Council planning record

Installation of 22 solar photovoltaic (PV) panels on the existing pitched roof slopes of the dwellinghouse, as follows: 12 panels (Aiko Energy AIKO-A490-MCE54Db, 490W each) on the west-facing roof slope (azimuth 260 degrees, slope 45 degrees); and 10 panels (same model) on the east-facing roof slope (azimuth 81 degrees, slope 45 degrees). Total system capacity 10.78kWp. Mounting system: Clenergy SolarPro tile interface with self-drilling fixings into existing roof structure. Associated works: installation of one Tesla Powerwall 3.0 (11.04kW) inverter and one Tesla Powerwall 3 battery (13.5kWh) internally within the dwelling. No new access, street, hardstanding, means of enclosure or drainage works are proposed. No new floor space is created. Panel positions are shown on the accompanying roof plan and elevations.

Old Cobbles Pinchington Lane Greenham Thatcham RG19 8SR

DecidedReference: 26/01175/CERTPWest Berkshire Council

Last published check: 28 Sept 2026, 00:03. Check the council record for more recent changes.

Application location

Old Cobbles Pinchington Lane Greenham Thatcham RG19 8SR

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Certificate of Lawfulness (Proposed)
Received
1 Jun 2026
Validated
5 Jun 2026
Determination deadline
31 Jul 2026
Local authority
West Berkshire Council

Application overview

Installation of 22 solar photovoltaic (PV) panels on the existing pitched roof slopes of the dwellinghouse, as follows: 12 panels (Aiko Energy AIKO-A490-MCE54Db, 490W each) on the west-facing roof slope (azimuth 260 degrees, slope 45 degrees); and 10 panels (same model) on the east-facing roof slope (azimuth 81 degrees, slope 45 degrees). Total system capacity 10.78kWp. Mounting system: Clenergy SolarPro tile interface with self-drilling fixings into existing roof structure. Associated works: installation of one Tesla Powerwall 3.0 (11.04kW) inverter and one Tesla Powerwall 3 battery (13.5kWh) internally within the dwelling. No new access, street, hardstanding, means of enclosure or drainage works are proposed. No new floor space is created. Panel positions are shown on the accompanying roof plan and elevations.

Proposal details

Reference
26/01175/CERTP
Ward
Newbury Greenham
Parish
Greenham Parish Council

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 8 of 8

DocumentPublishedAction
APPROVEDDecision Notice · PDF3 Aug 2026View
REPORTDelegated Report · PDF3 Aug 2026View
Proposed Roof PhotoPhoto · PDF4 Jun 2026View
Location PlanDCPLANL - Location Plan · PDF4 Jun 2026View
Application Form - Without Personal DataApplication Form · PDF1 Jun 2026View
Existing Photo taken form frontPhoto1 Jun 2026View
Existing Photo taken from sidePhoto1 Jun 2026View
ACJ Solar Energy System DetailsApplication Correspondence · PDF1 Jun 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source

Decision & conditions

Approval
APPROVED
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.