Notification under Regulation 5 of the Electronic Communications Code (Conditions and Restrictions) Regulations 2003 (as amended) to utilise permitted development rights (Part 16 of Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). Removal of existing Valmont 18 Metre high phase 8 monopole supporting H3G equipment and replacement with a 20 Metre high phase 7.3 pole supporting H3G and VMO2 equipment, removal and replacement of wraparound cabinet, installation of half bowler cabinet, existing H3G 6130 cabinet to be retained and enhanced, existing bowler cabinet to be upgraded internally, internal cabinet works and associated ancillary works. To take place at SW Link Road, Newbury, RG14 7LT.
Notification under Regulation 5 of the Electronic Communications Code (Conditions and Restrictions) Regulations 2003 (as amended) to utilise permitted development rights (Part 16 of Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). Removal of existing Valmont 18 Metre high phase 8 monopole supporting H3G equipment and replacement with a 20 Metre high phase 7.3 pole supporting H3G and VMO2 equipment, removal and replacement of wraparound cabinet, installation of half bowler cabinet, existing H3G 6130 cabinet to be retained and enhanced, existing bowler cabinet to be upgraded internally, internal cabinet works and associated ancillary works. To take place at SW Link Road, Newbury, RG14 7LT.
Reference
26/02584/TELE28
Ward
Newbury Central
Parish
Newbury Town Council
Agent
WHP Telecoms Ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.