Council planning record

The construction of a new four-arm roundabout at the Oystercatcher Junction of the A259 to connect the A259 with the B2233 (Yapton Road) and Climping Street. Construction of bus stops, bus lane, crossings, foot and cycleways, improvements to the existing National Cycle Network Route 2; alteration of the existing accesses to local facilities; and associated development including landscaping, drainage and ecological mitigation.

Junction of A259, B2233 (Yapton Road) and Climping Street (X)499779 (Y)101705

Application Pending a DecisionReference: WSCC/038/26West Sussex County Council

Application location

Junction of A259, B2233 (Yapton Road) and Climping Street (X)499779 (Y)101705

This record has no verified map location.

Application summary

Status
Application Pending a Decision
Application type
Not published
Received
Not published
Validated
6 Aug 2026
Determination deadline
Not published
Local authority
West Sussex County Council

Application overview

The construction of a new four-arm roundabout at the Oystercatcher Junction of the A259 to connect the A259 with the B2233 (Yapton Road) and Climping Street. Construction of bus stops, bus lane, crossings, foot and cycleways, improvements to the existing National Cycle Network Route 2; alteration of the existing accesses to local facilities; and associated development including landscaping, drainage and ecological mitigation.

Proposal details

Reference
WSCC/038/26
Parish
Climping

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 219 of 219

DocumentPublishedAction
Application FormApplicationFormRedacted.pdf (0 kb)7 Aug 2026View
Planning StatementPlanning Statement_A259 Oystercatcher_Final_REDACTED.pdf (0 kb)7 Aug 2026View
Location Plan70107157-WSP-XX-XX-DR-LP-0100-290-P06 location plan.pdf (0 kb)7 Aug 2026View
Environmental Masterplan70107157-WAP-XX-OS-RP-ES-V2-11-0006_Oystercatcher Environmental Masterplan_P10.pdf (0 kb)7 Aug 2026View
Enviornmental Illustrative Sections70107157-WSP-XX-OS-RP-ES-V2-11-0007_Enviornmental Illustrative Sections.pdf (0 kb)7 Aug 2026View
Landscape General Arrangement70094995-WSP-XX-XX-OS-RP-ES-V2-11-0001_Landscape General Arrangement.pdf (0 kb)7 Aug 2026View
General Arrangement70107157-WSP-XX-XX-DR-ZZ-0100-201_General Arrangement.pdf (0 kb)7 Aug 2026View
General Arrangement NCN Connection70107157-WSP-XX-XX-DR-ZZ-0100-301_General Arrangement NCN connection.pdf (0 kb)7 Aug 2026View
General Arrangement Aerial Version70107157-WSP-XX-XX-DR-ZZ-0100-201-202_General Arrangement Aerial Version.pdf (0 kb)7 Aug 2026View
General Arrangement Aerial Version NCN Connection70107157-WSP-XX-XX-DR-ZZ-0100-201-203_General Arrangement Aerial Version NCN connection.pdf (0 kb)7 Aug 2026View
General Surfacing Arrangement70107157-WSP-XX-XX-DR-ZZ-0101-211-General Surfacing Arrangement.pdf (0 kb)7 Aug 2026View
General Surfacing Arrangement70107157-WSP-XX-XX-DR-ZZ-0101-311-General Surfacing Arrangement.pdf (0 kb)7 Aug 2026View
Street Lighting Layout Design Sheet 1 Of 3EVO20019731-LD-001-H_Street Lighting Layout Design Sheet 1 of 3.pdf (0 kb)7 Aug 2026View
Street Lighting Layout Design Sheet 2 Of 3EVO20019731-LD-002-H_Street Lighting Layout Design Sheet 2 of 3.pdf (0 kb)7 Aug 2026View
Street Lighting Layout Design Sheet 3 Of 3EVO20019731-LD-003-D_Street Lighting Layout Design Sheet 3 of 3.pdf (0 kb)7 Aug 2026View
Street Lighting Lux ContoursEVO20019731-LD-004-B_Street Lighting LUX Contours.pdf (0 kb)7 Aug 2026View
Vehicle Tracking Sheet 1 Of 670107157-WSP-XX-XX-DR-ZZ-0100-204_Vehicle Tracking Sheet 1 of 6.pdf (0 kb)7 Aug 2026View
Vehicle Tracking Sheet 2 Of 670107157-WSP-XX-XX-DR-ZZ-0100-205_Vehicle Tracking Sheet 2 of 6.pdf (0 kb)7 Aug 2026View
Vehicle Tracking Sheet 3 Of 670107157-WSP-XX-XX-DR-ZZ-0100-206_Vehicle Tracking Sheet 3 of 6.pdf (0 kb)7 Aug 2026View
Vehicle Tracking Sheet 4 Of 670107157-WSP-XX-XX-DR-ZZ-0100-207_Vehicle Tracking Sheet 4 of 6.pdf (0 kb)7 Aug 2026View
Vehicle Tracking Sheet 5 Of 670107157-WSP-XX-XX-DR-ZZ-0100-208_Vehicle Tracking Sheet 5 of 6.pdf (0 kb)7 Aug 2026View
Vehicle Tracking Sheet 6 Of 670107157-WSP-XX-XX-DR-ZZ-0100-209_Vehicle Tracking Sheet 6 of 6.pdf (0 kb)7 Aug 2026View
Proposed Visibility And Compliance Sheet 1 Of 670107157-WSP-XX-XX-DR-ZZ-0100-210_Proposed Visibility and Compliance Sheet 1 of 6.pdf (0 kb)7 Aug 2026View
Proposed Visibility And Compliance Sheet 2 Of 670107157-WSP-XX-XX-DR-ZZ-0100-211_Proposed Visibility and Compliance Sheet 2 of 6.pdf (0 kb)7 Aug 2026View
Proposed Visibility And Compliance Sheet 3 Of 670107157-WSP-XX-XX-DR-ZZ-0100-212_Proposed Visibility and Compliance Sheet 3 of 6.pdf (0 kb)7 Aug 2026View
Proposed Visibility And Compliance Sheet 4 Of 670107157-WSP-XX-XX-DR-ZZ-0100-213_Proposed Visibility and Compliance Sheet 4 of 6.pdf (0 kb)7 Aug 2026View
Proposed Visibility And Compliance Sheet 5 Of 670107157-WSP-XX-XX-DR-ZZ-0100-214_Proposed Visibility and Compliance Sheet 5 of 6.pdf (0 kb)7 Aug 2026View
Proposed Visibility And Compliance Sheet 6 Of 670107157-WSP-XX-XX-DR-ZZ-0100-215_Proposed Visibility and Compliance Sheet 6 of 6.pdf (0 kb)7 Aug 2026View
Indicative Levels Plan70107157-WSP-XX-XX-DR-ZZ-0101-201_Indicative Levels Plan.pdf (0 kb)7 Aug 2026View
Indicative Levels Plan NCN Connection70107157-WSP-XX-XX-DR-ZZ-0101-202_Indicative Levels Plan NCN connection.pdf (0 kb)7 Aug 2026View
Fencing Arrangement70107157-WSP-XX-XX-DR-ZZ-0300-201_Fencing Arrangement.pdf (0 kb)7 Aug 2026View
Fencing Arrangement NCN Connection70107157-WSP-XX-XX-DR-ZZ-0300-301_Fencing Arrangement NCN connection.pdf (0 kb)7 Aug 2026View
Motorway And Accomodation Works Timber Post And 4 Rail Fences (h3)Motorway and accomodation works_Timber post and 4 rail fences (H3).pdf (0 kb)7 Aug 2026View
Existing Drainage Network70107157-WSP-XX-XX-DR-ZZ-0500-201_Existing drainage network.pdf (0 kb)7 Aug 2026View
Existing Drainage NCN Connection70107157-WSP-XX-XX-DR-LP-0500-301_Existing drainage NCN connection.pdf (0 kb)7 Aug 2026View
Sheet 1 Of 3 Proposed Drainage Design70107157-WSP-XX-XX-DR-LP-0500-202_Sheet 1 of 3_Proposed drainage design.pdf (0 kb)7 Aug 2026View
Sheet 2 Of 3 Proposed Drainage Design70107157-WSP-XX-XX-DR-LP-0500-203_Sheet 2 of 3_Proposed drainage design.pdf (0 kb)7 Aug 2026View
Sheet 3 Of 3 Proposed Drainage Design70107157-WSP-XX-XX-DR-LP-0500-204_Sheet 3 of 3_Proposed drainage design.pdf (0 kb)7 Aug 2026View
Proposed Drainage Design NCN Connection70107157-WSP-XX-XX-DR-LP-0500-302_Proposed drainage design NCN connection.pdf (0 kb)7 Aug 2026View
Drainge Design Detailed Notes70107157-WSP-XX-XX-DR-ZZ-0500-0205_Drainge design Detailed Notes.pdf (0 kb)7 Aug 2026View
Ditch Cross Section70107157-WSP-XX-XX-DR-ZZ-0500-206_Ditch_Cross-Section.pdf (0 kb)7 Aug 2026View
Proposed Drainage Longitudinal Sections70107157-WSP-XX-XX-DR-ZZ-0500-207_Proposed drainage longitudinal sections.pdf (0 kb)7 Aug 2026View
Proposed Drainage Longitudinal Sections70107157-WSP-XX-XX-DR-ZZ-0500-208_Proposed drainage longitudinal sections.pdf (0 kb)7 Aug 2026View
Catchment Plan NCN Connection70107157-WSP-XX-XX-DR-LP-0500-304_Catchment plan NCN connection.pdf (0 kb)7 Aug 2026View
Orifice Plate Details And Concrete Headwall Details70107157-WSP-XX-XX-DR-ZZ-0500-209_Orifice Plate Details and Concrete Headwall Details.pdf (0 kb)7 Aug 2026View
Gully Catchment70107157-WSP-XX-XX-DR-LP-0500-210_Gully Catchment.pdf (0 kb)7 Aug 2026View
Gully Catchment Table70107157-WSP-XX-XX-DR-ZZ-0500-211_Gully Catchment Table.pdf (0 kb)7 Aug 2026View
Pipe Chamber And Gully Schedule70107157-WSP-XX-XX-SH-LP-0500-201 _pipe chamber and gully Schedule_C02.pdf (0 kb)7 Aug 2026View
Microdrainage Proposed Networkmicrodrainage - Oystercatcher-Proposed Network -25112025.pdf (0 kb)7 Aug 2026View
Microdrainage Existing Networkmicrodrainage -Oystercatcher-Existing Network - 25112025.pdf (0 kb)7 Aug 2026View
RSA Stage 1RSA Stage 1_A259 Oystercatcher_April2026_REDACTEDxx.pdf (0 kb)7 Aug 2026View
RSA Stage 1 Designers ResponseRSA Stage 1 Designers Response_A259 Oystercatcher_May2026_REDACTED.pdf (0 kb)7 Aug 2026View
Access Design ApproachB2233 Yapton Road Access Design Approach_A259 Oystercatcher_Oct2025.pdf (0 kb)7 Aug 2026View
Sussex Police TRO AcceptanceSussex Police_TRO acceptance_A259 Oystercatche_Redacted.pdf (0 kb)7 Aug 2026View
TRO Location Plan Current Alignment70107157-WSP-XX-XX-SK-LP-0200-001_Yapton Road TRO Location Plan Current Alignment.pdf (0 kb)7 Aug 2026View
TRO Location Plan Proposed Alignment70107157-WSP-XX-XX-SK-LP-0200-002_Yapton Road TRO Location Plan Proposed Alignment.pdf (0 kb)7 Aug 2026View
Member TRO AcceptanceMember_TRO acceptance_A259 Oystercatcher_Redacted.pdf (0 kb)7 Aug 2026View
Walking, Cycling and Horse Riding AssessmentWCHAR_A259_Feb2023_REDACTED.pdf (0 kb)7 Aug 2026View
Walking, Cycling and Horse Riding Assessment Summary Note Part 1WCHAR Summary Note_A259_Part 1_Dec2025_REDACTED.pdf (0 kb)7 Aug 2026View
Walking, Cycling and Horse Riding Assessment Summary Note Part 2WCHAR Summary Note_A259_Part 2_Dec2025_REDACTED.pdf (0 kb)7 Aug 2026View
Public Consultation Summary ReportPublic consultation summary report_A259_Aug2023.pdf (0 kb)7 Aug 2026View
Sustainability StatementSustainability Statement_A259 Oystercatcher_June2025_REDACTED.pdf (0 kb)7 Aug 2026View
Arboricultural Impact AssessmentArboricultural Impact Assessment_A259 Oystercatcher_June2026.pdf (0 kb)7 Aug 2026View
Arboricultural Impact Assessment Appendix B Tree ScheduleArboricultural Impact Assessment_Appendix B - Tree Schedule.pdf (0 kb)7 Aug 2026View
Arboricultural Impact Assessment Appendix C TRPPArboricultural Impact Assessment_Appendix C - TRPP_Revised.pdf (0 kb)7 Aug 2026View
Arboricultural Impact Assessment Appendix E TPOArboricultural Impact Assessment_Appendix E - TPO-CM-1-04.pdf (0 kb)7 Aug 2026View
BNG Statutory MetricAnnex B - BNG Statutory Metric(1).xlsx (0 kb)7 Aug 2026View
BNG Annex B Condition AssessmentAnnex B - Condition Assessment.xlsx (0 kb)7 Aug 2026View
Draft Section 106 Agreement A259 OystercatcherDraft Section 106 Agreement_A259 Oystercatcher_June2026.pdf (0 kb)7 Aug 2026View
GCN Technical NoteGCN Technical Note_A259 Oystercatcher_April2026.pdf (0 kb)7 Aug 2026View
EIA Non Technical SummaryNon Technical Summary_Accessible.pdf (0 kb)7 Aug 2026View
Chapter 0 Table Of Contents And GlossaryChapter 0 Table of Contents and Glossary.pdf (0 kb)7 Aug 2026View
Chapter 1 IntroductionChapter 1 Introduction.pdf (0 kb)7 Aug 2026View
Chapter 2 The Existing SiteChapter 2 The Existing Site_Revised.pdf (0 kb)7 Aug 2026View
Chapter 3 Description Of The Proposed SchemeChapter 3 Description of the Proposed Scheme_Revised.pdf (0 kb)7 Aug 2026View
Chapter 4 Reasonable Alternatives ConsideredChapter 4 Reasonable Alternatives Considered.pdf (0 kb)7 Aug 2026View
Chapter 5 Approach To EIAChapter 5 Approach to EIA.pdf (0 kb)7 Aug 2026View
Chapter 6 Air QualityChapter 6 Air Quality.pdf (0 kb)7 Aug 2026View
Chapter 7 Cultural Heritage And ArchaeologyChapter 7 Cultural Heritage and Archaeology.pdf (0 kb)7 Aug 2026View
Chapter 8 Ecology And BiodiversityChapter 8 Ecology and Biodiversity.pdf (0 kb)7 Aug 2026View
Chapter 9 Greenhouse GasesChapter 9 Greenhouse Gases.pdf (0 kb)7 Aug 2026View
Chapter 10 Ground Conditions And SoilsChapter 10 Ground Conditions and Soils.pdf (0 kb)7 Aug 2026View
Chapter 11 Landscape And VisualChapter 11 Landscape and Visual.pdf (0 kb)7 Aug 2026View
Chapter 12 Material Assets And WasteChapter 12 Material Assets and Waste.pdf (0 kb)7 Aug 2026View
Chapter 13 Noise And VibrationChapter 13 Noise and Vibration.pdf (0 kb)7 Aug 2026View
Chapter 14 Population And Human HealthChapter 14 Population and Human Health.pdf (0 kb)7 Aug 2026View
Chapter 15 Traffic And TransportChapter 15 Traffic and Transport.pdf (0 kb)7 Aug 2026View
Chapter 16 Water Environment Drainage And Flood RiskChapter 16 Water Environment Drainage and Flood Risk.pdf (0 kb)7 Aug 2026View
Chapter 17 Cumulative EffectsChapter 17 Cumulative Effects.pdf (0 kb)7 Aug 2026View
Chapter 18 SummaryChapter 18 Summary.pdf (0 kb)7 Aug 2026View
Figure 1 1 Site Boundary PlanFigure 1-1 Site Boundary Plan.pdf (0 kb)7 Aug 2026View
Figure 1 2 – Proposed Scheme PlanFigure 1-2 – Proposed Scheme Plan_Revised.pdf (0 kb)7 Aug 2026View
Figure 2 1 Environmental Features PlanFigure 2-1 Environmental Features Plan.pdf (0 kb)7 Aug 2026View
Figure 3 1 Land At Climping DevelopmentFigure 3-1 Land at Climping Development.pdf (0 kb)7 Aug 2026View
Figure 6 1 Air Quality Study AreaFigure 6-1 Air Quality Study Area.pdf (0 kb)7 Aug 2026View
Figure 6 2 Local Air Quality Monitoring SitesFigure 6-2 Local Air Quality Monitoring Sites.pdf (0 kb)7 Aug 2026View
Figure 6 3 Modelled Road NetworkFigure 6-3 Modelled Road Network.pdf (0 kb)7 Aug 2026View
Figure 6 4 Sensitive Human ReceptorsFigure 6-4 Sensitive Human Receptors.pdf (0 kb)7 Aug 2026View
Figure 6 5 Construction Dust Study AreaFigure 6-5 Construction Dust Study Area.pdf (0 kb)7 Aug 2026View
Figure 6 6 2028 Dm No2 ConcentrationFigure 6-6 2028 DM NO2 Concentration.pdf (0 kb)7 Aug 2026View
Figure 6 7 2028 Ds No2 ConcentrationFigure 6-7 2028 DS NO2 Concentration.pdf (0 kb)7 Aug 2026View
Figure 6 8 2028 No2 Concentration Percentage ChangeFigure 6-8 2028 NO2 Concentration Percentage Change.pdf (0 kb)7 Aug 2026View
Figure 6 9 2028 Dm Pm10 ConcentrationFigure 6-9 2028 DM PM10 Concentration.pdf (0 kb)7 Aug 2026View
Figure 6 10 Ds Pm10 ConcentrationFigure 6-10 DS PM10 Concentration.pdf (0 kb)7 Aug 2026View
Figure 6 11 2028 Pm10 Concentration Percentage ChangeFigure 6-11 2028 PM10 Concentration Percentage Change.pdf (0 kb)7 Aug 2026View
Figure 6 12 2028 Dm Pm2.5 ConcentrationFigure 6-12 2028 DM PM2.5 Concentration.pdf (0 kb)7 Aug 2026View
Figure 6 13 2028 Ds Pm2.5 ConcentrationFigure 6-13 2028 DS PM2.5 Concentration.pdf (0 kb)7 Aug 2026View
Figure 6 14 2028 Pm2.5 Concentration Percentage ChangeFigure 6-14 2028 PM2.5 Concentration Percentage Change.pdf (0 kb)7 Aug 2026View
Figure 6 15 2030 Dm No2 ConcentrationFigure 6-15 2030 DM NO2 Concentration.pdf (0 kb)7 Aug 2026View
Figure 6 16 2030 Ds No2 ConcentrationFigure 6-16 2030 DS NO2 Concentration.pdf (0 kb)7 Aug 2026View
Figure 6 17 2030 No2 Concentration Percentage ChangeFigure 6-17 2030 NO2 Concentration Percentage Change.pdf (0 kb)7 Aug 2026View
Figure 6 18 2030 Dm Pm10 ConcentrationFigure 6-18 2030 DM PM10 Concentration.pdf (0 kb)7 Aug 2026View
Figure 6 19 2030 Ds Pm10 ConcentrationFigure 6-19 2030 DS PM10 Concentration.pdf (0 kb)7 Aug 2026View
Figure 6 20 2030 Pm10 Concentration Percentage ChangeFigure 6-20 2030 PM10 Concentration Percentage Change.pdf (0 kb)7 Aug 2026View
Figure 6 21 2030 Dm Pm2.5 ConcentrationFigure 6-21 2030 DM PM2.5 Concentration.pdf (0 kb)7 Aug 2026View
Figure 6 22 2030 Ds Pm2.5 ConcentrationFigure 6-22 2030 DS PM2.5 Concentration.pdf (0 kb)7 Aug 2026View
Figure 6 23 2030 Pm2.5 Concentration Percentage ChangeFigure 6-23 2030 PM2.5 Concentration Percentage Change.pdf (0 kb)7 Aug 2026View
Figure 11 1 Landscape General ArrangementFigure 11-1 Landscape General Arrangement.pdf (0 kb)7 Aug 2026View
Figure 11 2 Site Context PlanFigure 11-2 Site Context Plan.pdf (0 kb)7 Aug 2026View
Figure 11 3 Zone Of Theoretical Visibility PlanFigure 11-3 Zone of Theoretical Visibility Plan.pdf (0 kb)7 Aug 2026View
Figure 11 4 Landscape Character PlanFigure 11-4 Landscape Character Plan.pdf (0 kb)7 Aug 2026View
Figure 11 5 Visual Assessment PlanFigure 11-5 Visual Assessment Plan.pdf (0 kb)7 Aug 2026View
Figure 11 6 Environmental MasterplanFigure 11-6 Environmental Masterplan_Revised.pdf (0 kb)7 Aug 2026View
Figure 11 7 Environmental Illustrative SectionsFigure 11-7 Environmental Illustrative Sections_Revised.pdf (0 kb)7 Aug 2026View
Figure 13 1 Operational Noise Study AreaFigure 13-1 - Operational Noise Study Area.pdf (0 kb)7 Aug 2026View
Figure 13 2 Non Dwelling Noise Sensitive ReceptorsFigure 13-2 - Non-Dwelling Noise Sensitive Receptors.pdf (0 kb)7 Aug 2026View
Figure 13 3 Opening Year Daytime Baseline Noise LevelsFigure 13-3 - Opening Year Daytime Baseline Noise Levels.pdf (0 kb)7 Aug 2026View
Figure 13 4 Opening Year Daytime With Scheme Noise LevelsFigure 13-4 - Opening Year - Daytime with Scheme Noise Levels.pdf (0 kb)7 Aug 2026View
Figure 13 5 Future Year Daytime With Scheme Noise LevelsFigure 13-5 - Future Year - Daytime with Scheme Noise Levels.pdf (0 kb)7 Aug 2026View
Figure 13 6 Short Term Daytime Noise Level ChangesFigure 13-6 - Short Term Daytime Noise Level Changes.pdf (0 kb)7 Aug 2026View
Figure 13 7 Long Term Daytime Noise Level ChangesFigure 13-7 - Long Term Daytime Noise Level Changes.pdf (0 kb)7 Aug 2026View
Figure 16 1 Site Boundary PlanFigure 16-1 Site Boundary Plan.pdf (0 kb)7 Aug 2026View
Figure 16 2 Surface Watercourses Within Study AreaFigure 16-2 Surface Watercourses within Study Area.pdf (0 kb)7 Aug 2026View
Figure 16 3 Flood Map For PlanningFigure 16-3 Flood Map for Planning.pdf (0 kb)7 Aug 2026View
Figure 16 4 Water Framework Directive Groundwater BodiesFigure 16-4 Water Framework Directive Groundwater Bodies.pdf (0 kb)7 Aug 2026View
Figure 16 5 Risk Of Flooding From Surface WaterFigure 16-5 Risk of Flooding from Surface Water.pdf (0 kb)7 Aug 2026View
Figure 17 1 Stage 4 Other DevelopmentsFigure 17-1 Stage 4 Other Developments.pdf (0 kb)7 Aug 2026View
Appendix 1 1 Scoping ReportAppendix 1-1 Scoping Report.pdf (0 kb)7 Aug 2026View
Appendix 1 1 Scoping Report Appendix CAppendix 1-1 Scoping Report Appendix C__.pdf (0 kb)10 Aug 2026View
Appendix 1 1 Scoping Report Appendix D Part 1Scoping Report Appendix D(1).pdf (0 kb)7 Aug 2026View
Appendix 1 1 Scoping Report Appendix D Part 2Scoping Report Appendix D(2).pdf (0 kb)7 Aug 2026View
Appendix 1 2 Scoping OpinionAppendix 1-2 Scoping Opinion.pdf (0 kb)7 Aug 2026View
Appendix 3 1 OCEMP RevisedAppendix 3-1 OCEMP_Revised.pdf (0 kb)7 Aug 2026View
Appendix 6 1 Air Quality Legislation Policy And GuidanceAppendix 6-1 Air Quality Legislation Policy and Guidance.pdf (0 kb)7 Aug 2026View
Appendix 6 2 Details Of Assessment For Construction PhaseAppendix 6-2 Details of Assessment for Construction Phase.pdf (0 kb)7 Aug 2026View
Appendix 6 3 Details Of Assessment For Operational PhaseAppendix 6-3 Details of Assessment for Operational Phase.pdf (0 kb)7 Aug 2026View
Appendix 7 1 Annex C FiguresAppendix 7-1 Annex C Figures.pdf (0 kb)7 Aug 2026View
Appendix 7 1 Historic Environment Desk Based AssessmentAppendix 7-1 Historic Environment Desk-Based Assessment.pdf (0 kb)7 Aug 2026View
Appendix 8 1 Preliminary Ecological AppraisalAppendix 8-1 Preliminary Ecological Appraisal.pdf (0 kb)7 Aug 2026View
Appendix 8 2 Preliminary Bat Roost Assessment ReportAppendix 8-2 Preliminary Bat Roost Assessment Report.pdf (0 kb)7 Aug 2026View
Appendix 8 3 Bat Survey ReportAppendix 8-3 Bat Survey Report.pdf (0 kb)7 Aug 2026View
Appendix 8 4 Bat Activity ReportAppendix 8-4 Bat Activity Report.pdf (0 kb)7 Aug 2026View
Public Appendix 8 5 Badger Survey ReportPUBLIC Appendix 8-5 Badger Survey Report.pdf (0 kb)7 Aug 2026View
Appendix 8 7 Dormouse ReportAppendix 8-7 Dormouse Report.pdf (0 kb)7 Aug 2026View
Appendix 8 8 Great Crested Newt Survey ReportAppendix 8-8 Great Crested Newt Survey Report_.pdf (0 kb)15 Sept 2026View
Appendix 8 9 Reptile ReportAppendix 8-9 Reptile Report.pdf (0 kb)7 Aug 2026View
Appendix 8 10 Technical Note Woodland UK Hab SurveyAppendix 8-10 Technical Note - A259 - Woodland UKHab Survey.pdf (0 kb)7 Aug 2026View
Public Appendix 8 11 Ecological Technical NotePUBLIC Appendix 8-11 Ecological Technical Note.pdf (0 kb)7 Aug 2026View
Appendix 8 12 Biodiversity Net Gain Report Including Statement And Draft Habitat And Monitoring PlanAppendix 8-12 Biodiversity Net Gain Report Including Statement and Draft Habitat and Monitoring Plan.pdf (0 kb)7 Aug 2026View
Appendix 8 13 Habitats Regulations Assessment Stage 1Appendix 8-13 Habitats Regulations Assessment Stage 1.pdf (0 kb)7 Aug 2026View
Appendix 9 1 Legislative Framework And PolicyAppendix 9-1 Legislative Framework and Policy.pdf (0 kb)7 Aug 2026View
Appendix 10 1 Part 1 Preliminary Risk Assessment And Generic Quantitative Risk Assessment ReportAppendix 10-1 Part1 Preliminary Risk Assessment and Generic Quantitative Risk Assessment Report.pdf (0 kb)7 Aug 2026View
Appendix 10 1 Part 2 Preliminary Risk Assessment And Generic Quantitative Risk Assessment ReportAppendix 10-1 Part2 Preliminary Risk Assessment and Generic Quantitative Risk Assessment Report.pdf (0 kb)7 Aug 2026View
Appendix 11 1 Lighting Statement Part 1Appendix 11-1 Lighting Statement Part 1.pdf (0 kb)7 Aug 2026View
Appendix 11 1 Lighting Statement Part 2Appendix 11-1 Lighting Statement Part 2.pdf (0 kb)7 Aug 2026View
Appendix 11 2 Landscape And Visual MethodologyAppendix 11-2 Landscape and Visual Methodology.pdf (0 kb)7 Aug 2026View
Appendix 11 3 Landscape And Visual Baseline PhotographsAppendix 11-3 Landscape and Visual Baseline Photographs.pdf (0 kb)7 Aug 2026View
Appendix 11 4 Outline Landscape And Ecological Management Plan RevisedAppendix 11-4 Outline Landscape and Ecological Management Plan_Revised.pdf (0 kb)7 Aug 2026View
Appendix 13 1 Noise And Vibration Methodology And Assessment Updated June2026Appendix 13-1 Noise and Vibration Methodology and Assessment_Updated_June2026.pdf (0 kb)7 Aug 2026View
Appendix 13 2 Glossary Of Noise And Vibration TerminologyAppendix 13-2 Glossary of Noise and Vibration Terminology.pdf (0 kb)7 Aug 2026View
Appendix 13 3 Legislation Policy And GuidanceAppendix 13-3 Legislation Policy and Guidance.pdf (0 kb)7 Aug 2026View
Appendix 13 4 Noise MonitoringAppendix 13-4 Noise Monitoring.pdf (0 kb)7 Aug 2026View
Appendix 13 5 Mitigation During ConstructionAppendix 13-5 Mitigation During Construction.pdf (0 kb)7 Aug 2026View
Appendix 15 1 Transport Assessment Part 1Appendix 15-1 Transport Assessment_Part 1_REDACTED.pdf (0 kb)7 Aug 2026View
Appendix 15 1 Transport Assessment Part 2Appendix 15-1 Transport Assessment_Part 2_Revised.pdf (0 kb)7 Aug 2026View
Appendix 15 1 Transport Assessment Part 3Appendix 15-1 Transport Assessment_Part 3.pdf (0 kb)7 Aug 2026View
Appendix 15 2 Outline Construction Traffic Management PlanAppendix 15-2 Outline Construction Traffic Management Plan_Revised.pdf (0 kb)7 Aug 2026View
Appendix 16 1 Flood Risk Technical Note Part 1Appendix 16-1 Flood Risk Technical Note_Part 1_REDACTED.pdf (0 kb)7 Aug 2026View
Appendix 16 1 Flood Risk Technical Note Part 2Appendix 16-1 Flood Risk Technical Note_Part 2_REDACTED.pdf (0 kb)7 Aug 2026View
Appendix 16 1 Flood Risk Technical Note Part 3Appendix 16-1 Flood Risk Technical Note_Part 3_REDACTED.pdf (0 kb)7 Aug 2026View
Appendix 16 2 Drainage Network Water Quality AssessmentAppendix 16-2 Drainage Network Water Quality Assessment.pdf (0 kb)7 Aug 2026View
Appendix 17 1 Long List And Short List Of Other DevelopmentsAppendix 17-1 Long-List and Short List of Other developments.pdf (0 kb)7 Aug 2026View
Consultation ResponseHistoric England.pdf (0 kb)11 Aug 2026View
Consultation ResponseActive Travel England.pdf (0 kb)14 Aug 2026View
Consultation ResponseNatural England.pdf (0 kb)20 Aug 2026View
Consultation ResponseSDNPA.pdf (0 kb)21 Aug 2026View
Consultation ResponseEnvironment Agency.pdf (0 kb)26 Aug 2026View
Consultation ResponseLLFA.pdf (0 kb)4 Sept 2026View
Consultation ResponseClymping Parish Council.pdf (0 kb)8 Sept 2026View
Consultation ResponseNational Highways.pdf (0 kb)8 Sept 2026View
Consultation ResponseMiddleton-on-Sea Parish Council.pdf (0 kb)8 Sept 2026View
Consultation ResponseJoanne Davis Comment 14-09-2026.pdf (0 kb)14 Sept 2026View
Consultation ResponseWSCC Arboriculture.pdf (0 kb)15 Sept 2026View
Consultation ResponseWSCC Highways.pdf (0 kb)15 Sept 2026View
Consultation ResponseDistrict Licensing Officer (Great Crested Newts).pdf (0 kb)17 Sept 2026View
Consultation ResponseWSCC Archaeology.pdf (0 kb)22 Sept 2026View
Consultation ResponseArun District Council.pdf (0 kb)24 Sept 2026View
Consultation ResponseArun Environmental Health Officer.pdf (0 kb)29 Sept 2026View
Consultation ResponseWSCC Ecology.pdf (0 kb)1 Oct 2026View
EIA Screening OpinionScreening Opinion - CM23b.pdf (0 kb)10 Aug 2026View
Objection Steve Chapman 11/08/2026Steve Chapman Objection 11-08-2026.pdf (0 kb)11 Aug 2026View
Objection Alan And Sylvia Green 22/08/2026Alan and Sylvia Green Objection 22-08-2026.pdf (0 kb)24 Aug 2026View
Support Pamela Godfrey 29/08/2026Pamela Godfrey Support 29-08-2026.pdf (0 kb)29 Aug 2026View
Comment Ian Burgess 02/09/2026Ian Burgess Comment 02-09-2026.pdf (0 kb)2 Sept 2026View
Objection R Banting 03/09/2026R Banting Objection 03-09-2026.pdf (0 kb)3 Sept 2026View
Support Peter Mules 03/09/2026Peter Mules Support 03-09-2026.pdf (0 kb)3 Sept 2026View
Comment Joyce Ford 04/09/2026Joyce Ford Comment 04-09-2026.pdf (0 kb)4 Sept 2026View
Support Danica Malloy 05/09/2026Danica Malloy Support 05-09-2026.pdf (0 kb)5 Sept 2026View
Objection Simon Wolf 07/09/2026Simon Wolf Objection 07-09-2026.pdf (0 kb)7 Sept 2026View
Objection Fiona Howard 07/09/2026Fiona Howard Objection 07-09-2026.pdf (0 kb)7 Sept 2026View
Comment Wendy Robinson 07/09/2026Wendy Robinson Comment 07-09-2026.pdf (0 kb)7 Sept 2026View
Objection Marion Wright 09/09/26Marion Wright Objections 09-09-26.pdf (0 kb)9 Sept 2026View
Comment Mary Boswell 11/09/2026Mary Boswell Comment 11-09-2026.pdf (0 kb)11 Sept 2026View
Objection Tracey Villa 12/09/26Tracey Villa, Objection 12-09-26.pdf (0 kb)14 Sept 2026View
Objection Alison May Baird 13/09/2026Alison May Baird Objection 13-09-2026.pdf (0 kb)13 Sept 2026View
Objection Mrs Alison Tait Baird 13/09/2026Mrs Alison Tait Baird Objection 13-09-2026.pdf (0 kb)13 Sept 2026View
Comment Mr alan Joseph keogh 05/10/2026Mr alan Joseph keogh Comment 05-10-2026.pdf (0 kb)5 Oct 2026View
Appendix 8 8 Great Crested Newt Survey ReportAppendix 8-8 Great Crested Newt Survey Report.pdf (0 kb)7 Aug 2026View
Appendix 8 8 Gcn Report Figures 1 3Appendix 8-8 GCN Report Figures 1-3.pdf (0 kb)10 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Valid

    Published milestoneCouncil source
  2. Deadline for Comments

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  3. Determination Date

    Scheduled

    Future date published by the council.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.