Status on council recordCouncil status: Unknown

Notification under Regulation 5 of the Electronic Communications Code (Conditions and Restrictions) Regulations 2003 (as amended) to utilise permitted development rights (Part 16 of Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). Removal of existing Valmont 18 Metre high phase 8 monopole supporting H3G equipment and replacement with a 20 Metre high phase 7.3 pole supporting H3G and VMO2 equipment, removal and replacement of wraparound cabinet, installation of half bowler cabinet, existing H3G 6130 cabinet to be retained and enhanced, existing bowler cabinet to be upgraded internally, internal cabinet works and associated ancillary works. To take place at SW Link Road, Newbury, RG14 7LT.

Street Record Link Road Newbury

West Berkshire CouncilReference 26/02584/TELE28Telecommunication Development (28 days)

Status and dates

Last published check: 25 Nov 2026, 13:15 (UK)

  1. DoneReceived25 Nov 2026
  2. DoneValidated25 Nov 2026
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date22 Dec 2026
  5. DecidedCase Closed25 Nov 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Decision Issued Date

    Published milestoneCouncil source
  2. Application Received Date

    Published milestoneCouncil source
  3. Application Validated Date

    Published milestoneCouncil source
  4. Determination Deadline

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Telecommunication Development (28 days)
Ward
Newbury Central
Parish
Newbury Town Council
Documents
9 published

Proposal

Notification under Regulation 5 of the Electronic Communications Code (Conditions and Restrictions) Regulations 2003 (as amended) to utilise permitted development rights (Part 16 of Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). Removal of existing Valmont 18 Metre high phase 8 monopole supporting H3G equipment and replacement with a 20 Metre high phase 7.3 pole supporting H3G and VMO2 equipment, removal and replacement of wraparound cabinet, installation of half bowler cabinet, existing H3G 6130 cabinet to be retained and enhanced, existing bowler cabinet to be upgraded internally, internal cabinet works and associated ancillary works. To take place at SW Link Road, Newbury, RG14 7LT.

Reference
26/02584/TELE28
Ward
Newbury Central
Parish
Newbury Town Council
Agent
WHP Telecoms Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Regulation 5 NotificationSupporting Document25 Nov 2026View
  • All PlansPlans, Drawings25 Nov 2026View
  • Location PlanPlans, Drawings25 Nov 2026View
  • Existing Site PlanPlans, Drawings25 Nov 2026View
  • Proposed Site PlanPlans, Drawings25 Nov 2026View
  • Proposed ElevationPlans, Drawings25 Nov 2026View
  • Existing ElevationPlans, Drawings25 Nov 2026View
  • Proposed Antenna and Support Structure PlanPlans, Drawings25 Nov 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Case Closed
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.