Council planning record

Planning permission in principle for the proposed 3.4 ha development of general industrial (class 5), storage or distribution (class 6), petrol filling station, electric vehicle charging station, food and drink (class 3) and hot food takeaways (sui generis) and associated infrastructure (Phase 1)

Site At East Mains Industrial Estate Broxburn West Lothian

Awaiting decisionReference: 0805/P/23West Lothian

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source

Application summary

Status
Awaiting decision
Application type
Planning Permission in Principle
Received
21 Sept 2023
Validated
11 Oct 2023
Determination deadline
Not published
Local authority
West Lothian

Application overview

Planning permission in principle for the proposed 3.4 ha development of general industrial (class 5), storage or distribution (class 6), petrol filling station, electric vehicle charging station, food and drink (class 3) and hot food takeaways (sui generis) and associated infrastructure (Phase 1)

Proposal details

Reference
0805/P/23
Alternative references
100640140-001
Ward
Broxburn, Uphall & Winchburgh
Agent
HolderPlanning Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Site At East Mains Industrial Estate Broxburn West Lothian

This record has no verified map location.

View council map

Documents 17 of 17

DocumentPublishedAction
FLOOD RISK ASSESSMENTReport · PDF10 Jun 2026View
APPENDIX 4 LANDSCAPE AND VISUAL IMPACT ASSESSMENT FIGURES PLANS AND VIEWPOINTS PReport · PDF29 Oct 2024View
APPENDIX 10 FLOODING AND DRAINAGEReport · PDF29 Oct 2024View
APPENDIX 10_1 DRAINAGE ASSESSMENT PHASE 1 PART 1Report · PDF29 Oct 2024View
APPENDIX 10_1 DRAINAGE ASSESSMENT PHASE 1 PART 2Report · PDF29 Oct 2024View
APPENDIX 10_2 FLOOD RISK ASSESSMENTReport · PDF29 Oct 2024View
APPENDIX 12 CONSOLIDATED SCHEDULE OF MITIGATION MEASURES PHASE 1Report · PDF29 Oct 2024View
APPENDIX 4 LANDSCAPE AND VISUAL IMPACT ASSESSMENT PHASE 1Report · PDF29 Oct 2024View
APPENDIX 5 TRAFFIC AND TRANSPORT PHASE 1Report · PDF29 Oct 2024View
APPENDIX 5_1 TRANSPORT IMPACT ASSESSMENTReport · PDF29 Oct 2024View
APPLICATION FORMApplication Form · PDF12 Oct 2023View
SUBMITTED PLANSDrawing · PDF6 Oct 2023View
ARBORICULTURE REPORT AND TREE SURVEYReport · PDF21 Sept 2023View
ARBORICULTURE REPORT APPENDIX 2 TREE SURVEY SCHEDULEReport · PDF21 Sept 2023View
ARBORICULTURE REPORT APPENDIX 3_1 TREE SURVEY AND CONSTRAINTSReport · PDF21 Sept 2023View
DESIGN AND ACCESS STATEMENTReport · PDF21 Sept 2023View
SUPPORTING LETTER 190923Other · PDF21 Sept 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published

Appeal status: Blank Field · Blank Field

Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.