan17 Sept 2026View
Figure 15.1 Shadow Flicker Study AreaProposed Plan17 Sept 2026View
Figure 1.1 Site Location PlanSite Location Plan17 Sept 2026View
Lambrigg Repowering And Extension - Scoping ReportReport/Statement16 Sept 2026View
Docker Parish Meeting - Docker Parish MeetingConsultation Response22 Sept 2026View
Docker Parish Meeting - Docker Parish MeetingConsultation Response22 Sept 2026View
National HighwaysConsultation Response24 Sept 2026View
Countryside Access Officer (Eden/SL) - W&F CouncilConsultation Response28 Sept 2026View
Countryside Access Officer (Eden/SL)Planning Response 2026-1825-SCOPE.pdf28 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.