REG 3 - Application to determine if prior approval is required for a proposed: West Berkshire Council ("the Council") intends to install rooftop solar energy generation panels on selected buildings within the footprint of the Council's Padworth Integrated Waste Management Facility. The facility is currently run by Veolia Environment Services as part of a 25-year waste PFI contract, which commenced in 2008. The installation works will be completed by a suitably qualified and experienced contractor appointed following a competitive tender process. The rooftop installations are expected to generate c. 900kWp of renewable energy.
REG 3 - Application to determine if prior approval is required for a proposed: West Berkshire Council ("the Council") intends to install rooftop solar energy generation panels on selected buildings within the footprint of the Council's Padworth Integrated Waste Management Facility. The facility is currently run by Veolia Environment Services as part of a 25-year waste PFI contract, which commenced in 2008. The installation works will be completed by a suitably qualified and experienced contractor appointed following a competitive tender process. The rooftop installations are expected to generate c. 900kWp of renewable energy.
Reference
26/00550/PASOL
Ward
Aldermaston
Parish
Padworth Parish Council
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.