Plans and Specifications submission under Schedule 17 to the High Speed Rail (London ? West Midlands) Act 2017 for works comprising:Structures: Reinforced concrete overbridge jacked with wingwalls with a span of approximately 18m; structure accommodates two network rail tracks (the existing and a future provision for an additional track), robust kerb and concrete parapets. Including the provision of a safety guardrail and a pipe outlet headwall.Earthworks: The overbridge approach embankments are a reinstatement of the Coventry to Leamington Spa railway. Earthworks are approximately 21m in length with a maximum height of 1m to the north and 22m in length with a maximum height of 1.4m to the south. Fencing: Security fencing.

Land at the existing Coventry to Leamington Spa railway approximately 300m south east of the A429 Kenilworth Road.

DecidedReference: W/25/0761/HS2Warwick District Council

Last published check: 22 Sept 2026, 04:28. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Decision Issued Date

    Published milestoneCouncil source
  5. Decision Made Date

    Published milestoneCouncil source

Application summary

Status
Decided
Application type
HS2 applications
Received
29 May 2025
Validated
29 May 2025
Determination deadline
Not published
Local authority
Warwick District Council

Application overview

Plans and Specifications submission under Schedule 17 to the High Speed Rail (London ? West Midlands) Act 2017 for works comprising:Structures: Reinforced concrete overbridge jacked with wingwalls with a span of approximately 18m; structure accommodates two network rail tracks (the existing and a future provision for an additional track), robust kerb and concrete parapets. Including the provision of a safety guardrail and a pipe outlet headwall.Earthworks: The overbridge approach embankments are a reinstatement of the Coventry to Leamington Spa railway. Earthworks are approximately 21m in length with a maximum height of 1m to the north and 22m in length with a maximum height of 1.4m to the south. Fencing: Security fencing.

Proposal details

Reference
W/25/0761/HS2
Ward
Cubbington and Leek Wootton
Parish
Stoneleigh
Agent
Balfour Beatty Vinci (BBV)

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land at the existing Coventry to Leamington Spa railway approximately 300m south east of the A429 Kenilworth Road.

This record has no verified map location.

View council map

Documents 14 of 14

DocumentPublishedAction
Decision Notice or LetterDecision · PDF22 Jul 2025View
Natural EnglandConsultation Response · PDF23 Jun 2025View
Historic EnglandConsultation Response · PDF19 Jun 2025View
site location planSite Location Plan · PDF29 May 2025View
NDRSupporting Report · PDF29 May 2025View
Mitigation LetterSupporting Report · PDF29 May 2025View
ProformaSupporting Report · PDF29 May 2025View
ElevationsDrawing · PDF29 May 2025View
General ArrangementDrawing · PDF29 May 2025View
LEMPDrawing · PDF29 May 2025View
SectionsDrawing · PDF29 May 2025View
Table of documentsSupporting Report · PDF29 May 2025View
Cover LetterSupporting Report · PDF29 May 2025View
Written StatementSupporting Report · PDF29 May 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Granted
Decision Notice or Letter
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.