Status on council recordCouncil status: Consultations sent - Delegated decision to be made

Full Planning Application seeking consent for the installation of new infrastructure to the Merevale AD facility, to facilitate the management of biogas prior to export to the National Gas Grid, together with associated works, increase in throughput of food waste from the existing 45,000tpa to 120,000tpa and the removal of an area of 1700m3 of existing earth bank to allow an increase in floorspace to allow for the locating of the additional gas to grid infrastructure.

Biogen Merevale, Merevale Lane, Baxterley, Warwickshire, CV9 2LA

Warwickshire County CouncilReference NWB/26CM002Waste Major

Last published check: 20 Nov 2026, 14:59. Check the council record for more recent changes.

Status and dates

Last published check: 20 Nov 2026, 14:59 (UK)

  1. Not publishedReceivedNo date on council record
  2. Not publishedValidatedNo date on council record
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. Not yet publishedDecisionNo decision on council record

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (1)
  1. Registration Date

    Published milestoneCouncil source
Application type
Waste Major
Documents
59 published

Proposal

Full Planning Application seeking consent for the installation of new infrastructure to the Merevale AD facility, to facilitate the management of biogas prior to export to the National Gas Grid, together with associated works, increase in throughput of food waste from the existing 45,000tpa to 120,000tpa and the removal of an area of 1700m3 of existing earth bank to allow an increase in floorspace to allow for the locating of the additional gas to grid infrastructure.

Reference
NWB/26CM002

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • BNG.pdfCouncil documentNot publishedView
  • Appendix 9.1 Carbon Calcs_Final.pdfCouncil documentNot publishedView
  • Appendix 8.2 LVIA Policy.pdfCouncil documentNot publishedView
  • Appendix 8.1 LVIA Methodology FINAL.pdfCouncil documentNot publishedView
  • Appendix 6.4 Prel Ecological G2G Pipeline.pdfCouncil documentNot publishedView
  • Appendix 6.1 Preliminary Ecological Appraisal.pdfCouncil documentNot publishedView
  • 8.8 Site Photographs - compressed.pdfCouncil documentNot publishedView
  • 8.7 Viewpoint Photographs - compressed vs 2.pdfCouncil documentNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Consultations sent - Delegated decision to be made
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.