Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for West Lothian. Search an address, application reference or proposal to find a record.
6,348 approved · 771 refused · 525 withdrawn. Received dates in our records: 12 Jan 2017 to 2 Oct 2026. Most recent record check: 11 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
2 Back Station Road Linlithgow West Lothian EH49 6AE
Received 8 Aug 201849A West Main Street Broxburn West Lothian EH52 5RL
Received 8 Aug 2018Polkemmet Mine Water Treatment Scheme Dixon Terrace Whitburn West Lothian EH47 0LH
Received 8 Aug 2018Cairns Farm Kirknewton West Lothian EH27 8DH
Received 8 Aug 2018119 Badger Park Broxburn West Lothian EH52 5GY
Received 10 Aug 201810 Bellsburn Avenue Linlithgow West Lothian EH49 7LB
Received 10 Aug 2018Five Sisters Business Park Westwood West Calder West Lothian EH55 8PW
Received 10 Aug 201880 Talisman Rise Dedridge Livingston West Lothian EH54 6PN
Received 10 Aug 20185 Carrick Gardens Murieston Livingston West Lothian EH54 9ET
Received 10 Aug 2018Land At Winchburgh
Received 10 Aug 201826 Academy Place Bathgate West Lothian EH48 1AS
Received 13 Aug 2018Land At East Main Street Whitburn West Lothian
Received 13 Aug 201812 Kaims Brae Livingston Village Livingston West Lothian EH54 7DT
Received 13 Aug 2018Former Bangour Village Hospital Dechmont West Lothian
Received 13 Aug 201815 Youngs Road Broxburn West Lothian EH52 5LY
Received 14 Aug 20182 Rosebank Cottages Simpson Parkway Kirkton Campus Livingston West Lothian EH54 7AN
Received 15 Aug 2018Land 50 Metres West Of 5 Shairps Business Park Houstoun Road Livingston West Lothian
Received 16 Aug 201821 Chuckethall Road Deans Livingston West Lothian EH54 8FB
Received 16 Aug 20183 Park View Fauldhouse Bathgate West Lothian EH47 9JS
Received 16 Aug 2018Hardhill Farm Sibbalds Brae Bathgate West Lothian EH48 2HL
Received 17 Aug 2018Ulva Cottage 14 Grange Road Broxburn West Lothian EH52 5HL
Received 17 Aug 20185 Houston Mains Holdings Uphall West Lothian EH52 6JU
Received 20 Aug 20181B Liggat Syke Place Broxburn West Lothian EH52 5NA
Received 20 Aug 2018Ogilvie School Campus Ogilvie Way Knightsridge Livingston West Lothian EH54 8UL
Received 20 Aug 2018Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for West Lothian, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage