Council planning record

OUTLINE PLANNING PERMISSION FOR CLASS B8 DEVELOPMENT WITH ANCILLARY OFFICE SPACE; SERVICING YARDS, VAN AND CAR PARKING AREAS; NEW VEHICULAR ACCESS FROM A22; HIGHWAY ALTERATIONS TO BAY TREE LANE TO PROVIDE VEHICULAR, CYCLE/PEDESTRIAN ACCESS; ALTERATIONS TO EXISTING PUBLIC FOOTPATH; ASSOCIATED INFRASTRUCTURE INCLUDING HIGHWAYS, FOUL AND SURFACE WATER DRAINAGE WORKS, UTILITY SERVICES AND LANDSCAPING, IN ACCORDANCE WITH THE PROVISIONS OF SUBMITTED PARAMETER PLANS.

LAND NORTH OF POLEGATE

Allocated to OfficerReference: WD/2023/0260/MEAWealden District Council

Last published check: 11 Oct 2026, 21:43. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Valid Date

    Published milestoneCouncil source
  3. Consultation Start Date

    Published milestoneCouncil source
  4. Site Notice Date

    Published milestoneCouncil source
  5. Consultation End

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Advert Expiry

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Target Decision Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Allocated to Officer
Application type
Major Application with Environmental Assessment
Received
27 Jan 2023
Validated
10 Oct 2025
Determination deadline
30 Sept 2026
Local authority
Wealden District Council

Application overview

OUTLINE PLANNING PERMISSION FOR CLASS B8 DEVELOPMENT WITH ANCILLARY OFFICE SPACE; SERVICING YARDS, VAN AND CAR PARKING AREAS; NEW VEHICULAR ACCESS FROM A22; HIGHWAY ALTERATIONS TO BAY TREE LANE TO PROVIDE VEHICULAR, CYCLE/PEDESTRIAN ACCESS; ALTERATIONS TO EXISTING PUBLIC FOOTPATH; ASSOCIATED INFRASTRUCTURE INCLUDING HIGHWAYS, FOUL AND SURFACE WATER DRAINAGE WORKS, UTILITY SERVICES AND LANDSCAPING, IN ACCORDANCE WITH THE PROVISIONS OF SUBMITTED PARAMETER PLANS.

Proposal details

Reference
WD/2023/0260/MEA
Ward
Polegate North
Parish
Polegate
Agent
Richard Brown Planning Limited

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

LAND NORTH OF POLEGATE

This record has no verified map location.

Documents 655 of 655

DocumentPublishedAction
-Application Form14 Feb 2023View
Illustrative MasterplanBlock Plan14 Feb 2023View
Illustrative Masterplan - P21-1137_DE_006_UBlock Plan17 Feb 2025View
Land Use - P21-1137_DE_101AGeneral Plan17 Feb 2025View
Access & Movement Strategy - P21-1137_DE_102AGeneral Plan17 Feb 2025View
Blue & Green Infrastructure - P21-1137_DE_103AGeneral Plan17 Feb 2025View
Building Heights - P21-1137_DE_104AGeneral Plan17 Feb 2025View
Cop Hall Roundabout Combined Mitigation Geometries 70009824-SK-028 Rev P01General Plan14 Mar 2025View
Land Use - P21-1137_DE_101DGeneral Plan1 Oct 2025View
Access & Movement Strategy - P21-1137_DE_102DGeneral Plan1 Oct 2025View
Blue & Green Infrastructure - P21-1137_DE_103DGeneral Plan1 Oct 2025View
Building Heights - P21-1137_DE_104General Plan1 Oct 2025View
Building Heights - P21-1137_DE_104General Plan1 Oct 2025View
Fig 7.8 Illustrative Landscape Masterplan - P21-1137_EN_0013_I_0001 ILMP Rev MGeneral Plan1 Oct 2025View
Fig 4.2: Site Location and Planning Designations - P21-1137_EN_0006_A_0001 PDGeneral Plan1 Oct 2025View
Fig 4.3: Topography - P21-1137_EN_0007_A_0001 TOPOGeneral Plan1 Oct 2025View
Fig 4.4A: Landscape Character (National and County) - P21-1137_EN_0008_A_0001 LCGeneral Plan1 Oct 2025View
Fig 4.4B: Landscape Character (District) - P21-1137_EN_0008_A_0002General Plan1 Oct 2025View
Fig 4.5: ZTV, Viewpoint Locations & PRoW - P21-1137_EN_0010_E_0001 ZTVGeneral Plan1 Oct 2025View
Land Use - P21-1137_DE_101DGeneral Plan1 Oct 2025View
Access and Movement Strategy - P21-1137_DE_102DGeneral Plan1 Oct 2025View
Blue & Green Infrastructure - P21-1137_DE_103DGeneral Plan1 Oct 2025View
Horizontal Illuminance (lux) - Rev P03General Plan1 Oct 2025View
Horizontal Illuminance (lux) - Rev P03General Plan1 Oct 2025View
Horizontal Illuminance (lux) - Rev P03General Plan1 Oct 2025View
Horizontal Illuminance (lux) - Rev P03General Plan1 Oct 2025View
Horizontal Illuminance (lux) - Rev P03General Plan1 Oct 2025View
Illustrative Masterplan P21-1137_DE_006_AAGeneral Plan12 May 2026View
Building Heights P21-1137_DE_104EGeneral Plan29 May 2026View
Illustrative Masterplan P21-1137_DE_006_AAGeneral Plan29 May 2026View
Land Use P21-1137_DE_101EGeneral Plan29 May 2026View
Access and Movement Strategy P21-1137_DE_102EGeneral Plan29 May 2026View
Blue and Green Infrastructure P21-1137_DE_103EGeneral Plan29 May 2026View
-Site Plan14 Feb 2023View
Ponds SurveyedSite Plan16 Aug 2024View
Appendix 1 - Site Location Plan - P21-1137_001 REV CSite Plan27 Aug 2024View
Appendix 2 - Strategic Road NetworkSite Plan27 Aug 2024View
Appendix 4 - Overview Map of All SitesSite Plan27 Aug 2024View
Site Location Plan - P21-1137_001 Rev CSite Plan17 Feb 2025View
Illustrative Masterplan - P21-1137__DE006_YSite Plan1 Oct 2025View
Site Location Plan - P21-1137_001 CSite Plan1 Oct 2025View
Fig 4.1: Site Location - P21-1137_EN_0005_A_0001 SLSite Plan1 Oct 2025View
Site Location Plan - P21-1137_001 CSite Plan1 Oct 2025View
Ecology Receptor Grids 001Site Plan1 Oct 2025View
Ecology Receptor Grids 002Site Plan1 Oct 2025View
Ecology Receptors 003Site Plan1 Oct 2025View
Human Receptor Grids 001Site Plan1 Oct 2025View
Human Receptor Grids 002Site Plan1 Oct 2025View
Human Receptor Grid 003Site Plan1 Oct 2025View
Draft Section 106 Heads of TermsAccompanying Documents (Misc)27 Jan 2023View
Biodiversity Net Gain CalculationAccompanying Documents (Misc)27 Jan 2023View
National Highways Queue Lengths Wednesday 2nd November 2022Accompanying Documents (Misc)18 Apr 2023View
Cotswold Wildlife SurveysAccompanying Documents (Misc)16 Aug 2024View
Appendix 3 - Sites listed as suitable for employmentAccompanying Documents (Misc)27 Aug 2024View
Appendix 8 - Detailed Site AssessmentsAccompanying Documents (Misc)27 Aug 2024View
Appendix 5 - Initial Site AssessmentAccompanying Documents (Misc)27 Aug 2024View
Appendix 6 - SHELAA Suitable Sites SummaryAccompanying Documents (Misc)27 Aug 2024View
Transport Heads of TermsAccompanying Documents (Misc)17 Feb 2025View
S106 Heads of TermsAccompanying Documents (Misc)17 Feb 2025View
Cop Hall Queue Lengths ValidationAccompanying Documents (Misc)14 Mar 2025View
Cop Hall Validation SummaryAccompanying Documents (Misc)14 Mar 2025View
Cop Hall Results SummaryAccompanying Documents (Misc)14 Mar 2025View
Appendix 3.1. Legislation & Planning PolicyAccompanying Documents (Misc)1 Oct 2025View
Appendix 3.2 Survey MethodologyAccompanying Documents (Misc)1 Oct 2025View
Winter Verified Views - V3D 250407 - Part 1Accompanying Documents (Misc)1 Oct 2025View
Winter Verified Views - V3D 250407 - Part 2Accompanying Documents (Misc)1 Oct 2025View
EIA Traffic FlowsAccompanying Documents (Misc)1 Oct 2025View
Response to LLFA CommentsAccompanying Documents (Misc)12 May 2026View
Tree SurveyAssessment27 Jan 2023View
-BNG Metric27 Aug 2024View
-BNG Metric17 Feb 2025View
Including Planning - Part 3Design and Access Statement27 Jan 2023View
Including Planning - Part 2Design and Access Statement27 Jan 2023View
Including Planning - Part 1Design and Access Statement27 Jan 2023View
-Design and Access Statement17 Feb 2025View
-Design and Access Statement1 Oct 2025View
Agricultural Land ClassificationReport21 Feb 2023View
Sequential TestReport27 Aug 2024View
Public Transport StrategyReport27 Aug 2024View
Modelling ProtocolReport27 Aug 2024View
Groundwater Level Monitoring ReportReport27 Aug 2024View
Appendix 10 - Economic Need AnalysisReport27 Aug 2024View
Appendix 11 - Market AssessmentReport27 Aug 2024View
Landscape and Visual Impact AssessmentReport27 Aug 2024View
Appendix 4 - Flude ReportReport27 Aug 2024View
Last Mile Traffic Survey SummaryReport27 Aug 2024View
Last Mile Trip Rate ReviewReport27 Aug 2024View
Agricultural Land ClassificationReport17 Feb 2025View
Economic Need AnalysisReport17 Feb 2025View
Foul Drainage & Utilities AssessmentReport17 Feb 2025View
Groundwater Level MonitoringReport17 Feb 2025View
Landscape & Visual Impact Assessment Addendum NoteReport17 Feb 2025View
Technical Note - Modelling ProtocolReport17 Feb 2025View
Public Transport StrategyReport17 Feb 2025View
Savills Market Assessment Update (December 2024)Report17 Feb 2025View
Savills Market Assessment Update (January 2025)Report17 Feb 2025View
Sequential TestReport17 Feb 2025View
Sequential Test Appendix 1 - Site Location PlanReport17 Feb 2025View
Sequential Test Appendix 2 - Strategic Road Network for the South EastReport17 Feb 2025View
Sequential Test Appendix 3 - Sites listed as suitable for employment in Wealden SHLAA or Eastbourne LAAReport17 Feb 2025View
Sequential Test Appendix 4 - Overview Map of All SitesReport17 Feb 2025View
Sequential Test Appendix 5 - Initial Site AssessmentReport17 Feb 2025View
Sequential Test Appendix 6 - SHELAA and LAA Site AssessmentsReport17 Feb 2025View
Sequential Test Appendix 7 - Site PhotosReport17 Feb 2025View
Sequential Test Appendix 8 - Detailed Site AssessmentsReport17 Feb 2025View
Suitability & Viability for Modern Logistics Development ReportReport17 Feb 2025View
Technical Note - Last Mile Traffic Survey SummaryReport17 Feb 2025View
Technical Note - Last Mile Trip Rate ReviewReport17 Feb 2025View
Technical Note: Alternative Peak Hour Cop Hall AssessmentReport14 Mar 2025View
ARCADY 10 - Roundabout Module 8-9 & 17-18 HrsReport14 Mar 2025View
ARCADY 10 - Roundabout Module 8-9 & 17-18 HrsReport14 Mar 2025View
ARCADY 10 - Roundabout Module 8-9 & 17-18 HrsReport14 Mar 2025View
ARCADY 10 - Roundabout Module 8-9 & 17-18 HrsReport14 Mar 2025View
ARCADY 10 - Roundabout Module 730-830 & 1615 & 1715 HrsReport14 Mar 2025View
ARCADY 10 - Roundabout Module 730-830 & 1615 & 1715 HrsReport14 Mar 2025View
ARCADY 10 - Roundabout Module 730-830 & 1615 & 1715 HrsReport14 Mar 2025View
ARCADY 10 - Roundabout Module 730-830 & 1615 & 1715 HrsReport14 Mar 2025View
2024 Protected Species Survey ReportReport1 Oct 2025View
Report on the Suitability & ViabilityReport1 Oct 2025View
BREEAM V6.1 Preassessment ReportReport1 Oct 2025View
Flood Modelling ReportReport1 Oct 2025View
Ecology ReportReport1 Oct 2025View
Heritage AddendumReport1 Oct 2025View
Lighting Impact AssessmentReport1 Oct 2025View
Market Assessment July 2025 UpdateReport1 Oct 2025View
Non-Technical SummaryReport1 Oct 2025View
Flood Risk Assessment & Indicative Surface Water Drainage StrategyReport1 Oct 2025View
Addendum to Air Quality Assessment ReportReport1 Oct 2025View
Lighting Technical Note: Access RoundaboutReport1 Oct 2025View
Flood Risk Assessment & Indicative Surface Water Drainage StrategyReport19 Nov 2025View
Flood Modelling ReportReport19 Nov 2025View
Flood Risk Assessment & Indicative Surface Water Drainage StrategyReport12 May 2026View
Flood Modelling ReportReport12 May 2026View
Appendix 13.1 Environmental Statement - Transport Assessment Part 11Statement27 Jan 2023View
Appendix 13.1 Environmental Statement - Transport Assessment Part 10Statement27 Jan 2023View
Appendix 13.1 Environmental Statement - Transport Assessment Part 1Statement27 Jan 2023View
Appendices 12.1-12.5 Environmental Statement - Noise & Vibration AppendicesStatement27 Jan 2023View
Appendix 11.1 Environmental Statement - Air Quality Technical AppendixStatement27 Jan 2023View
Appendix 10.3 Environmental Statement - Preliminary Soakaway Feasibility AssessmentStatement27 Jan 2023View
Appendix 10.2 Environmental Statement - Flood Risk Assessment Part 9Statement27 Jan 2023View
Appendix 10.2 Environmental Statement - Flood Risk Assessment Part 8Statement27 Jan 2023View
Appendix 10.2 Environmental Statement - Flood Risk Assessment Part 7Statement27 Jan 2023View
Appendix 10.2 Environmental Statement - Flood Risk Assessment Part 6Statement27 Jan 2023View
Appendix 10.2 Environmental Statement - Flood Risk Assessment Part 5Statement27 Jan 2023View
Appendix 10.2 Environmental Statement - Flood Risk Assessment Part 4Statement27 Jan 2023View
Appendix 10.2 Environmental Statement - Flood Risk Assessment Part 3Statement27 Jan 2023View
Appendix 10.2 Environmental Statement - Flood Risk Assessment Part 2Statement27 Jan 2023View
Appendix 10.2 Environmental Statement - Flood Risk Assessment Part 10Statement27 Jan 2023View
Appendix 10.2 Environmental Statement - Flood Risk Assessment Part 1Statement27 Jan 2023View
Appendix 2.1 Environmental Statement - Scoping Report Part 2Statement27 Jan 2023View
Appendix 2.1 Environmental Statement - Scoping Report Part 1Statement27 Jan 2023View
Appendix 13.6 Environmental Statement - Assessment Extent ScreeningStatement27 Jan 2023View
Appendix 13.5 Environmental Statement - Observed & Forecast Traffic FlowStatement27 Jan 2023View
Appendix 13.4 Environmental Statement - Committed DevelopmentStatement27 Jan 2023View
Appendix 13.3 Environmental Statement - Construction Traffic Management Plan Part 3Statement27 Jan 2023View
Appendix 13.3 Environmental Statement - Construction Traffic Management Plan Part 2Statement27 Jan 2023View
Appendix 13.3 Environmental Statement - Construction Traffic Management Plan Part 1Statement27 Jan 2023View
Appendix 13.2 Environmental Statement - Framework Travel Plan Part 4Statement27 Jan 2023View
Appendix 13.2 Environmental Statement - Framework Travel Plan Part 3Statement27 Jan 2023View
Appendix 13.2 Environmental Statement - Framework Travel Plan Part 2Statement27 Jan 2023View
Appendix 13.2 Environmental Statement - Framework Travel Plan Part 1Statement27 Jan 2023View
Appendix 13.1 Environmental Statement - Transport Assessment Part 9Statement27 Jan 2023View
Appendix 13.1 Environmental Statement - Transport Assessment Part 8Statement27 Jan 2023View
Appendix 13.1 Environmental Statement - Transport Assessment Part 7Statement27 Jan 2023View
Appendix 13.1 Environmental Statement - Transport Assessment Part 6Statement27 Jan 2023View
Appendix 13.1 Environmental Statement - Transport Assessment Part 5Statement27 Jan 2023View
Appendix 13.1 Environmental Statement - Transport Assessment Part 4Statement27 Jan 2023View
Appendix 13.1 Environmental Statement - Transport Assessment Part 3Statement27 Jan 2023View
Appendix 13.1 Environmental Statement - Transport Assessment Part 20Statement27 Jan 2023View
Appendix 13.1 Environmental Statement - Transport Assessment Part 2Statement27 Jan 2023View
Appendix 13.1 Environmental Statement - Transport Assessment Part 19Statement27 Jan 2023View
Appendix 13.1 Environmental Statement - Transport Assessment Part 18Statement27 Jan 2023View
Appendix 13.1 Environmental Statement - Transport Assessment Part 17Statement27 Jan 2023View
Appendix 13.1 Environmental Statement - Transport Assessment Part 16Statement27 Jan 2023View
Appendix 13.1 Environmental Statement - Transport Assessment Part 15Statement27 Jan 2023View
Appendix 8.5 Environmental Statement - Consultation ResponseStatement27 Jan 2023View
Appendix 8.4 Environmental Statement - Built Heritage AssessmentStatement27 Jan 2023View
Appendix 8.3 Environmental Statement - Archaeological Desk Based Assessment Part 2Statement27 Jan 2023View
Appendix 8.3 Environmental Statement - Archaeological Desk Based Assessment Part 1Statement27 Jan 2023View
Appendix 8.2 Environmental Statement - Assessment MethodologyStatement27 Jan 2023View
Appendix 8.1 Environmental Statement - Legislation, Policy & GuidanceStatement27 Jan 2023View
Appendix 7.6 Environmental Statement - Lighting Assessment Part 9Statement27 Jan 2023View
Appendix 7.6 Environmental Statement - Lighting Assessment Part 8Statement27 Jan 2023View
Appendix 7.6 Environmental Statement - Lighting Assessment Part 7Statement27 Jan 2023View
Appendix 7.6 Environmental Statement - Lighting Assessment Part 6Statement27 Jan 2023View
Appendix 7.6 Environmental Statement - Lighting Assessment Part 5Statement27 Jan 2023View
Appendix 7.6 Environmental Statement - Lighting Assessment Part 4Statement27 Jan 2023View
Appendix 7.6 Environmental Statement - Lighting Assessment Part 3Statement27 Jan 2023View
Appendix 7.6 Environmental Statement - Lighting Assessment Part 2Statement27 Jan 2023View
Appendix 7.6 Environmental Statement - Lighting Assessment Part 12Statement27 Jan 2023View
Appendix 7.6 Environmental Statement - Lighting Assessment Part 11Statement27 Jan 2023View
Appendix 7.6 Environmental Statement - Lighting Assessment Part 10Statement27 Jan 2023View
Appendix 7.6 Environmental Statement - Lighting Assessment Part 1Statement27 Jan 2023View
Appendix 7.5 Environmental Statement - Visually Verified MontagesStatement27 Jan 2023View
Appendix 7.4 Environmental Statement - Landscape Character AssessmentsStatement27 Jan 2023View
Appendix 7.3 Environmental Statement - Assessment MethodologyStatement27 Jan 2023View
Appendix 7.2B Environmental Statement - CorrespondenceStatement27 Jan 2023View
Appendix 7.2A Environmental Statement - CorrespondenceStatement27 Jan 2023View
Appendix 7.1 Environmental Statement - Landscape PolicyStatement27 Jan 2023View
Appendix 6.3 Environmental Statement - Habitat & Protected Species Survey ReportStatement27 Jan 2023View
Appendix 6.2 Environmental Statement - Assessment MethodologyStatement27 Jan 2023View
Appendix 6.1 Environmental Statement - Legislation, Policy & GuidanceStatement27 Jan 2023View
Appendix 2.3 Environmental Statement - Cumulative Effects PlanStatement27 Jan 2023View
Appendix 2.2 Environmental Statement - Scoping ResponseStatement27 Jan 2023View
Appendix 2.1 Environmental Statement - Scoping Report Part 4Statement27 Jan 2023View
Appendix 2.1 Environmental Statement - Scoping Report Part 3Statement27 Jan 2023View
EnvironmentalStatement27 Jan 2023View
Appendix 9.1 Environmental Statement - Phase 1 Geo-Environmental Desk Study Part 5Statement27 Jan 2023View
Appendix 9.1 Environmental Statement - Phase 1 Geo-Environmental Desk Study Part 4Statement27 Jan 2023View
Appendix 9.1 Environmental Statement - Phase 1 Geo-Environmental Desk Study Part 3Statement27 Jan 2023View
Appendix 9.1 Environmental Statement - Phase 1 Geo-Environmental Desk Study Part 2Statement27 Jan 2023View
Appendix 9.1 Environmental Statement - Phase 1 Geo-Environmental Desk Study Part 1Statement27 Jan 2023View
Figures 8.1-8.4 Environmental Statement - HeritageStatement27 Jan 2023View
Figure 7.8 Environmental Statement - Illustrative Landscape MasterplanStatement27 Jan 2023View
Figure 7.7 Environmental Statement - Landscape & Visual AnalysisStatement27 Jan 2023View
Figure 7.6 Environmental Statement - Viewpoint Photographs Part 2Statement27 Jan 2023View
Figure 7.6 Environmental Statement - Viewpoint Photographs Part 1Statement27 Jan 2023View
Figure 7.5 Environmental Statement - ZTV, Viewpoint Locations & PRoWStatement27 Jan 2023View
Figure 7.4B Environmental Statement - Landscape Character (District)Statement27 Jan 2023View
Figure 7.4A Environmental Statement - Landscape & Character (National & County)Statement27 Jan 2023View
Figure 7.3 Environmental Statement - TopographyStatement27 Jan 2023View
Figure 7.2 Environmental Statement - Planning DesignationsStatement27 Jan 2023View
Figure 7.1 Environmental Statement - Site Location PlanStatement27 Jan 2023View
Figure 13.5 Environmental Statement - Identified LinksStatement27 Jan 2023View
Figure 13.4 Environmental Statement - Public TransportStatement27 Jan 2023View
Figure 13.3 Environmental Statement - Pedestrian & Cycle NetworkStatement27 Jan 2023View
Figure 13.2 Environmental Statement - Location Plan & ContextStatement27 Jan 2023View
Figure 13.1 Environmental Statement - Study AreaStatement27 Jan 2023View
Appendix 10.1 Environmental Statement - Groundsure ReportStatement27 Jan 2023View
Economic BenefitsStatement27 Jan 2023View
Statement of Community InvolvementStatement27 Jan 2023View
EnergyStatement27 Jan 2023View
Environmental Statement - Non-Technical SummaryStatement14 Feb 2023View
Appendix 1.2 Environmental Statement - Red Line BoundaryStatement14 Feb 2023View
Appendix 1.3 Environmental Statement - Illustrative MasterplanStatement14 Feb 2023View
Appendix 1.1 Environmental Statement - Parameter Plans Part 4Statement24 Feb 2023View
Appendix 1.1 Environmental Statement - Parameter Plans Part 1Statement24 Feb 2023View
Appendix 1.1 Environmental Statement - Parameter Plans Part 3Statement24 Feb 2023View
Appendix 1.1 Environmental Statement - Parameter Plans Part 2Statement24 Feb 2023View
Environmental Statement - Non Technical SummaryStatement17 Feb 2025View
Environmental StatementStatement17 Feb 2025View
Appendix 1.1 Environmental Statement - Parameter Plans Part1Statement17 Feb 2025View
Appendix 1.1 Environmental Statement - Parameter Plans Part2Statement17 Feb 2025View
Appendix 1.1 Environmental Statement - Parameter Plans Part3Statement17 Feb 2025View
Appendix 1.1 Environmental Statement - Parameter Plans Part4Statement17 Feb 2025View
Appendix 1.2 Environmental Statement - Red Line BoundaryStatement17 Feb 2025View
Appendix 1.3 Environmental Statement - Illustrative MasterplanStatement17 Feb 2025View
Appendix 2.1 Environmental Statement - Scoping Report Part 1Statement17 Feb 2025View
Appendix 2.1 Environmental Statement - Scoping Report Part 2Statement17 Feb 2025View
Appendix 2.1 Environmental Statement - Scoping Report Part 3Statement17 Feb 2025View
Appendix 2.1 Environmental Statement - Scoping Report Part 4Statement17 Feb 2025View
Appendix 2.2 Environmental Statement - Scoping ResponseStatement17 Feb 2025View
Appendix 2.3 Environmental Statement - Cumulative Effects PlanStatement17 Feb 2025View
Appendix 6.1 Environmental Statement - Legislation, Policy & GuidanceStatement17 Feb 2025View
Appendix 6.2 Environmental Statement - Assessment MethodologyStatement17 Feb 2025View
Appendix 7.1 Environmental Statement - Landscape PolicyStatement17 Feb 2025View
Appendix 7.2_A Environmental Statement - South Downs CorrespondenceStatement17 Feb 2025View
Appendix 7.2_B Environmental Statement - Wealden CorrespondenceStatement17 Feb 2025View
Appendix 7.3 Environmental Statement - Assessment MethodologyStatement17 Feb 2025View
Appendix 7.4 Environmental Statement - Landscape Character AssessmentsStatement17 Feb 2025View
Appendix 7.5 Environmental Statement - Visually Verified MontagesStatement17 Feb 2025View
Appendix 7.6 Environmental Statement - Lighting Assessment Part 1Statement17 Feb 2025View
Appendix 7.6 Environmental Statement - Lighting Assessment Part 2Statement17 Feb 2025View
Appendix 7.6 Environmental Statement - Lighting Assessment Part 3Statement17 Feb 2025View
Appendix 7.6 Environmental Statement - Lighting Assessment Part 4Statement17 Feb 2025View
Appendix 7.6 Environmental Statement - Lighting Assessment Part 5Statement17 Feb 2025View
Appendix 7.6 Environmental Statement - Lighting Assessment Part 6Statement17 Feb 2025View
Appendix 7.6 Environmental Statement - Lighting Assessment Part 7Statement17 Feb 2025View
Appendix 7.6 Environmental Statement - Lighting Assessment Part 8Statement17 Feb 2025View
Appendix 7.6 Environmental Statement - Lighting Assessment Part 9Statement17 Feb 2025View
Appendix 7.6 Environmental Statement - Lighting Assessment Part 10Statement17 Feb 2025View
Appendix 7.6 Environmental Statement - Lighting Assessment Part 11Statement17 Feb 2025View
Appendix 7.6 Environmental Statement - Lighting Assessment Part 12Statement17 Feb 2025View
Appendix 8.1 Environmental Statement - Legislation, Policy & GuidanceStatement17 Feb 2025View
Appendix 8.2 Environmental Statement - Assessment MethodologyStatement17 Feb 2025View
Appendix 8.3 Environmental Statement - Archaeological Desk Based Assessment (Part 1)Statement17 Feb 2025View
Appendix 8.3 Environmental Statement - Archaeological Desk Based Assessment (Part 2)Statement17 Feb 2025View
Appendix 8.4 Environmental Statement - Built Heritage AssessmentStatement17 Feb 2025View
Appendix 8.5 Environmental Statement - Consultation ResponseStatement17 Feb 2025View
Appendix 9.1 Environmental Statement - Phase 1 Geoenvironmental Desk Study Part 1Statement17 Feb 2025View
Appendix 9.1 Environmental Statement - Phase 1 Geoenvironmental Desk Study Part 2Statement17 Feb 2025View
Appendix 9.1 Environmental Statement - Phase 1 Geoenvironmental Desk Study Part 3Statement17 Feb 2025View
Appendix 9.1 Environmental Statement - Phase 1 Geoenvironmental Desk Study Part 4Statement17 Feb 2025View
Appendix 9.1 Environmental Statement - Phase 1 Geoenvironmental Desk Study Part 5Statement17 Feb 2025View
Appendix 10.1 Environmental Statement - Groundsure ReportStatement17 Feb 2025View
Appendix 10.2 Environmental Statement - Flood Risk Assessment Part 1Statement17 Feb 2025View
Appendix 10.2 Environmental Statement - Flood Risk Assessment Part 2Statement17 Feb 2025View
Appendix 10.2 Environmental Statement - Flood Risk Assessment Part 3Statement17 Feb 2025View
Appendix 10.2 Environmental Statement - Flood Risk Assessment Part 4Statement17 Feb 2025View
Appendix 10.2 Environmental Statement - Flood Risk Assessment Part 5Statement17 Feb 2025View
Appendix 10.2 Environmental Statement - Flood Risk Assessment Part 6Statement17 Feb 2025View
Appendix 10.2 Environmental Statement - Flood Risk Assessment Part 7Statement17 Feb 2025View
Appendix 10.2 Environmental Statement - Flood Risk Assessment Part 8Statement17 Feb 2025View
Appendix 10.2 Environmental Statement - Flood Risk Assessment Part 9Statement17 Feb 2025View
Appendix 10.2 Environmental Statement - Flood Risk Assessment Part 10Statement17 Feb 2025View
Appendix 10.3 Environmental Statement - Preliminary Soakaway Feasibility AssessmentStatement17 Feb 2025View
Appendix 11.1 Environmental Statement - Air Quality Technical AppendixStatement17 Feb 2025View
Appendices 12.1-12.5 Environmental Statement - Noise & Vibration AppendicesStatement17 Feb 2025View
Appendix 13.1 Environmental Statement - Transport AssessmentStatement17 Feb 2025View
Appendix 13.2 Environmental Statement - Framework Travel PlanStatement17 Feb 2025View
Appendix 13.3 Environmental Statement - Construction Traffic Management PlanStatement17 Feb 2025View
Appendix 13.4 Environmental Statement - Committed DevelopmentStatement17 Feb 2025View
Appendix 13.5 Environmental Statement - Observed & Forecast Traffic FlowStatement17 Feb 2025View
Appendix 13.6 Environmental Statement - Assessment Extent ScreeningStatement17 Feb 2025View
Figure 7.1 Environmental Statement - Site Location PlanStatement17 Feb 2025View
Figure 7.2 Environmental Statement - Planning DesignationsStatement17 Feb 2025View
Figure 7.3 Environmental Statement - TopographyStatement17 Feb 2025View
Figure 7.4a Environmental Statement - Landscape Character (National and County)Statement17 Feb 2025View
Figure 7.4b Environmental Statement - Landscape Character (District)Statement17 Feb 2025View
Figure 7.5 Environmental Statement - ZTV, Viewpoint Locations and Public Rights of WayStatement17 Feb 2025View
Figure 7.6 Environmental Statement - Viewpoint Photographs Part 1Statement17 Feb 2025View
Figure 7.6 Environmental Statement - Viewpoint Photographs Part 2Statement17 Feb 2025View
Figure 7.7 Environmental Statement - Landscape & Visual AnalysisStatement17 Feb 2025View
Figure 7.8 Environmental Statement - Illustrative Landscape MasterplanStatement17 Feb 2025View
Figures 8.1-8.4 Environmental Statement - HeritageStatement17 Feb 2025View
Figure 13.1 Environmental Statement - Study AreaStatement17 Feb 2025View
Figure 13.2 Environmental Statement - Location Plan & ContextStatement17 Feb 2025View
Figure 13.3 Environmental Statement - Pedestrian & Cycle NetworkStatement17 Feb 2025View
Figure 13.4 Environmental Statement - Public TransportStatement17 Feb 2025View
Figure 13.5 Environmental Statement - Identified LinksStatement17 Feb 2025View
Economic BenefitsStatement17 Feb 2025View
EnergyStatement17 Feb 2025View
Environmental Statement Addendum - CommercialStatement17 Feb 2025View
Environmental Statement Addendum Appendix 2.1 - Transport Update StatementStatement17 Feb 2025View
Environmental Statement Addendum Appendix 2.2 - Technical Note - Response to National Highways CommentsStatement17 Feb 2025View
Environmental Statement Addendum Appendix 2.3 - 2024 Protected Species Survey ReportStatement17 Feb 2025View
Statement of Community InvolvementStatement17 Feb 2025View
Appendix 13.1 Environmental Statement - Transport Assessment Part 14Statement27 Jan 2023View
Appendix 13.1 Environmental Statement - Transport Assessment Part 13Statement27 Jan 2023View
Sustainability StatementStatement1 Oct 2025View
Transport Update Statement AddendumStatement1 Oct 2025View
Economic Benefits StatementStatement1 Oct 2025View
Energy StatementStatement1 Oct 2025View
Environmental Statement AddendumStatement1 Oct 2025View
PlanningStatement1 Oct 2025View
Planning Appendix 1 Meeting NotesStatement1 Oct 2025View
Planning Appendix 2 East Sussex HighwaysStatement1 Oct 2025View
Planning Appendix 3 National HighwaysStatement1 Oct 2025View
Planning Appendix 4 Suitability & Viability for Modern Logistics DevelopmentStatement1 Oct 2025View
Planning Appendix 5 Eastbourne Direction of Travel Issues & Options for the Eastbourne Local PlanStatement1 Oct 2025View
Planning Appendix 6 National HighwaysStatement1 Oct 2025View
Planning Appendix 7 Future of FreightStatement1 Oct 2025View
Planning Appendix 8 Economic Role of National HighwaysStatement1 Oct 2025View
Planning Appendix 9 SRN Initial Report for Road Investment Strategy 3Statement1 Oct 2025View
Planning Appendix 10 The Future of Roads Report RHAStatement1 Oct 2025View
Planning Appendix 11 CBRE UK Logistics Q1 2025Statement1 Oct 2025View
Planning Appendix 12 Freight Logistics & Gateways Strategy May 2022Statement1 Oct 2025View
Planning Appendix 13 TfSE Warehousing Provision Study March 2025Statement1 Oct 2025View
Planning Appendix 14 Market Assessment Updated ReportStatement1 Oct 2025View
Planning Appendix 15 Employment & Economic Study for Eastbourne & Wealden (April 2022)Statement1 Oct 2025View
Appendix 13.1 Environmental Statement - Transport Assessment Part 12Statement27 Jan 2023View
Environmental Statement AddendumStatement29 May 2026View
Asbestos Pre Demolition SurveySurvey18 Apr 2023View
NatureSpace Newt Officer*Consultation Response23 Mar 2023View
*Adjoining/Neighbour Letter10 Mar 2023View
*Adjoining/Neighbour Letter10 Mar 2023View
*Adjoining/Neighbour Letter13 Mar 2023View
*Adjoining/Neighbour Letter13 Mar 2023View
*Adjoining/Neighbour Letter13 Mar 2023View
*Adjoining/Neighbour Letter13 Mar 2023View
*Adjoining/Neighbour Letter13 Mar 2023View
*Adjoining/Neighbour Letter13 Mar 2023View
*Adjoining/Neighbour Letter13 Mar 2023View
*Adjoining/Neighbour Letter13 Mar 2023View
*Adjoining/Neighbour Letter13 Mar 2023View
*Adjoining/Neighbour Letter13 Mar 2023View
*Adjoining/Neighbour Letter15 Mar 2023View
*Adjoining/Neighbour Letter15 Mar 2023View
*Adjoining/Neighbour Letter15 Mar 2023View
*Adjoining/Neighbour Letter16 Mar 2023View
*Adjoining/Neighbour Letter16 Mar 2023View
*Adjoining/Neighbour Letter17 Mar 2023View
*Adjoining/Neighbour Letter20 Mar 2023View
*Adjoining/Neighbour Letter20 Mar 2023View
*Adjoining/Neighbour Letter27 Mar 2023View
*Adjoining/Neighbour Letter27 Mar 2023View
*Adjoining/Neighbour Letter30 Mar 2023View
*Adjoining/Neighbour Letter30 Mar 2023View
*Adjoining/Neighbour Letter4 Apr 2023View
*Adjoining/Neighbour Letter6 Apr 2023View
*Adjoining/Neighbour Letter7 Apr 2023View
*Adjoining/Neighbour Letter13 Apr 2023View
*Adjoining/Neighbour Letter17 Apr 2023View
*Adjoining/Neighbour Letter19 Apr 2023View
*Adjoining/Neighbour Letter20 Apr 2023View
*Adjoining/Neighbour Letter20 Apr 2023View
*Adjoining/Neighbour Letter24 Apr 2023View
*Adjoining/Neighbour Letter24 Apr 2023View
*Adjoining/Neighbour Letter25 Apr 2023View
*Adjoining/Neighbour Letter26 Apr 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
*Adjoining/Neighbour Letter4 May 2023View
Comments (60).pdfAdjoining/Neighbour Letter4 May 2023View
Comments (61).pdfAdjoining/Neighbour Letter4 May 2023View
-Adjoining/Neighbour Letter4 May 2023View
Comments (64).pdfAdjoining/Neighbour Letter4 May 2023View
Comments (65).pdfAdjoining/Neighbour Letter4 May 2023View
-Adjoining/Neighbour Letter4 May 2023View
Comments (67).pdfAdjoining/Neighbour Letter4 May 2023View
Comments (70).pdfAdjoining/Neighbour Letter5 May 2023View
Comments (71).pdfAdjoining/Neighbour Letter5 May 2023View
Comments (72).pdfAdjoining/Neighbour Letter5 May 2023View
Comments (73).pdfAdjoining/Neighbour Letter5 May 2023View
Comments (75).pdfAdjoining/Neighbour Letter5 May 2023View
Comments (76).pdfAdjoining/Neighbour Letter5 May 2023View
Comments (77).pdfAdjoining/Neighbour Letter5 May 2023View
Comments (82).pdfAdjoining/Neighbour Letter5 May 2023View
Comments (84).pdfAdjoining/Neighbour Letter5 May 2023View
-Adjoining/Neighbour Letter5 May 2023View
-Adjoining/Neighbour Letter5 May 2023View
-Adjoining/Neighbour Letter5 May 2023View
Comments (85).pdfAdjoining/Neighbour Letter5 May 2023View
Comments (86).pdfAdjoining/Neighbour Letter5 May 2023View
Comments (88).pdfAdjoining/Neighbour Letter5 May 2023View
Comments (90).pdfAdjoining/Neighbour Letter5 May 2023View
Comments (91).pdfAdjoining/Neighbour Letter5 May 2023View
Comments (92).pdfAdjoining/Neighbour Letter6 May 2023View
Comments (93).pdfAdjoining/Neighbour Letter6 May 2023View
Comments (94).pdfAdjoining/Neighbour Letter6 May 2023View
Comments (95).pdfAdjoining/Neighbour Letter7 May 2023View
Comments (96).pdfAdjoining/Neighbour Letter7 May 2023View
Comments (97).pdfAdjoining/Neighbour Letter7 May 2023View
Comments (98).pdfAdjoining/Neighbour Letter7 May 2023View
Comments (99).pdfAdjoining/Neighbour Letter7 May 2023View
Comments (100).pdfAdjoining/Neighbour Letter7 May 2023View
Comments (101).pdfAdjoining/Neighbour Letter7 May 2023View
Comments (102).pdfAdjoining/Neighbour Letter7 May 2023View
Comments (103).pdfAdjoining/Neighbour Letter7 May 2023View
Comments (104).pdfAdjoining/Neighbour Letter7 May 2023View
Comments (105)(1).pdfAdjoining/Neighbour Letter9 May 2023View
Comments (106).pdfAdjoining/Neighbour Letter7 May 2023View
Comments (107).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (108).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (109).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (110).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (111).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (112).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (113).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (114).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (118).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (119).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (120).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (125).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (126).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (127).pdfAdjoining/Neighbour Letter8 May 2023View
-Adjoining/Neighbour Letter8 May 2023View
Comments (129).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (130).pdfAdjoining/Neighbour Letter8 May 2023View
-Adjoining/Neighbour Letter8 May 2023View
Comments (135).pdfAdjoining/Neighbour Letter8 May 2023View
-Adjoining/Neighbour Letter9 May 2023View
Comments (138).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (139).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (140).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (141).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (142).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (143).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (144).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (145).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (147).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (148).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (149).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (150).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (151).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (152).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (153).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (154).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (155).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (156).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (157).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (158).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (159).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (160).pdfAdjoining/Neighbour Letter8 May 2023View
Comments (161).pdfAdjoining/Neighbour Letter8 May 2023View
-Adjoining/Neighbour Letter9 May 2023View
-Adjoining/Neighbour Letter9 May 2023View
-Adjoining/Neighbour Letter9 May 2023View
-Adjoining/Neighbour Letter9 May 2023View
-Adjoining/Neighbour Letter9 May 2023View
-Adjoining/Neighbour Letter9 May 2023View
-Adjoining/Neighbour Letter10 May 2023View
-Adjoining/Neighbour Letter10 May 2023View
-Adjoining/Neighbour Letter30 May 2023View
-Adjoining/Neighbour Letter5 Jun 2023View
Comments (162).pdfAdjoining/Neighbour Letter24 Sept 2024View
Comments (163).pdfAdjoining/Neighbour Letter7 Oct 2024View
Comments (164)(1).pdfAdjoining/Neighbour Letter9 Oct 2024View
-Adjoining/Neighbour Letter3 Mar 2025View
-Adjoining/Neighbour Letter20 Mar 2025View
-Adjoining/Neighbour Letter21 Mar 2025View
23.0260 Worcester 01.04.25.pdfAdjoining/Neighbour Letter1 Apr 2025View
-Adjoining/Neighbour Letter4 Apr 2025View
-Adjoining/Neighbour Letter4 Nov 2025View
Comments (170).pdfAdjoining/Neighbour Letter4 Nov 2025View
Comments (171).pdfAdjoining/Neighbour Letter4 Nov 2025View
Comments (172).pdfAdjoining/Neighbour Letter4 Nov 2025View
Comments (173).pdfAdjoining/Neighbour Letter4 Nov 2025View
-Adjoining/Neighbour Letter5 Nov 2025View
Comments (174).pdfAdjoining/Neighbour Letter5 Nov 2025View
Comments (175).pdfAdjoining/Neighbour Letter5 Nov 2025View
Comments (176).pdfAdjoining/Neighbour Letter5 Nov 2025View
Comments (177).pdfAdjoining/Neighbour Letter7 Nov 2025View
-Adjoining/Neighbour Letter10 Nov 2025View
Comments (178).pdfAdjoining/Neighbour Letter10 Nov 2025View
-Adjoining/Neighbour Letter17 Nov 2025View
Comments 179.pdfAdjoining/Neighbour Letter18 Nov 2025View
Comments 180.pdfAdjoining/Neighbour Letter18 Nov 2025View
Comments (181).pdfAdjoining/Neighbour Letter20 Nov 2025View
Comments (182).pdfAdjoining/Neighbour Letter21 Nov 2025View
-Adjoining/Neighbour Letter26 Nov 2025View
Comments (183).pdfAdjoining/Neighbour Letter26 Nov 2025View
Comments (184).pdfAdjoining/Neighbour Letter30 Nov 2025View
Comments (185).pdfAdjoining/Neighbour Letter30 Nov 2025View
Comments (186).pdfAdjoining/Neighbour Letter30 Nov 2025View
Comments (187).pdfAdjoining/Neighbour Letter30 Nov 2025View
Comments (188).pdfAdjoining/Neighbour Letter30 Nov 2025View
Comments (189).pdfAdjoining/Neighbour Letter30 Nov 2025View
Comments (190).pdfAdjoining/Neighbour Letter30 Nov 2025View
Comments (191).pdfAdjoining/Neighbour Letter1 Dec 2025View
Comments (192).pdfAdjoining/Neighbour Letter1 Dec 2025View
Comments (194).pdfAdjoining/Neighbour Letter4 Dec 2025View
-Adjoining/Neighbour Letter8 Dec 2025View
Comments (196).pdfAdjoining/Neighbour Letter9 Dec 2025View
Comments (197).pdfAdjoining/Neighbour Letter9 Dec 2025View
Comments (198).pdfAdjoining/Neighbour Letter9 Dec 2025View
Comments (199).pdfAdjoining/Neighbour Letter9 Dec 2025View
23.0260 Byrne 09.12.25.pdfAdjoining/Neighbour Letter9 Dec 2025View
23.0260 Cousens 09.12.25.pdfAdjoining/Neighbour Letter9 Dec 2025View
Comments (202).pdfAdjoining/Neighbour Letter9 Dec 2025View
23.0260 Thursfield 09.12.25.pdfAdjoining/Neighbour Letter9 Dec 2025View
23.0260 Nash 09.12.25.pdfAdjoining/Neighbour Letter9 Dec 2025View
23.0260 Smith 09.12.25.pdfAdjoining/Neighbour Letter9 Dec 2025View
23.0260 Brown 09.12.25.pdfAdjoining/Neighbour Letter9 Dec 2025View
Comments (208).pdfAdjoining/Neighbour Letter9 Dec 2025View
Comments (209).pdfAdjoining/Neighbour Letter9 Dec 2025View
Comments (210).pdfAdjoining/Neighbour Letter9 Dec 2025View
Comments (211).pdfAdjoining/Neighbour Letter9 Dec 2025View
Comments (214).pdfAdjoining/Neighbour Letter10 Dec 2025View
Comments (215).pdfAdjoining/Neighbour Letter10 Dec 2025View
-Adjoining/Neighbour Letter10 Dec 2025View
Comments (217).pdfAdjoining/Neighbour Letter10 Dec 2025View
Comments (219).pdfAdjoining/Neighbour Letter10 Dec 2025View
Comments (220).pdfAdjoining/Neighbour Letter10 Dec 2025View
Comments (221).pdfAdjoining/Neighbour Letter10 Dec 2025View
Comments (223).pdfAdjoining/Neighbour Letter10 Dec 2025View
Comments (224).pdfAdjoining/Neighbour Letter11 Dec 2025View
Comments (225).pdfAdjoining/Neighbour Letter11 Dec 2025View
Comments (226).pdfAdjoining/Neighbour Letter12 Dec 2025View
Comments (227).pdfAdjoining/Neighbour Letter12 Dec 2025View
Comments (228)(1).pdfAdjoining/Neighbour Letter7 Jan 2026View
-Adjoining/Neighbour Letter23 Jun 2026View
Comments (229).pdfAdjoining/Neighbour Letter1 Jul 2026View
Comments (230).pdfAdjoining/Neighbour Letter1 Jul 2026View
Comments 231.pdfAdjoining/Neighbour Letter1 Jul 2026View
Comments 232.pdfAdjoining/Neighbour Letter1 Jul 2026View
Comments (233).pdfAdjoining/Neighbour Letter1 Jul 2026View
Comments (234).pdfAdjoining/Neighbour Letter1 Jul 2026View
Comments 235.pdfAdjoining/Neighbour Letter1 Jul 2026View
Comments 236.pdfAdjoining/Neighbour Letter1 Jul 2026View
Comments (237).pdfAdjoining/Neighbour Letter1 Jul 2026View
Comments (238).pdfAdjoining/Neighbour Letter1 Jul 2026View
Comments (239).pdfAdjoining/Neighbour Letter1 Jul 2026View
Comments (240).pdfAdjoining/Neighbour Letter2 Jul 2026View
-Adjoining/Neighbour Letter2 Jul 2026View
Comments 241(1).pdfAdjoining/Neighbour Letter3 Jul 2026View
-Adjoining/Neighbour Letter17 Jul 2026View
ESCC Highways*Consultee Response7 Mar 2023View
Environment Agency*Consultee Response9 Mar 2023View
Sussex Police*Consultee Response10 Mar 2023View
East Sussex Fire & Rescue Service*Consultee Response15 Mar 2023View
Polegate Town Council*Consultee Response21 Mar 2023View
Hailsham Town Council*Consultee Response21 Mar 2023View
NatureSpace Newt Officer*Consultee Response22 Mar 2023View
WDC Footpaths*Consultee Response23 Mar 2023View
National Highways*Consultee Response23 Mar 2023View
WDC Drainage*Consultee Response23 Mar 2023View
ESCC Rights of Way*Consultee Response27 Mar 2023View
Southern Water*Consultee Response4 Apr 2023View
ESCC Archaeology*Consultee Response13 Apr 2023View
WDC/Rother Pollution Control*Consultee Response27 Apr 2023View
WDC Conservation and Design*Consultee Response3 May 2023View
National HighwaysConsultee Response22 Jun 2023View
Rother District CouncilConsultee Response4 Jul 2023View
National HighwaysConsultee Response22 Sept 2023View
South Downs National Park AuthorityConsultee Response29 Sept 2023View
ESCC HighwaysConsultee Response11 Mar 2024View
National HighwaysConsultee Response21 Mar 2024View
Environment AgencyConsultee Response6 Sept 2024View
NatureSpace Newt OfficerConsultee Response12 Sept 2024View
Town CouncilConsultee Response16 Sept 2024View
Town CouncilConsultee Response16 Sept 2024View
Highways EnglandConsultee Response17 Sept 2024View
District CouncilConsultee Response18 Sept 2024View
ESCC Flood Risk ManagementConsultee Response18 Sept 2024View
South Downs National Park AuthorityConsultee Response28 Oct 2024View
Environment AgencyConsultee Response6 Mar 2025View
Sussex PoliceConsultee Response6 Mar 2025View
Southern WaterConsultee Response10 Mar 2025View
South Downs National Park AuthorityConsultee Response12 Mar 2025View
National HighwaysConsultee Response14 Mar 2025View
WDC/Rother Pollution Control - Environmental HealthConsultee Response17 Mar 2025View
Town CouncilConsultee Response20 Mar 2025View
Rother District CouncilConsultee Response24 Mar 2025View
ESCC ArchaeologyConsultee Response26 Mar 2025View
National HighwaysConsultee Response16 Jun 2025View
National HighwaysConsultee Response12 Sept 2025View
Crime Prevention Design AdviserConsultee Response17 Oct 2025View
East Sussex Fire & Rescue ServiceConsultee Response20 Oct 2025View
ESCC ArchaeologyConsultee Response28 Oct 2025View
NatureSpace Newt OfficerConsultee Response30 Oct 2025View
Southern WaterConsultee Response31 Oct 2025View
WDC/Rother Pollution ControlConsultee Response3 Nov 2025View
National HighwaysConsultee Response4 Nov 2025View
Environment AgencyConsultee Response4 Nov 2025View
Parish Council - PolegateConsultee Response6 Nov 2025View
ESCC HighwaysConsultee Response7 Nov 2025View
Town Council - HailshamConsultee Response7 Nov 2025View
South Downs National Park AuthorityConsultee Response10 Nov 2025View
WDC BiodiversityConsultee Response10 Nov 2025View
ESCC Flood Risk Management and Pevensey and Cuckmere Water Level Management BoardConsultee Response12 Nov 2025View
WDC Economic DevelopmentConsultee Response20 Nov 2025View
ESCC HighwaysConsultee Response26 Nov 2025View
ESCC Public HealthConsultee Response28 Nov 2025View
ESCC Flood Risk ManagementConsultee Response8 Jan 2026View
ESCC Flood Risk ManagementConsultee Response22 Jan 2026View
Rother District CouncilConsultee Response28 Jan 2026View
Environment AgencyConsultee Response2 Jul 2026View
ESCC Flood Risk Management Pevensey & Cuckmere Water BoardConsultee Response8 Jul 2026View
Appendix 7 - Site PhotosPhotos27 Aug 2024View
-Planning History8 Feb 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

N/A
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.