Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
LAND WEST OF STATION ROAD, HAILSHAM
Last published check: 3 Oct 2026, 14:01. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceAPPLICATION FOR APPROVAL OF DETAILS RESERVED BY CONDITION 26 ATTACHED TO WD/2020/2509/MAO
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsLAND WEST OF STATION ROAD, HAILSHAM
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| -Application Form | 20 Sept 2024 | View |
| Engineering Layout Sheet 1Block Plan | 20 Sept 2024 | View |
| Proposed Surface Water Drainage Strategy (Sheet 2 of 2)Block Plan | 20 Sept 2024 | View |
| Engineering Layout Sheet 2Block Plan | 20 Sept 2024 | View |
| Engineering Layout Sheet 3Block Plan | 20 Sept 2024 | View |
| -Block Plan | 20 Sept 2024 | View |
| Proposed Surface Water Drainage Strategy (Sheet 1 of 2)Block Plan | 20 Sept 2024 | View |
| Engineering Layout Sheet 4Block Plan | 20 Sept 2024 | View |
| Engineering Layout Sheet 5Block Plan | 20 Sept 2024 | View |
| Proposed Foul Water Drainage Strategy (Sheet 1 of 2)Block Plan | 20 Sept 2024 | View |
| Proposed Foul Water Drainage Strategy (Sheet 1 of 2)Block Plan | 20 Sept 2024 | View |
| Construction DetailsGeneral Plan | 20 Sept 2024 | View |
| Adoptable Sewer DetailsGeneral Plan | 20 Sept 2024 | View |
| Flow Control Chamber & Headwall DetailsGeneral Plan | 20 Sept 2024 | View |
| Attenuation Basin SectionsGeneral Plan | 20 Sept 2024 | View |
| Longitudinal Sections Sheet 3Sections | 20 Sept 2024 | View |
| Longitudinal Sections Sheet 4Sections | 20 Sept 2024 | View |
| Longitudinal Sections Sheet 5Sections | 20 Sept 2024 | View |
| Longitudinal Sections Sheet 6Sections | 20 Sept 2024 | View |
| Longitudinal Sections Sheet 1Sections | 20 Sept 2024 | View |
| Longitudinal Sections Sheet 2Sections | 20 Sept 2024 | View |
| Masterplan LayoutSite Plan | 20 Sept 2024 | View |
| S38 Adoptable Highway LightingSite Plan | 20 Sept 2024 | View |
| Infrastructure Phasing Plan Delivery DatesAccompanying Documents (Misc) | 20 Sept 2024 | View |
| Proposed Foul Water MH & Pipe SchedulesAccompanying Documents (Misc) | 20 Sept 2024 | View |
| Storm Sewer Manhole ScheduleAccompanying Documents (Misc) | 20 Sept 2024 | View |
| Foul Sewer Manhole ScheduleAccompanying Documents (Misc) | 20 Sept 2024 | View |
| Outdoor Lighting ReportReport | 20 Sept 2024 | View |
| ESCC HighwaysConsultee Response | 15 Oct 2024 | View |
| -Planning History | 21 Sept 2024 | View |
| -Decision Notice | 19 Nov 2024 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.