WithdrawnCouncil status: Application Withdrawn

THE PROPOSAL SEEKS TO REMOVE PLASTERBOARD, CEMENT-BASED PLASTERS, LOCALISED TANKING-TYPE REPAIRS, AND MULTIPLE LAYERS OF NON-PERMEABLE ACRYLIC OR VINYL PAINT FINISHES APPLIED TO INTERNAL WALL SURFACES AND CEILINGS. REPLACE THESE WITH A COMBINATION OF HEMSPAN BOARD, LIME PLASTER AND MINERAL PAINT, RESTORING VAPOUR OPEN AND HYGROSCOPIC SYSTEM, PREVENTING FURTHER DAMAGE TO THE HISTORIC FABRIC OF THE BUILDING.

NORTH CLAYS FARM, BUTCHERFIELD LANE, HARTFIELD, TN7 4LB

Wealden District CouncilReference WD/2026/1025/LBListed Building Consent

Last published check: 9 Nov 2026, 07:56. Check the council record for more recent changes.

Status and dates

Last published check: 9 Nov 2026, 07:56 (UK)

  1. DoneReceived20 May 2026
  2. DoneValidated20 May 2026
  3. ClosedConsultationEnded 3 Jul 2026
  4. Date set by councilTarget decision date31 Jul 2026
  5. ClosedWithdrawnApplication Withdrawn

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (9)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Valid Date

    Published milestoneCouncil source
  3. Consultation Start Date

    Published milestoneCouncil source
  4. Site Notice Date

    Published milestoneCouncil source
  5. Consultation End

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Advert Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Target Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Committee/Delegated

    Published milestoneCouncil source
  9. Decision Date

    Published milestoneCouncil source
Application type
Listed Building Consent
Ward
Hartfield
Parish
Hartfield
Documents
28 published

Proposal

THE PROPOSAL SEEKS TO REMOVE PLASTERBOARD, CEMENT-BASED PLASTERS, LOCALISED TANKING-TYPE REPAIRS, AND MULTIPLE LAYERS OF NON-PERMEABLE ACRYLIC OR VINYL PAINT FINISHES APPLIED TO INTERNAL WALL SURFACES AND CEILINGS. REPLACE THESE WITH A COMBINATION OF HEMSPAN BOARD, LIME PLASTER AND MINERAL PAINT, RESTORING VAPOUR OPEN AND HYGROSCOPIC SYSTEM, PREVENTING FURTHER DAMAGE TO THE HISTORIC FABRIC OF THE BUILDING.

Reference
WD/2026/1025/LB
Ward
Hartfield
Parish
Hartfield
Agent
Mr Malte Rosenfeld

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • -Application Form20 May 2026View
  • Elevations & Section As ExistingElevations20 May 2026View
  • Ground Floor As ExistingFloor Layout20 May 2026View
  • First FloorFloor Layout20 May 2026View
  • Ground Floor As ExistingFloor Layout20 May 2026View
  • First Floor As ExistingFloor Layout20 May 2026View
  • Cross Section Ground FloorSections20 May 2026View
  • Cross Section Ground Floor 2Sections20 May 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Withdrawn
-
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.