Council planning record

INSTALLATION OF SOLAR PV PANELS ONTO BOTH THE SOUTH-EAST AND NORTH-WEST FACING PITCHES OF AN EXISTING CORRUGATED CEMENT BOARD BARN ROOF. INSTALLATION LIKELY TO BE IMPLEMENTED IN 2 PHASES, STARTING WITH 50KW ON THE SOUTH-EAST PITCH IN SUMMER 2025, THEN A FURTHER 30KW ON THE NORTH-WEST PITCH IN 2026. THE SOLAR PV SYSTEM WILL BE ENHANCED WITH 10KWH OF BATTERY STORAGE; BATTERY STORAGE AND ELECTRICAL EQUIPMENT TO BE PARTLY HOUSED INSIDE THE EXISTING BARN STRUCTURE AND PARTLY ON THE WALL OF THE EXISTING BARN

BARN ADJACENT TO FLEUR COTTAGE, OWLETTS FARM, ASHURST WOOD, RH19 3SL

Decision IssuedReference: WD/2025/0603/P12Wealden District Council

Last published check: 30 Sept 2026, 13:42. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Valid Date

    Published milestoneCouncil source
  3. Consultation Start Date

    Published milestoneCouncil source
  4. Site Notice Date

    Published milestoneCouncil source
  5. Consultation End

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Date

    Published milestoneCouncil source
  7. Target Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Committee/Delegated

    Published milestoneCouncil source

Application summary

Status
Decision Issued
Application type
PD for installation, alteration or replacement of Solar Photovoltaics on Non-domestic buildings
Received
10 Mar 2025
Validated
11 Mar 2025
Determination deadline
6 May 2025
Local authority
Wealden District Council

Application overview

INSTALLATION OF SOLAR PV PANELS ONTO BOTH THE SOUTH-EAST AND NORTH-WEST FACING PITCHES OF AN EXISTING CORRUGATED CEMENT BOARD BARN ROOF. INSTALLATION LIKELY TO BE IMPLEMENTED IN 2 PHASES, STARTING WITH 50KW ON THE SOUTH-EAST PITCH IN SUMMER 2025, THEN A FURTHER 30KW ON THE NORTH-WEST PITCH IN 2026. THE SOLAR PV SYSTEM WILL BE ENHANCED WITH 10KWH OF BATTERY STORAGE; BATTERY STORAGE AND ELECTRICAL EQUIPMENT TO BE PARTLY HOUSED INSIDE THE EXISTING BARN STRUCTURE AND PARTLY ON THE WALL OF THE EXISTING BARN

Proposal details

Reference
WD/2025/0603/P12
Ward
Hartfield
Parish
Forest Row
Agent
Owletts Farm Partnership

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

BARN ADJACENT TO FLEUR COTTAGE, OWLETTS FARM, ASHURST WOOD, RH19 3SL

This record has no verified map location.

Documents 8 of 8

DocumentPublishedAction
-Application Form10 Mar 2025View
Existing & Proposed Plans & Elevations - 2023/125 02General Plan10 Mar 2025View
2023/125 01Site and Block Plan10 Mar 2025View
Parish CouncilConsultee Response1 Apr 2025View
Land adj.Planning History11 Mar 2025View
-Planning History24 Mar 2025View
-Decision Notice6 May 2025View
DelegatedOfficer Report6 May 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Prior Approval Not Required
-
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.