Council planning record

Application for Approval of Details Reserved by Condition 13 'Ground Levels and Finished Floor Levels', 14 'Construction Method Statement (Highway)', 16 'Electric Charging Points', 22 'Scheme for the protection from external traffic and commercial noise', 30 'Cycle Storage', 31 (part) 'Contaminated Land', 32 'Vehicle Parking', 34 'External Materials', 38 'Construction Environmental Management Plan (CEMP)' and 53 'Construction Method Statement (Environmental Health)' of planning permission 22/02754/OUTMAJ - Hybrid Planning Application: 1) Full planning permission for a food store with a floor area of 1800 square metres (Use Class E(a)) together with drainage, parking and associated access, infrastructure, and landscaping. 2) Outline planning permission (matters to be considered: access) for up to 75 residential units (Use Class C3) high-capacity Electric Vehicle (EV) charging area, and residential care accommodation, containing up to 70 beds (Use Class C2), together with open space, play space, drainage, parking and associated access, infrastructure, landscape, bund on the eastern boundary with the A339, ancillary and site preparation works.

Land East Of Newbury College Monks Lane Newbury

Awaiting decisionReference: 26/01386/CONDWest Berkshire Council

Last published check: 27 Sept 2026, 18:22. Check the council record for more recent changes.

Application location

Land East Of Newbury College Monks Lane Newbury

This record has no verified map location.

View council map

Application summary

Status
Awaiting decision
Application type
Discharge/Compliance of Condition(s)
Received
25 Jun 2026
Validated
25 Jun 2026
Determination deadline
20 Aug 2026
Local authority
West Berkshire Council

Application overview

Application for Approval of Details Reserved by Condition 13 'Ground Levels and Finished Floor Levels', 14 'Construction Method Statement (Highway)', 16 'Electric Charging Points', 22 'Scheme for the protection from external traffic and commercial noise', 30 'Cycle Storage', 31 (part) 'Contaminated Land', 32 'Vehicle Parking', 34 'External Materials', 38 'Construction Environmental Management Plan (CEMP)' and 53 'Construction Method Statement (Environmental Health)' of planning permission 22/02754/OUTMAJ - Hybrid Planning Application: 1) Full planning permission for a food store with a floor area of 1800 square metres (Use Class E(a)) together with drainage, parking and associated access, infrastructure, and landscaping. 2) Outline planning permission (matters to be considered: access) for up to 75 residential units (Use Class C3) high-capacity Electric Vehicle (EV) charging area, and residential care accommodation, containing up to 70 beds (Use Class C2), together with open space, play space, drainage, parking and associated access, infrastructure, landscape, bund on the eastern boundary with the A339, ancillary and site preparation works.

Proposal details

Reference
26/01386/COND
Ward
Newbury Wash Common
Parish
Greenham Parish Council
Agent
Feltham Properties

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 19 of 19

DocumentPublishedAction
Highways West Berkshire CouncilConsultee Comment · PDF13 Jul 2026View
Application Form - Without Personal DataApplication Form · PDF25 Jun 2026View
RM-09 Rev G Proposed Site PlanPlans, Drawings · PDF25 Jun 2026View
RM-10 Rev E Proposed Site SectionsPlans, Drawings · PDF25 Jun 2026View
RM-13 Rev B Proposed Cycle ShelterPlans, Drawings · PDF25 Jun 2026View
Construction Logistics & Environmental Management Plan, Version 3, June 2026Supporting Document · PDF25 Jun 2026View
Rolec BASICCHARGE:EV OPENCHARGE technical data sheetSupporting Document · PDF25 Jun 2026View
Gas Protection Technical Note, 15 June 2026Supporting Document · PDF25 Jun 2026View
Ground Investigation, Rev 3, 2 September 2025 (Part 1)Supporting Document · PDF25 Jun 2026View
Ground Investigation, Rev 3, 2 September 2025 (Part 2)Supporting Document · PDF25 Jun 2026View
Ground Investigation, Rev 3, 2 September 2025 (Part 3)Supporting Document · PDF25 Jun 2026View
Ground Investigation, Rev 3, 2 September 2025 (Part 4)Supporting Document · PDF25 Jun 2026View
Ground Investigation, Rev 3, 2 September 2025 (Part 5)Supporting Document · PDF25 Jun 2026View
Ground Investigation, Rev 3, 2 September 2025 (Part 6)Supporting Document · PDF25 Jun 2026View
Ground Investigation, Rev 3, 2 September 2025 (Part 7)Supporting Document · PDF25 Jun 2026View
Noise Assessment Technical Note, 8 April 2026Supporting Document · PDF25 Jun 2026View
RM-07 Rev E Proposed ElevationsPlans, Drawings · PDF25 Jun 2026View
RM-08 Rev E Proposed ElevationsPlans, Drawings · PDF25 Jun 2026View
Covering letterSupporting Document · PDF25 Jun 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.