Application seeks permission for the variation of condition 53 (Date upon which sand and gravel and waste operations must cease – the landfill must cease operation by 14th May 2021) of planning permission R16/890805 (the extraction of sand and gravel with restoration by landfill) in order to extend the life of the landfill for a further 10 years, resulting in a revised end date of 14th May 2031. In addition, a number of waste management facilities (Street Sweeping Recycling Facility; Incineration Bottom Ash and an Open Windrow Green Waste Composting Facility) have planning permission to operate within the site, with their use limited to the duration of the landfill operations. These facilities would be retained on site for the extended life of the landfill, until 14th May 2031.
Land at Ling Hall Quarry Landfill Site, Coalpit Lane, Lawford Heath, Rugby, CV23 9HH
Application seeks permission for the variation of condition 53 (Date upon which sand and gravel and waste operations must cease – the landfill must cease operation by 14th May 2021) of planning permission R16/890805 (the extraction of sand and gravel with restoration by landfill) in order to extend the life of the landfill for a further 10 years, resulting in a revised end date of 14th May 2031. In addition, a number of waste management facilities (Street Sweeping Recycling Facility; Incineration Bottom Ash and an Open Windrow Green Waste Composting Facility) have planning permission to operate within the site, with their use limited to the duration of the landfill operations. These facilities would be retained on site for the extended life of the landfill, until 14th May 2031.
Reference
RBC/20CM002
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.