Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
GROOMBRIDGE PLACE, GROOMBRIDGE HILL, GROOMBRIDGE, TUNBRIDGE WELLS, TN3 9QG
Last published check: 14 Oct 2026, 01:09. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceCHANGE OF USE OF GROOMBRIDGE PLACE AND ASSOCIATED BUILDINGS TO A HOTEL, RESTAURANT AND SPA; CONSTRUCTION OF A YOGA PAVILION, VINEYARD RESTAURANT AND ASSOCIATED STORE, GUEST ROOM HUTS, SAUNA HUTS AND A HYDRO POOL; CONSTRUCTION OF EXTENSIONS TO THE GREAT BARN AND COURTYARD STABLES AND A COVERED WALKWAY BETWEEN THESE BUILDINGS; RELOCATION OF THE OWL AND RAPTOR CENTRE; CONSTRUCTION OF CAR PARKING, FOOTPATHS, SUBSTATIONS, DRAINAGE INFRASTRUCTURE, PLANT STORES/DECKS AND A BIN STORE, A BOARDWALK AND JETTY; ERECTION OF POLYTUNNELS, A GLASSHOUSE AND COMPOST BAYS; LANDSCAPING; AND OTHER ANCILLARY DEVELOPMENT (ACCESS ONLY WITHIN WEALDEN DISTRICT).
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsGROOMBRIDGE PLACE, GROOMBRIDGE HILL, GROOMBRIDGE, TUNBRIDGE WELLS, TN3 9QG
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| -Application Form | 18 Nov 2024 | View |
| Existing Site Plan 1 of 3 - 1005 Rev CBlock Plan | 18 Nov 2024 | View |
| Existing Site Plan 2 of 3 - 1006 Rev BBlock Plan | 18 Nov 2024 | View |
| Existing Site Plan 3 of 3 - 1007 Rev BBlock Plan | 18 Nov 2024 | View |
| Proposed Site Plan 1 of 3 - 1010 Rev EBlock Plan | 18 Nov 2024 | View |
| Proposed Site Plan 3 of 3 - 1012 Rev DBlock Plan | 18 Nov 2024 | View |
| Proposed Site Plan 2 of 3 - 1011 Rev DBlock Plan | 26 Nov 2024 | View |
| Main House Existing Elevations 1-3 - 3001 Rev AElevations | 18 Nov 2024 | View |
| Main House Existing Elevations 4 - 3002 Rev AElevations | 18 Nov 2024 | View |
| Main House Existing Elevations 5-7 - 3003 Rev AElevations | 18 Nov 2024 | View |
| Main House Existing Elevations 8-9 - 3004 Rev AElevations | 18 Nov 2024 | View |
| Main House Existing Elevations 10-12 - 3005 Rev AElevations | 18 Nov 2024 | View |
| Main House Existing Elevations 13 - 3006 Rev BElevations | 18 Nov 2024 | View |
| Existing Elevations 1-2 Moat Cottage + Courtyard Buildings - 3010 Rev AElevations | 18 Nov 2024 | View |
| Existing Elevations 3 Moat Cottage + Courtyard Buildings - 3011 Rev AElevations | 18 Nov 2024 | View |
| Existing Elevations 4 Moat Cottage + Courtyard Buildings - 3012 Rev AElevations | 18 Nov 2024 | View |
| Existing Elevations 5 Moat Cottage + Courtyard Buildings - 3013 Rev AElevations | 18 Nov 2024 | View |
| Priests Cottage Existing Elevations - 3016 Rev AElevations | 18 Nov 2024 | View |
| Mill Cottage Existing Elevations 1-2 - 3018 Rev AElevations | 18 Nov 2024 | View |
| Mill Cottage Existing Elevations 3-4 - 3019 Rev AElevations | 18 Nov 2024 | View |
| Mill Cottage Existing Elevations 5-8 - 3020 Rev AElevations | 18 Nov 2024 | View |
| Ivy Cottage Existing Elevations - 3030 Rev AElevations | 18 Nov 2024 | View |
| Squash Court Existing Elevations 1-2 - 3032 Rev AElevations | 18 Nov 2024 | View |
| Squash Court Existing Elevations 3-4 - 3033 Rev AElevations | 18 Nov 2024 | View |
| Conan Doyle Room Combined Elevations - 3039Elevations | 18 Nov 2024 | View |
| Tea Rooms Existing Elevations 1 & 2 - 3040 Rev AElevations | 18 Nov 2024 | View |
| Tea Rooms Existing Elevations 3 & 4 - 3041 Rev AElevations | 18 Nov 2024 | View |
| Tea Rooms Existing Elevations 5 & 6 - 3042 Rev AElevations | 18 Nov 2024 | View |
| Tea Rooms Existing Shelters Elevations - 3045Elevations | 18 Nov 2024 | View |
| Old Shop Existing Elevations 1 & 2 - 3050 Rev AElevations | 18 Nov 2024 | View |
| Old Shop Existing Elevations 3 & 4 - 3051 Rev AElevations | 18 Nov 2024 | View |
| Main Barn Existing Elevations 1 - 3060 Rev AElevations | 18 Nov 2024 | View |
| Main Barn Existing Elevations 2-3 - 3061 Rev AElevations | 18 Nov 2024 | View |
| Main Barn Existing Elevations 4 - 3062 Rev AElevations | 18 Nov 2024 | View |
| Main Barn Existing Elevations 5 - 3063 Rev BElevations | 18 Nov 2024 | View |
| Stables Existing Elevations 1 & 2 - 3070 Rev AElevations | 18 Nov 2024 | View |
| Stables Existing Elevations 3-6 - 3071 Rev AElevations | 18 Nov 2024 | View |
| Peacocks Barn Existing Elevations 1-3 - 3080 Rev AElevations | 18 Nov 2024 | View |
| Peacocks Barn Existing Elevations 4 - 3081 Rev AElevations | 18 Nov 2024 | View |
| Main House Proposed Elevations 1-3 - 3101 Rev AElevations | 18 Nov 2024 | View |
| Main House Proposed Elevations 4 - 3102 Rev AElevations | 18 Nov 2024 | View |
| Main House Proposed Elevations 5-7 - 3103 Rev AElevations | 18 Nov 2024 | View |
| Main House Proposed Elevations 8-9 - 3104 Rev AElevations | 18 Nov 2024 | View |
| Main House Proposed Elevations 10-12 - 3105 Rev AElevations | 18 Nov 2024 | View |
| Main House Proposed Elevations 13 - 3106 Rev BElevations | 18 Nov 2024 | View |
| Proposed Elevations 1-2 Moat Cottage + Courtyard Buildings - 3110 Rev AElevations | 18 Nov 2024 | View |
| Proposed Elevations 3 Moat Cottage + Courtyard Buildings - 3111 Rev AElevations | 18 Nov 2024 | View |
| Proposed Elevations 4 Moat Cottage + Courtyard Buildings - 3112 Rev AElevations | 18 Nov 2024 | View |
| Proposed Elevations 5 Moat Cottage + Courtyard Buildings - 3113 Rev AElevations | 18 Nov 2024 | View |
| Priests Cottage Proposed Elevations - 3116 Rev AElevations | 18 Nov 2024 | View |
| Mill Cottage Proposed Elevations 1-2 - 3118 Rev AElevations | 18 Nov 2024 | View |
| Mill Cottage Proposed Elevations 3-4 - 3119 Rev AElevations | 18 Nov 2024 | View |
| Mill Cottage Proposed Elevations 5-8 - 3120 Rev AElevations | 18 Nov 2024 | View |
| Ivy Cottage Proposed Elevations 1-2 - 3130 Rev AElevations | 18 Nov 2024 | View |
| Ivy Cottage Proposed Elevations 3-4 - 3131 Rev AElevations | 18 Nov 2024 | View |
| Squash Court Proposed Elevations 1-2 - 3132 Rev AElevations | 18 Nov 2024 | View |
| Squash Court Proposed Elevations 3-4 - 3133 Rev AElevations | 18 Nov 2024 | View |
| Tea Rooms Proposed Elevations 1-2 - 3140 Rev AElevations | 18 Nov 2024 | View |
| Tea Rooms Proposed Elevations 3-4 - 3141 Rev AElevations | 18 Nov 2024 | View |
| Tea Rooms Proposed Elevations 5-6 - 3142 Rev AElevations | 18 Nov 2024 | View |
| Tea Rooms Hut Proposed Elevations - 3145 Rev AElevations | 18 Nov 2024 | View |
| Old Shop Proposed Elevations 1-2 - 3150 Rev AElevations | 18 Nov 2024 | View |
| Old Shop Proposed Elevations 3-4 - 3151 Rev AElevations | 18 Nov 2024 | View |
| Main Barn Proposed Elevations 1 - 3160 Rev AElevations | 18 Nov 2024 | View |
| Main Barn Proposed Elevations 2-3 - 3161 Rev AElevations | 18 Nov 2024 | View |
| Main Barn Proposed Elevations 4 - 3162 Rev AElevations | 18 Nov 2024 | View |
| Main Barn Proposed Elevations 5 - 3163 Rev AElevations | 18 Nov 2024 | View |
| Stables Proposed Elevations 1-2 - 3170 Rev AElevations | 18 Nov 2024 | View |
| Stables Proposed Elevations 3-6 - 3171 Rev AElevations | 18 Nov 2024 | View |
| Peacocks Barn Proposed Elevations 1-3 - 3180 Rev AElevations | 18 Nov 2024 | View |
| Peacocks Barn Proposed Elevations 4 - 3181 Rev AElevations | 18 Nov 2024 | View |
| Maintenance Store Existing Elevations - 3190 Rev AElevations | 18 Nov 2024 | View |
| Maintenance Store Proposed Elevations - 3191 Rev AElevations | 18 Nov 2024 | View |
| Proposed Elevations 1-3 Walled Garden Huts - 3200 Rev AElevations | 18 Nov 2024 | View |
| Proposed Elevations 4-5 Walled Garden Huts - 3201 Rev AElevations | 18 Nov 2024 | View |
| Proposed Elevations 6-7 Walled Garden Huts - 3202 Rev AElevations | 18 Nov 2024 | View |
| Vineyard Restaurant Proposed Elevations - 3235 Rev AElevations | 18 Nov 2024 | View |
| Yoga Pavilion Proposed Elevations - 3245 Rev AElevations | 18 Nov 2024 | View |
| Proposed Elevations Owl + Raptor Centre - 3250 Rev AElevations | 18 Nov 2024 | View |
| Main House Existing Basement Plans - 2000 Rev AFloor Layout | 18 Nov 2024 | View |
| Main House Existing Ground Floor Plan - 2001 Rev AFloor Layout | 18 Nov 2024 | View |
| Main House Existing First Floor Plan - 2002 Rev AFloor Layout | 18 Nov 2024 | View |
| Main House Existing Second Floor Plan - 2003 Rev AFloor Layout | 18 Nov 2024 | View |
| Main House Proposed Basement Plans - 2005 Rev AFloor Layout | 18 Nov 2024 | View |
| Main House Proposed Ground Floor Plan - 2006 Rev AFloor Layout | 18 Nov 2024 | View |
| Main House Proposed First Floor Plan - 2007 Rev AFloor Layout | 18 Nov 2024 | View |
| Main House Proposed Second Floor Plan - 2008 Rev AFloor Layout | 18 Nov 2024 | View |
| Existing Ground Floor Plan Moat Cottage + Courtyard Buildings - 2010 Rev AFloor Layout | 18 Nov 2024 | View |
| Existing First Floor Plan Moat Cottage + Courtyard Buildings - 2011 Rev AFloor Layout | 18 Nov 2024 | View |
| Proposed Ground Floor Plan Moat Cottage + Courtyard Buildings - 2013 Rev AFloor Layout | 18 Nov 2024 | View |
| Proposed First Floor Plan Moat Cottage + Courtyard Buildings - 2014 Rev AFloor Layout | 18 Nov 2024 | View |
| Priests Cottage Existing Plans - 2016 Rev AFloor Layout | 18 Nov 2024 | View |
| Priests Cottage Proposed Plans - 2017 Rev AFloor Layout | 18 Nov 2024 | View |
| Mill Cottage Existing Ground Floor Plan - 2018 Rev AFloor Layout | 18 Nov 2024 | View |
| Mill Cottage Existing First Floor Plan - 2019 Rev AFloor Layout | 18 Nov 2024 | View |
| Mill Cottage Existing Second Floor Plan - 2020 Rev AFloor Layout | 18 Nov 2024 | View |
| Mill Cottage & Garage Proposed Ground Floor Plan - 2022 Rev AFloor Layout | 18 Nov 2024 | View |
| Mill Cottage Proposed First Floor Plan - 2023 Rev AFloor Layout | 18 Nov 2024 | View |
| Mill Cottage Proposed Second Floor Plan - 2024 Rev AFloor Layout | 18 Nov 2024 | View |
| Ivy Cottage Existing Plans - 2030 Rev AFloor Layout | 18 Nov 2024 | View |
| Ivy Cottage Proposed Plans - 2031 Rev AFloor Layout | 18 Nov 2024 | View |
| Tea Rooms Existing Floor Plan - 2040 Rev AFloor Layout | 18 Nov 2024 | View |
| Tea Rooms Proposed Floor Plan - 2042 Rev AFloor Layout | 18 Nov 2024 | View |
| Main Barn Existing Floor Plan - 2060 Rev BFloor Layout | 18 Nov 2024 | View |
| Main Barn Proposed Plans - 2062 Rev BFloor Layout | 18 Nov 2024 | View |
| Stables Proposed Ground Floor Plan - 2071 Rev AFloor Layout | 18 Nov 2024 | View |
| Maintenance Store Existing Ground Floor Plan - 2090 Rev AFloor Layout | 18 Nov 2024 | View |
| Maintenance Store Proposed Ground Floor Plan - 2092 Rev AFloor Layout | 18 Nov 2024 | View |
| Mill Boardwalk Proposals - 9021 Rev AGeneral Plan | 18 Nov 2024 | View |
| Covered Walkway Proposals - 9022 Rev AGeneral Plan | 18 Nov 2024 | View |
| Proposed Drainage Design 1 of 3 - 1015 Rev EGeneral Plan | 18 Nov 2024 | View |
| Proposed Drainage Design 2 of 3 - 1016 Rev DGeneral Plan | 18 Nov 2024 | View |
| Proposed Drainage Design 3 of 3 - 1017 Rev DGeneral Plan | 18 Nov 2024 | View |
| Squash Court Existing Plans - 2032 Rev AGeneral Plan | 18 Nov 2024 | View |
| Squash Court Proposed Plans - 2033 Rev AGeneral Plan | 18 Nov 2024 | View |
| Conan Doyle Room Combined Plans - 2039 Rev AGeneral Plan | 18 Nov 2024 | View |
| Tea Rooms Hut Floor Plans - 2045 Rev AGeneral Plan | 18 Nov 2024 | View |
| Old Shop Existing Plans - 2050 Rev AGeneral Plan | 18 Nov 2024 | View |
| Old Shop Proposed Plans - 2051 Rev AGeneral Plan | 18 Nov 2024 | View |
| Stables Existing Plans - 2070 Rev AGeneral Plan | 18 Nov 2024 | View |
| Peacocks Barn Existing Plans - 2080 Rev AGeneral Plan | 18 Nov 2024 | View |
| Peacocks Barn Proposed Plans - 2081 Rev AGeneral Plan | 18 Nov 2024 | View |
| Walled Garden Proposed Huts 1-3 - 2100 Rev AGeneral Plan | 18 Nov 2024 | View |
| Walled Garden Proposed Huts 4-5 - 2101 Rev AGeneral Plan | 18 Nov 2024 | View |
| Walled Garden Proposed Huts 6-7 - 2102 Rev AGeneral Plan | 18 Nov 2024 | View |
| Glasshouse Proposed Plans - 2110 Rev AGeneral Plan | 18 Nov 2024 | View |
| Plans + Elevations Proposed Canal Hut - 2115 Rev AGeneral Plan | 18 Nov 2024 | View |
| New Sauna Huts Plans + Elevations - 2120 Rev AGeneral Plan | 18 Nov 2024 | View |
| Boat House Existing - 2124 Rev AGeneral Plan | 18 Nov 2024 | View |
| Boat House Proposals - 2125 Rev AGeneral Plan | 18 Nov 2024 | View |
| Tennis Court Building Existing Plans + Elevations - 2129 Rev AGeneral Plan | 18 Nov 2024 | View |
| Tennis Court Building Proposed Plans + Elevations - 2130 Rev AGeneral Plan | 18 Nov 2024 | View |
| Outdoor Pool Proposals - 2131 Rev AGeneral Plan | 18 Nov 2024 | View |
| Proposed Plans Vineyard Restaurant - 2135 Rev AGeneral Plan | 18 Nov 2024 | View |
| Vineyard Restaurant Proposed Store - 2136 Rev AGeneral Plan | 18 Nov 2024 | View |
| Vineyard Huts Proposed Plans - 2140 Rev AGeneral Plan | 18 Nov 2024 | View |
| Existing Yoga WCs Plans & Elevations - 2143 Rev AGeneral Plan | 18 Nov 2024 | View |
| Proposed Yoga WCs + Juice Bar - 2144 Rev AGeneral Plan | 18 Nov 2024 | View |
| Yoga Pavilion Proposal - 2145 Rev AGeneral Plan | 18 Nov 2024 | View |
| Owl & Raptor Centre Proposals - 2150 Rev AGeneral Plan | 18 Nov 2024 | View |
| External Plant Proposals - 2160 Rev AGeneral Plan | 18 Nov 2024 | View |
| New Glasshouse Elevations + Section - 3210 Rev AGeneral Plan | 18 Nov 2024 | View |
| Vineyard Huts Proposed Elevations 1 - 3240 Rev AGeneral Plan | 18 Nov 2024 | View |
| New Footbridge Proposals - 9020 Rev AGeneral Plan | 18 Nov 2024 | View |
| Main House Existing Roof Plan - 2004 Rev ARoof Layout | 18 Nov 2024 | View |
| Main House Proposed Roof Plan - 2009 Rev ARoof Layout | 18 Nov 2024 | View |
| Existing Roof Plan Moat Cottage + Courtyard Buildings - 2012 Rev ARoof Layout | 18 Nov 2024 | View |
| Proposed Roof Plan Moat Cottage + Courtyard Buildings - 2015 Rev ARoof Layout | 18 Nov 2024 | View |
| Mill Cottage Existing Roof Plan - 2021 Rev ARoof Layout | 18 Nov 2024 | View |
| Mill Cottage Proposed Roof Plan - 2025 Rev ARoof Layout | 18 Nov 2024 | View |
| Tea Rooms Existing Roof Plan - 2041 Rev ARoof Layout | 18 Nov 2024 | View |
| Tea Rooms Proposed Roof Plan - 2044 Rev ARoof Layout | 18 Nov 2024 | View |
| Main Barn Existing Roof Plan - 2061 Rev ARoof Layout | 18 Nov 2024 | View |
| Main Barn Proposed Roof Plan - 2063 Rev ARoof Layout | 18 Nov 2024 | View |
| Stables Proposed Roof Plan - 2072 Rev ARoof Layout | 18 Nov 2024 | View |
| Maintenance Store Existing Roof Plan - 2091 Rev ARoof Layout | 18 Nov 2024 | View |
| Maintenance Store Proposed Roof Plan - 2093 Rev ARoof Layout | 18 Nov 2024 | View |
| Vineyard Huts Proposed Elevations 2 - 3241 Rev ASections | 18 Nov 2024 | View |
| Squash Court Existing Sections - 4032 Rev ASections | 18 Nov 2024 | View |
| Main Barn Existing Section A - 4061 Rev ASections | 18 Nov 2024 | View |
| Main Barn Existing Section BB - 4062 Rev ASections | 18 Nov 2024 | View |
| Main Barn Existing Section BB - 4063 Rev ASections | 18 Nov 2024 | View |
| Moat Cottage Section A - 4110 Rev ASections | 18 Nov 2024 | View |
| Squash Court Proposed Sections - 4132 Rev ASections | 18 Nov 2024 | View |
| Main Barn Proposed Section AA - 4161 Rev ASections | 18 Nov 2024 | View |
| Main Barn Proposed Section BB - 4162 Rev ASections | 18 Nov 2024 | View |
| Main Barn Proposed Section BB - 4163 Rev ASections | 18 Nov 2024 | View |
| Existing Overall Site Plan - 1000 Rev CSite Plan | 18 Nov 2024 | View |
| Proposed Overall Site Plan - 1001 Rev LSite Plan | 18 Nov 2024 | View |
| -Site Plan | 26 Nov 2024 | View |
| -BNG Metric | 18 Nov 2024 | View |
| -Design and Access Statement | 18 Nov 2024 | View |
| Archaeological Desk-Based Assessment & Heritage Statement (Part 1 of 7)Report | 18 Nov 2024 | View |
| Archaeological Desk-Based Assessment & Heritage Statement (Part 2 of 7)Report | 18 Nov 2024 | View |
| Archaeological Desk-Based Assessment & Heritage Statement (Part 3 of 7)Report | 18 Nov 2024 | View |
| Archaeological Desk-Based Assessment & Heritage Statement (Part 4 of 7)Report | 18 Nov 2024 | View |
| Archaeological Desk-Based Assessment & Heritage Statement (Part 5 of 7)Report | 18 Nov 2024 | View |
| Archaeological Desk-Based Assessment & Heritage Statement (Part 6 of 7)Report | 18 Nov 2024 | View |
| Archaeological Desk-Based Assessment & Heritage Statement (Part 7 of 7)Report | 18 Nov 2024 | View |
| Ecological Impact Assessment and Appendices (Part 3 of 3)Report | 18 Nov 2024 | View |
| Flood Risk Assessment (Part 1 of 3)Report | 18 Nov 2024 | View |
| Flood Risk Assessment (Part 2 of 3)Report | 18 Nov 2024 | View |
| Flood Risk Assessment (Part 3 of 3)Report | 18 Nov 2024 | View |
| Historic Landscape Management PlanReport | 18 Nov 2024 | View |
| Historic Landscape Management Plan AppendicesReport | 18 Nov 2024 | View |
| Landscape and Visual AppraisalReport | 18 Nov 2024 | View |
| Landscape and Visual Appraisal AppendicesReport | 18 Nov 2024 | View |
| Structural Survey Report (Part 1 of 2)Report | 18 Nov 2024 | View |
| Structural Survey Report (Part 2 of 2)Report | 18 Nov 2024 | View |
| Air Filtration Specification and EMAQ ReportReport | 18 Nov 2024 | View |
| Shadow Habitats Regulations AssessmentReport | 18 Nov 2024 | View |
| Tree Survey ReportReport | 18 Nov 2024 | View |
| Tree Survey Report AppendicesReport | 18 Nov 2024 | View |
| Tree Survey Sheet 1 of 2Report | 18 Nov 2024 | View |
| Tree Survey Sheet 2 of 2Report | 18 Nov 2024 | View |
| Viability AssessmentReport | 18 Nov 2024 | View |
| Drainage Strategy (with Appendices) (Part 1 of 6)Report | 18 Nov 2024 | View |
| Drainage Strategy (with Appendices) (Part 2 of 6)Report | 18 Nov 2024 | View |
| Drainage Strategy (with Appendices) (Part 3 of 6)Report | 18 Nov 2024 | View |
| Drainage Strategy (with Appendices) (Part 4 of 6)Report | 18 Nov 2024 | View |
| Drainage Strategy (with Appendices) (Part 5 of 6)Report | 18 Nov 2024 | View |
| Drainage Strategy (with Appendices) (Part 6 of 6)Report | 18 Nov 2024 | View |
| Ecological Impact Assessment & Appendices (Part 1 of 3)Report | 18 Nov 2024 | View |
| Ecological Impact Assessment & Appendices (Part 2 of 3)Report | 18 Nov 2024 | View |
| PlanningStatement | 18 Nov 2024 | View |
| SustainabilityStatement | 18 Nov 2024 | View |
| Transport Statement Part 1 of 3 (Report)Statement | 18 Nov 2024 | View |
| Transport Statement Part 2 of 3 (Drawings)Statement | 18 Nov 2024 | View |
| Transport Statement Part 3 of 3 (Appendices)Statement | 18 Nov 2024 | View |
| Parish CouncilConsultee Response | 26 Nov 2024 | View |
| Active Travel EnglandConsultee Response | 2 Dec 2024 | View |
| ESCC SUDS Flood Risk ManagementConsultee Response | 3 Dec 2024 | View |
| WDC Arboriculture and LandscapeConsultee Response | 4 Dec 2024 | View |
| NatureSpace Newt OfficerConsultee Response | 12 Dec 2024 | View |
| Parish CouncilConsultee Response | 13 Dec 2024 | View |
| The Gardens TrustConsultee Response | 13 Dec 2024 | View |
| Environment AgencyConsultee Response | 17 Dec 2024 | View |
| The Society for the Protection of Ancient BuildingsConsultee Response | 20 Dec 2024 | View |
| WDC/Rother Pollution ControlConsultee Response | 23 Dec 2024 | View |
| ESCC ArchaeologyConsultee Response | 14 Jan 2025 | View |
| Groombridge Outbuilding C - Existing Blocked DoorPhotos | 18 Nov 2024 | View |
| -Planning History | 20 Nov 2024 | View |
| Land adjPlanning History | 20 Nov 2024 | View |
| Land adjPlanning History | 20 Nov 2024 | View |
| Decision Notice_WD20242656MAJ.pdfDecision Notice | 19 May 2026 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.