ApprovedCouncil status: Granted on 11-Mar-2021

Application seeks permission for the variation of condition 53 (Date upon which sand and gravel and waste operations must cease – the landfill must cease operation by 14th May 2021) of planning permission R16/890805 (the extraction of sand and gravel with restoration by landfill) in order to extend the life of the landfill for a further 10 years, resulting in a revised end date of 14th May 2031. In addition, a number of waste management facilities (Street Sweeping Recycling Facility; Incineration Bottom Ash and an Open Windrow Green Waste Composting Facility) have planning permission to operate within the site, with their use limited to the duration of the landfill operations. These facilities would be retained on site for the extended life of the landfill, until 14th May 2031.

Land at Ling Hall Quarry Landfill Site, Coalpit Lane, Lawford Heath, Rugby, CV23 9HH

Warwickshire County CouncilReference RBC/20CM002Waste Major

Last published check: 10 Nov 2026, 07:33. Check the council record for more recent changes.

Status and dates

Last published check: 10 Nov 2026, 07:33 (UK)

  1. Not publishedReceivedNo date on council record
  2. Not publishedValidatedNo date on council record
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedGranted11 Mar 2021

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (2)
  1. Registration Date

    Published milestoneCouncil source
  2. Decision Date

    Published milestoneCouncil source
Application type
Waste Major
Documents
56 published

Proposal

Application seeks permission for the variation of condition 53 (Date upon which sand and gravel and waste operations must cease – the landfill must cease operation by 14th May 2021) of planning permission R16/890805 (the extraction of sand and gravel with restoration by landfill) in order to extend the life of the landfill for a further 10 years, resulting in a revised end date of 14th May 2031. In addition, a number of waste management facilities (Street Sweeping Recycling Facility; Incineration Bottom Ash and an Open Windrow Green Waste Composting Facility) have planning permission to operate within the site, with their use limited to the duration of the landfill operations. These facilities would be retained on site for the extended life of the landfill, until 14th May 2031.

Reference
RBC/20CM002

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • ApplicationFormRedacted.pdfCouncil documentNot publishedView
  • 1911_LingHall_PS_FINAL(1).pdfCouncil documentNot publishedView
  • 1912_LingHall_ES Contents_FINAL.pdfCouncil documentNot publishedView
  • 1912_LingHall_ES_chp03_FINAL(1).pdfCouncil documentNot publishedView
  • 1912_LingHall_ES_chp11_FINAL(1).pdfCouncil documentNot publishedView
  • LingHall_Appendix_9-1_to_9-4.pdfCouncil documentNot publishedView
  • LingHall_Appendix_12-1 to 12-3.pdfCouncil documentNot publishedView
  • LingHall_Appendix 11_5__EcIA_Bat Survey Report_2019_vf.pdfCouncil documentNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Granted
RBC20CM002_Planning_Decision_v1_Redacted.pdf
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.