Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Blenheim Palace Blenheim Park Woodstock Oxfordshire OX20 1PS
Last published check: 3 Oct 2026, 23:01. Check the council record for more recent changes.
Blenheim Palace Blenheim Park Woodstock Oxfordshire OX20 1PS
This record has no verified map location.
View council mapProposed repair works to the roofs and masonry to the central portion of Blenheim Palace. (amended description)
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| APPROVAL - FULL APPLICATIONDecision Notice · PDF | 14 Nov 2024 | View |
| BIODIVERSITY CONSULTEE COMMENTConsultee Comment · PDF | 7 Nov 2024 | View |
| HISTORIC ENGLAND CONSULTATION RESPONSEConsultee Comment · PDF | 10 Sept 2024 | View |
| BIODIVERSITY NET GAIN STATEMENT FORMBNG Statement · PDF | 9 Sept 2024 | View |
| BAT SURVEYReport · PDF | 16 Aug 2024 | View |
| Application FormApplication Form · PDF | 8 Aug 2024 | View |
| LOCATIONPLANDrawing · PDF | 8 Aug 2024 | View |
| HIGH LEVEL WORKS_HERITAGE IMPACT ASSESSMENTSupporting Documents · PDF | 8 Aug 2024 | View |
| ROOF PLAN REPAIRS-MASONRY PRIORITIESDrawing · PDF | 8 Aug 2024 | View |
| GROUND FLOOR PLAN AS EXISTINGDrawing · PDF | 8 Aug 2024 | View |
| FIRST FLOOR PLAN AS EXISTINGDrawing · PDF | 8 Aug 2024 | View |
| SECOND FLOOR PLAN AS EXISTINGDrawing · PDF | 8 Aug 2024 | View |
| UNDERCROFT FLOOR PLAN AS EXISTINGDrawing · PDF | 8 Aug 2024 | View |
| ROOF PLAN AS EXISTINGDrawing · PDF | 8 Aug 2024 | View |
| GREAT HALL AND SALOON INTERNAL SECTION EAST FACINGDrawing · PDF | 8 Aug 2024 | View |
| GREAT HALL AND SALOON INTERNAL SECTION WEST FACINGDrawing · PDF | 8 Aug 2024 | View |
| SALOON INTERNAL SECTION NORTH FACINGDrawing · PDF | 8 Aug 2024 | View |
| SALOON INTERNAL SECTION SOUTH FACINGDrawing · PDF | 8 Aug 2024 | View |
| GREAT HALL INTERNAL SECTION NORTH FACING (WHANDHH)Drawing · PDF | 8 Aug 2024 | View |
| GREAT HALL INTERNAL SECTION SOUTH FACING (WHANDHH)Drawing · PDF | 8 Aug 2024 | View |
| GREAT HALL WEST ELEVATIONDrawing · PDF | 8 Aug 2024 | View |
| GREAT HALL EAST ELEVATIONDrawing · PDF | 8 Aug 2024 | View |
| FULL PALACE NORTH ELEVATIONDrawing · PDF | 8 Aug 2024 | View |
| FULL PALACE SOUTH ELEVATIONDrawing · PDF | 8 Aug 2024 | View |
| LOWER ROOFS AS EXISTINGDrawing · PDF | 8 Aug 2024 | View |
| UPPER ROOFS AS EXISTINGDrawing · PDF | 8 Aug 2024 | View |
| RAINWATER DRAINAGE AS EXISTINGDrawing · PDF | 8 Aug 2024 | View |
| INDICATIVE ORIGINAL ARRANGEMENTDrawing · PDF | 8 Aug 2024 | View |
| GREATHALL DRAINAGE ROUTES-NORTH EAST AS EXISTINGDrawing · PDF | 8 Aug 2024 | View |
| GREATHALL DRAINAGE DETAIL-SECTION SOUTH EAST AS EXISTINGDrawing · PDF | 8 Aug 2024 | View |
| BUTTERFLY ROOF-SECTION SOUTH AS EXISTINGDrawing · PDF | 8 Aug 2024 | View |
| BUTTERFLY ROOF-SECTION WEST AS EXISTINGDrawing · PDF | 8 Aug 2024 | View |
| FULL PALACE NORTH ELEVATIONDrawing · PDF | 8 Aug 2024 | View |
| NORTH PORTICO FRONT ELEVATIONDrawing · PDF | 8 Aug 2024 | View |
| GREATHALL NORTH ELEVATION LOWERDrawing · PDF | 8 Aug 2024 | View |
| GREATHALL ROOF EAST ELEVATIONDrawing · PDF | 8 Aug 2024 | View |
| GREATHALL ROOF SOUTH ELEVATIONDrawing · PDF | 8 Aug 2024 | View |
| GREATHALL ROOF WEST ELEVATIONDrawing · PDF | 8 Aug 2024 | View |
| FULL PALACE SOUTH ELEVATIONDrawing · PDF | 8 Aug 2024 | View |
| SOUTH PORTICO EAST ELEVATIONSDrawing · PDF | 8 Aug 2024 | View |
| GREATHALL PORTICO PARAPET RETURNSDrawing · PDF | 8 Aug 2024 | View |
| GREATHALL NORTH AND SOUTH PARAPET RETURNSDrawing · PDF | 8 Aug 2024 | View |
| GREATHALL EAST AND WEST PARAPET RETURNSDrawing · PDF | 8 Aug 2024 | View |
| SALOON PARAPET RETURNSDrawing · PDF | 8 Aug 2024 | View |
| NORTH PORTICO PEDIMENT ELEVATIONSDrawing · PDF | 8 Aug 2024 | View |
| NORTH PORTICO WEST ELEVATIONDrawing · PDF | 8 Aug 2024 | View |
| NORTH PORTICO EAST ELEVATIONDrawing · PDF | 8 Aug 2024 | View |
| FULL PALACE SOUTH ELEVATIONDrawing · PDF | 8 Aug 2024 | View |
| SOUTH PORTICO WEST ELEVATIONSDrawing · PDF | 8 Aug 2024 | View |
| HOUSEMAIDS HEIGHTS PARAPET RETURNSDrawing · PDF | 8 Aug 2024 | View |
| EAST COURTYARD NORTH AND EAST FACING ELEVATIONSDrawing · PDF | 8 Aug 2024 | View |
| WEST ROOF PARAPET RETURNSDrawing · PDF | 8 Aug 2024 | View |
| FULL PALACE NORTH ELEVATIONDrawing · PDF | 8 Aug 2024 | View |
| NORTH PORTICO FRONT ELEVATIONDrawing · PDF | 8 Aug 2024 | View |
| GREATHALL NORTH ELEVATION LOWERDrawing · PDF | 8 Aug 2024 | View |
| GREATHALL ROOF EAST ELEVATIONDrawing · PDF | 8 Aug 2024 | View |
| GREATHALL ROOF SOUTH ELEVATIONDrawing · PDF | 8 Aug 2024 | View |
| GREATHALL ROOF WEST ELEVATIONDrawing · PDF | 8 Aug 2024 | View |
| SOUTH ELEVATION (1OF2)Drawing · PDF | 8 Aug 2024 | View |
| SOUTH PORTICO EAST ELEVATIONSDrawing · PDF | 8 Aug 2024 | View |
| GREATHALL PORTICO PARAPET RETURNSDrawing · PDF | 8 Aug 2024 | View |
| GREATHALL NORTH AND SOUTH PARAPET RETURNSDrawing · PDF | 8 Aug 2024 | View |
| GREATHALL EAST AND WEST PARAPET RETURNSDrawing · PDF | 8 Aug 2024 | View |
| SALOON PARAPET RETURNSDrawing · PDF | 8 Aug 2024 | View |
| NORTH PORTICO PEDIMENT ELEVATIONSDrawing · PDF | 8 Aug 2024 | View |
| NORTH PORTICO WEST ELEVATIONDrawing · PDF | 8 Aug 2024 | View |
| NORTH PORTICO EAST ELEVATIONDrawing · PDF | 8 Aug 2024 | View |
| SOUTH ELEVATION (2OF2)Drawing · PDF | 8 Aug 2024 | View |
| SOUTH PORTICO WEST ELEVATIONSDrawing · PDF | 8 Aug 2024 | View |
| APPLIED CLEANING STRATEGYDrawing · PDF | 8 Aug 2024 | View |
| HOUSEMAIDS HEIGHTS PARAPET RETURNSDrawing · PDF | 8 Aug 2024 | View |
| EAST COURTYARD NORTH AND EAST FACING ELEVATIONSDrawing · PDF | 8 Aug 2024 | View |
| WORKMANS HEIGHTS PARAPET RETURNSDrawing · PDF | 8 Aug 2024 | View |
| WEST COURTYARD NORTH AND EAST ELEVATIONSDrawing · PDF | 8 Aug 2024 | View |
| WINDOW TYPES NORTH AND SOUTH ELEVATIONSDrawing · PDF | 8 Aug 2024 | View |
| NORTH PORTICO EAST AND WEST ELEVATIONSDrawing · PDF | 8 Aug 2024 | View |
| REPAIR WORKS-TYPICAL WINDOW REPAIRSDrawing · PDF | 8 Aug 2024 | View |
| GREATHALL AND SALOON-TYPICAL WINDOWS-BLINDS AND UV FILM INSTALLATIONDrawing · PDF | 8 Aug 2024 | View |
| LOWER ROOF COVERINGS PLAN AS PROPOSEDDrawing · PDF | 8 Aug 2024 | View |
| LOWER ROOF SUBSTRATE PROPOSALSDrawing · PDF | 8 Aug 2024 | View |
| UPPER ROOF COVERINGS PROPOSALSDrawing · PDF | 8 Aug 2024 | View |
| UPPER ROOF SUBSTRATE PROPOSALSDrawing · PDF | 8 Aug 2024 | View |
| INSULATION LOCATION AND TYPEDrawing · PDF | 8 Aug 2024 | View |
| GREATHALL DRAINAGE ROUTES-NORTH EAST AS PROPOSEDDrawing · PDF | 8 Aug 2024 | View |
| GREATHALL DRAINAGE DETAIL-SECTION SOUTH EAST AS PROPOSEDDrawing · PDF | 8 Aug 2024 | View |
| BUTTERFLY ROOF-SOUTH ELEVATION AS PROPOSEDDrawing · PDF | 8 Aug 2024 | View |
| PROPOSED BUTTERFLY ROOF SECTION WESTDrawing · PDF | 8 Aug 2024 | View |
| BUTTERFLY ROOF INSULATION CONCEPTDrawing · PDF | 8 Aug 2024 | View |
| GALLERIES ROOF INSULATION CONCEPTDrawing · PDF | 8 Aug 2024 | View |
| HOUSEMAIDS HEIGHTS ROOF INSULATION CONCEPTDrawing · PDF | 8 Aug 2024 | View |
| SALOON ROOF INSULATION CONCEPTDrawing · PDF | 8 Aug 2024 | View |
| GREAT HALL ROOF INSULATION CONCEPTDrawing · PDF | 8 Aug 2024 | View |
| SALOON GUTTER SECTIONS (1OF2)Drawing · PDF | 8 Aug 2024 | View |
| SALOON GUTTER SECTIONS (2OF2)Drawing · PDF | 8 Aug 2024 | View |
| GALLERIES (1OF2)Drawing · PDF | 8 Aug 2024 | View |
| GALLERIES (2OF2)Drawing · PDF | 8 Aug 2024 | View |
| WORKMANS HEIGHTS-SOUTH WEST GUTTER SECTIONSDrawing · PDF | 8 Aug 2024 | View |
| WORKMANS HEIGHTS WEST GUTTER SECTIONSDrawing · PDF | 8 Aug 2024 | View |
| WORKMANS HEIGHTS-NORTHNORTHEASTANDNORTH WEST GUTTER SECTDrawing · PDF | 8 Aug 2024 | View |
| WORKMANS HEIGHTS-EAST GUTTER SECTIONSDrawing · PDF | 8 Aug 2024 | View |
| WORKMANS HEIGHTS-EAST AND SOUTH EAST GUTTER RUNDrawing · PDF | 8 Aug 2024 | View |
| TYPICAL GUTTER DETAILDrawing · PDF | 8 Aug 2024 | View |
| GREATHALL-EAST GUTTER SECTIONSDrawing · PDF | 8 Aug 2024 | View |
| GREATHALL-SOUTH EAST GUTTER SECTIONSDrawing · PDF | 8 Aug 2024 | View |
| GREATHALL-SOUTH WEST GUTTER SECTIONSDrawing · PDF | 8 Aug 2024 | View |
| GREATHALL-WEST GUTTER SECTIONSDrawing · PDF | 8 Aug 2024 | View |
| PROPOSED ROOF KEY PLANDrawing · PDF | 8 Aug 2024 | View |
| HEIGHTS SECOND FLOORPLAN-SAFE ACCESSDrawing · PDF | 8 Aug 2024 | View |
| LOWER ROOF PROPOSED -SAFE ACCESSDrawing · PDF | 8 Aug 2024 | View |
| UPPER ROOF PROPOSED-SAFE ACCESSDrawing · PDF | 8 Aug 2024 | View |
| HEIGHTS ROOF VOID PLAN-SAFE ACCESSDrawing · PDF | 8 Aug 2024 | View |
| TYPICAL ROOF DETAIL LEAD DETAILS 1OF3Drawing · PDF | 8 Aug 2024 | View |
| TYPICAL ROOF DETAILS LEAD DETAILS 2OF3Drawing · PDF | 8 Aug 2024 | View |
| TYPICAL ROOF DETAILS LEAD DETAILS 3OF3Drawing · PDF | 8 Aug 2024 | View |
| TYPICAL ROOF DETAIL-HEIGHTS TYPICAL DETAILSDrawing · PDF | 8 Aug 2024 | View |
| TYPICAL ROOF DETAIL-SALOON TYPICAL DETAILSDrawing · PDF | 8 Aug 2024 | View |
| TYPICAL ROOF DETAIL-GREAT HALL TYPICAL DETAILSDrawing · PDF | 8 Aug 2024 | View |
| TYPICAL ROOF DETAIL-GALLERIES TYPICAL DETAILSDrawing · PDF | 8 Aug 2024 | View |
| TYPICAL ROOF DETAIL-BUTTERFLY ROOF TYPICAL DETAILSDrawing · PDF | 8 Aug 2024 | View |
| TYPICAL ROOF DETAIL-LEAD STEPS DETAILSDrawing · PDF | 8 Aug 2024 | View |
| TYPICAL ROOF DETAIL-ACCESS HATCH DETAILDrawing · PDF | 8 Aug 2024 | View |
| TYPICAL ROOF DETAIL-ROOFLIGHT DETAILDrawing · PDF | 8 Aug 2024 | View |
| SITE LOCATION PLANDrawing · PDF | 8 Aug 2024 | View |
| SALOON ROOF REPAIR POSITIONSDrawing · PDF | 8 Aug 2024 | View |
| SALOON ROOF REPAIRS - BAY ADrawing · PDF | 8 Aug 2024 | View |
| SALOON ROOF REPAIRS - BAY BDrawing · PDF | 8 Aug 2024 | View |
| SALOON ROOF REPAIRS - BAY CDrawing · PDF | 8 Aug 2024 | View |
| SALOON ROOF REPAIRS - BAY DDrawing · PDF | 8 Aug 2024 | View |
| SALOON ROOF REPAIRS - BAY EDrawing · PDF | 8 Aug 2024 | View |
| WORKMANS HEIGHTS ROOF REPAIRS - BAY ADrawing · PDF | 8 Aug 2024 | View |
| WORKMANS HEIGHTS ROOF REPAIRS - BAY BDrawing · PDF | 8 Aug 2024 | View |
| WORKMANS HEIGHTS ROOF REPAIRS - BAY CDrawing · PDF | 8 Aug 2024 | View |
| WORKMANS HEIGHTS ROOF REPAIRS - BAY DDrawing · PDF | 8 Aug 2024 | View |
| HOUSEMAID HEIGHTS ROOF REPAIR POSITIONSDrawing · PDF | 8 Aug 2024 | View |
| HOUSEMAID HEIGHTS ROOF REPAIRS - BAY ADrawing · PDF | 8 Aug 2024 | View |
| HOUSEMAID HEIGHTS ROOF REPAIRS - BAY BDrawing · PDF | 8 Aug 2024 | View |
| HOUSEMAID HEIGHTS ROOF REPAIRS - BAY CDrawing · PDF | 8 Aug 2024 | View |
| HOUSEMAID HEIGHTS ROOF REPAIRS - BAY DDrawing · PDF | 8 Aug 2024 | View |
| SALOON ROOF GUTTER ALTERATIONSDrawing · PDF | 8 Aug 2024 | View |
| WORKMANS HEIGHTS GUTTER ALTERATIONSDrawing · PDF | 8 Aug 2024 | View |
| GREAT HALL ROOF REPAIR POSITIONSDrawing · PDF | 8 Aug 2024 | View |
| GREAT HALL ROOF REPAIRS - BAY ADrawing · PDF | 8 Aug 2024 | View |
| GREAT HALL ROOF REPAIRS - BAY BDrawing · PDF | 8 Aug 2024 | View |
| GREAT HALL ROOF REPAIRS - BAY CDrawing · PDF | 8 Aug 2024 | View |
| GREAT HALL ROOF REPAIRS - BAY DDrawing · PDF | 8 Aug 2024 | View |
| PROPOSED BUTTERFLY ROOF STRUCTURE STRENGTHENINGDrawing · PDF | 8 Aug 2024 | View |
| PROPOSED BUTTERFLY CEILING STRUCTURE STRENGTHENINGDrawing · PDF | 8 Aug 2024 | View |
| GREAT HALL GUTTER ALTERATIONSDrawing · PDF | 8 Aug 2024 | View |
| GREAT HALL ROOF REPAIR SCHEDULESupporting Documents · PDF | 8 Aug 2024 | View |
| HOUSEMAIDS HEIGHTS ROOF STRUCTURE REPAIRSSupporting Documents · PDF | 8 Aug 2024 | View |
| SALOON ROOF REPAIR SCHEDULESupporting Documents · PDF | 8 Aug 2024 | View |
| STRUCTURAL REPORT FOR PLANNING AND LBCSupporting Documents · PDF | 8 Aug 2024 | View |
| WORKMAN HEIGHTS ROOF REPAIR SCHEDULESupporting Documents · PDF | 8 Aug 2024 | View |
| ROOF LEVEL - GREAT HALL STAIRCASE LIGHTING LAYOUTDrawing · PDF | 8 Aug 2024 | View |
| ROOF LEVEL - PROPOSED VODAFONE EQUIPMENT LAYOUT P01Drawing · PDF | 8 Aug 2024 | View |
| ROOF LEVEL - PROPOSED LIGHTNING PROTECTION LAYOUTDrawing · PDF | 8 Aug 2024 | View |
| ROOF LEVEL - PROPOSED TRACE HEATING LAYOUTDrawing · PDF | 8 Aug 2024 | View |
| ROOF LEVEL - GREAT HALL PROPOSED ELECTRICAL SERVICESDrawing · PDF | 8 Aug 2024 | View |
| ROOF LEVEL - STRIP-OUT WORKSDrawing · PDF | 8 Aug 2024 | View |
| FIRST AND SECOND FLOOR - FIRE ALARM CONTAINMENT SERVDrawing · PDF | 8 Aug 2024 | View |
| GROUND AND FIRST FLOOR - GREAT HALL STAIRCASE LIGHTIDrawing · PDF | 8 Aug 2024 | View |
| SECOND AND THIRD FLOOR - GREAT HALL STAIRCASE LIGHTIDrawing · PDF | 8 Aug 2024 | View |
| HEIGHTS - LIGHTING AND FIRE ALARM LAYOUT P01Drawing · PDF | 8 Aug 2024 | View |
| HEIGHTS - LIGHTING AND FIRE ALARM LAYOUT P01Drawing · PDF | 8 Aug 2024 | View |
| LBC ELECTRICAL STATEMENT OF WORKSSupporting Documents · PDF | 8 Aug 2024 | View |
| DOCUMENT REGISTER_PLANNINGDrawing · PDF | 8 Aug 2024 | View |
| BLPL.03 - BIODIVERSITY SELF ASSESSMENT FORMSupporting Documents · PDF | 8 Aug 2024 | View |
| HIGH LEVEL WORKS_DAS WITH APPENDICESDesign and Access Statement · PDF | 8 Aug 2024 | View |
| 12180 - DESIGN RATIONALE_Supporting Documents · PDF | 8 Aug 2024 | View |
| LIGHTING CONCEPT REPORTSupporting Documents · PDF | 8 Aug 2024 | View |
| PROPOSED LIGHTING LAYOUTDrawing · PDF | 8 Aug 2024 | View |
| PROPOSED LIGHTING ELEVATIONSDrawing · PDF | 8 Aug 2024 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.