Council planning record

Carefully remove, clean and set aside roof and ridge tiles for reuse. Dismantle and dispose of timber roof structure including first-floor ceiling joists and floorboards. Carefully remove, inspect and set aside window frames if they are suitable for reuse. Install new timber roof structure including ceiling joists (as per Structural Engineer's Design) to existing size and profile. Install new timber floorboards. Install new or refit existing window frames as per existing material, style and dimensions. Install new sarking felt, roofing battens and existing roof tiles (supplementing with reclaimed where there is a shortfall). Install new glass fibre rafter insulation.

Unit 6 Amners Farm Burghfield Reading RG30 3UE

DecidedReference: 26/00184/CERTLBWest Berkshire Council

Last published check: 28 Sept 2026, 13:46. Check the council record for more recent changes.

Application location

Unit 6 Amners Farm Burghfield Reading RG30 3UE

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Certificate of Lawfulness (Proposed LB)
Received
28 Jan 2026
Validated
25 Feb 2026
Determination deadline
8 Apr 2026
Local authority
West Berkshire Council

Application overview

Carefully remove, clean and set aside roof and ridge tiles for reuse. Dismantle and dispose of timber roof structure including first-floor ceiling joists and floorboards. Carefully remove, inspect and set aside window frames if they are suitable for reuse. Install new timber roof structure including ceiling joists (as per Structural Engineer's Design) to existing size and profile. Install new timber floorboards. Install new or refit existing window frames as per existing material, style and dimensions. Install new sarking felt, roofing battens and existing roof tiles (supplementing with reclaimed where there is a shortfall). Install new glass fibre rafter insulation.

Proposal details

Reference
26/00184/CERTLB
Ward
Burghfield & Mortimer
Parish
Burghfield Parish Council
Agent
Crawford and Company

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 13 of 13

DocumentPublishedAction
REPORTDelegated Report · PDF8 Apr 2026View
APPROVEDDecision Notice · PDF8 Apr 2026View
Existing Layout & ElevationsPlans, Drawings · PDF25 Feb 2026View
Proposed Roof DetailsPlans, Drawings · PDF25 Feb 2026View
Location PlanPlans, Drawings · PDF25 Feb 2026View
Application FormApplication Form · PDF28 Jan 2026View
Design, Access & Heritage StatementSupporting Document · PDF28 Jan 2026View
Block PlanPlans, Drawings · PDF28 Jan 2026View
Existing & Proposed ElevationsPlans, Drawings · PDF28 Jan 2026View
Existing & Proposed Roof PlanPlans, Drawings · PDF28 Jan 2026View
Site PhotosPhoto · PDF28 Jan 2026View
Existing Roof Details with DimensionsPlans, Drawings · PDF28 Jan 2026View
88/33506/ADD (133506) Decision NoticeSupporting Document · PDF28 Jan 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Issued Date

    Published milestoneCouncil source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approval
APPROVED 88/33506/ADD (133506) Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.