Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Coventry Airport, Rowley Road, Baginton, Coventry, CV3 4FR
Last published check: 12 Oct 2026, 14:33. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceReserved matters application pursuant to outline permission W/21/1370 for the development of battery manufacturing facility with ancillary battery recycling capability including landscaping, car parking, access and associated works.The reserved matters application is for site wide enabling works including formation of development plateaus, earthworks, strategic drainage features, a primary substation, strategic landscaping, and the demolition of existing structures, plus formation of the main spine road within the site with connections to approved access points 1, 2 and 5.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsCoventry Airport, Rowley Road, Baginton, Coventry, CV3 4FR
This record has no verified map location.
View council map| Document | Published | Action |
|---|---|---|
| WCC Highways responseConsultation Response · PDF | 20 Apr 2026 | View |
| Decision Notice or LetterDecision · PDF | 24 Dec 2025 | View |
| Prinary Substation Compound Fencing - Sheet 1 of 2Drawing · PDF | 18 Dec 2025 | View |
| PRIMARY SUBSTATION COMPOUND CABLE ARRANGEMENT - SHEET 2 OF 2Drawing · PDF | 18 Dec 2025 | View |
| Update ReportReport · PDF | 10 Dec 2025 | View |
| Committee DecisionsDecision · PDF | 9 Dec 2025 | View |
| Design CodeSupporting Report · PDF | 9 Dec 2025 | View |
| GPP Phase 1 Substation Compound Design.Drawing · PDF | 8 Dec 2025 | View |
| Mr Matt Dyer-Objects-56 Burnham Road Whitley Coventry(FULL)Objection Comment · PDF | 4 Dec 2025 | View |
| Mr Terence Bailey-Objects-35,Gregory Avenue Coventry(FULL)Objection Comment · PDF | 2 Dec 2025 | View |
| Mr Matt Dyer-Objects-56 Burnham Road Whitley Coventry(FULL)Objection Comment · PDF | 2 Dec 2025 | View |
| Mr Phil Thomas-Objects-29 Beehive Hill Kenilworth(FULL)Objection Comment · PDF | 2 Dec 2025 | View |
| Mr Matt Dyer-Objects-56 Burnham Road Whitley Coventry(FULL)Objection Comment · PDF | 2 Dec 2025 | View |
| Committee Report - Single ReportReport · PDF | 30 Nov 2025 | View |
| GPP RM1 Submission ScheduleSupporting Report · PDF | 26 Nov 2025 | View |
| RM1 LANDSCAPE PROPOSALS SHEET 12Drawing · PDF | 26 Nov 2025 | View |
| RM1 LANDSCAPE PROPOSALS SHEET 11Drawing · PDF | 26 Nov 2025 | View |
| RM1 LANDSCAPE PROPOSALS SHEET 9Drawing · PDF | 26 Nov 2025 | View |
| RM1 LANDSCAPE PROPOSALS SHEET 8Drawing · PDF | 26 Nov 2025 | View |
| RM1 LANDSCAPE PROPOSALS SHEET 7Drawing · PDF | 26 Nov 2025 | View |
| RM1 LANDSCAPE PROPOSALS SHEET 2Drawing · PDF | 26 Nov 2025 | View |
| RM1 LANDSCAPE PROPOSALS SHEET 1Drawing · PDF | 26 Nov 2025 | View |
| RM1 LANDSCAPE GENERAL ARRANGEMENTDrawing · PDF | 26 Nov 2025 | View |
| FPCR Response to officer comments 26.11.25Supporting Report · PDF | 26 Nov 2025 | View |
| WCC LANDSCAPE TEAMConsultation Response · PDF | 20 Nov 2025 | View |
| Response to officer comments 27.10.25Supporting Report · PDF | 28 Oct 2025 | View |
| Substation Noise Impact Assessment v1.0 FINALSupporting Report · PDF | 28 Oct 2025 | View |
| RM1 LANDSCAPE GENERAL ARRANGEMENTDrawing · PDF | 28 Oct 2025 | View |
| RM1 LANDSCAPE GENERAL ARRANGEMENTDrawing · PDF | 28 Oct 2025 | View |
| RM1 LANDSCAPE GENERAL ARRANGEMENTDrawing · PDF | 28 Oct 2025 | View |
| RM1 LANDSCAPE GENERAL ARRANGEMENTDrawing · PDF | 28 Oct 2025 | View |
| RM1 LANDSCAPE GENERAL ARRANGEMENTDrawing · PDF | 28 Oct 2025 | View |
| RM1 LANDSCAPE GENERAL ARRANGEMENTDrawing · PDF | 28 Oct 2025 | View |
| RM1 LANDSCAPE GENERAL ARRANGEMENTDrawing · PDF | 28 Oct 2025 | View |
| RM1 LANDSCAPE GENERAL ARRANGEMENTDrawing · PDF | 28 Oct 2025 | View |
| RM1 LANDSCAPE GENERAL ARRANGEMENTDrawing · PDF | 28 Oct 2025 | View |
| RM1 LANDSCAPE GENERAL ARRANGEMENTDrawing · PDF | 28 Oct 2025 | View |
| RM1 LANDSCAPE GENERAL ARRANGEMENTDrawing · PDF | 28 Oct 2025 | View |
| RM1 LANDSCAPE GENERAL ARRANGEMENTDrawing · PDF | 28 Oct 2025 | View |
| RM1 LANDSCAPE GENERAL ARRANGEMENTDrawing · PDF | 28 Oct 2025 | View |
| RM1 LANDSCAPE GENERAL ARRANGEMENTDrawing · PDF | 28 Oct 2025 | View |
| RM1 LANDSCAPE GENERAL ARRANGEMENTDrawing · PDF | 28 Oct 2025 | View |
| RM1 LANDSCAPE GENERAL ARRANGEMENTDrawing · PDF | 28 Oct 2025 | View |
| RM1 LANDSCAPE GENERAL ARRANGEMENTDrawing · PDF | 28 Oct 2025 | View |
| RM1 LANDSCAPE GENERAL ARRANGEMENTDrawing · PDF | 28 Oct 2025 | View |
| RM1 LANDSCAPE GENERAL ARRANGEMENTDrawing · PDF | 28 Oct 2025 | View |
| Phase 1, Substation Compound Design Tender-A1.Drawing · PDF | 28 Jul 2025 | View |
| Phase 1, Substation Compound Design Tender, Fencing-A1Drawing · PDF | 28 Jul 2025 | View |
| WCC Flood Risk ManagementConsultation Response · PDF | 3 Jul 2025 | View |
| Health and community ProtectionConsultation Response · PDF | 16 May 2025 | View |
| WCC LANDSCAPE TEAM RESPONSEConsultation Response · PDF | 23 Apr 2025 | View |
| TECHNICAL NOTE :-REVISED ACCESS ARRANGEMENT (GREENPOWER PARK)Drawing · PDF | 18 Apr 2025 | View |
| CLLR CLLR JOSH PAYNE RESPONSEConsultation Response · PDF | 17 Apr 2025 | View |
| Mr Matthew Brooks-Objects-23 Hobs Meadow Solihull(FULL)Objection Comment · PDF | 16 Apr 2025 | View |
| Mr Matt Dyer-Objects-56 Burnham Road Coventry(FULL)Objection Comment · PDF | 15 Apr 2025 | View |
| BUBBENHALL PARISH COUNCIL - RESPONSEConsultation Response · PDF | 2 Apr 2025 | View |
| Bubbenhall Parish Council commentsConsultation Response · PDF | 2 Apr 2025 | View |
| Health and Community Protection- CommentConsultation Response · PDF | 26 Mar 2025 | View |
| Mr Jim Roberts -Objects-The Granary, Piece Barn Farm, Leamington Road BubbenhallObjection Comment · PDF | 25 Mar 2025 | View |
| Mr Ron Walker-Objects-Airpark Flight Centre Ltd Coventry Airport Rowley Road BagObjection Comment · PDF | 19 Mar 2025 | View |
| WCC Flood Risk Management - CommentsConsultation Response · PDF | 19 Mar 2025 | View |
| Coventry City Council - CommentConsultation Response · PDF | 19 Mar 2025 | View |
| WCC LANDSCAPE TEAM - RESPONSEConsultation Response · PDF | 18 Mar 2025 | View |
| WCC Arboricultural CommentConsultation Response · PDF | 18 Mar 2025 | View |
| Ms Patricia Campbell-Objects-7 The Row Coventry Road Baginton Near Coventry(FULLObjection Comment · PDF | 18 Mar 2025 | View |
| Mr Robert Taylor-Objects-32 Mill Hill Baginton Coventry(FULL)Objection Comment · PDF | 18 Mar 2025 | View |
| Mr Rowan Smith-Objects-47 Gayton Road Eastcote Towcester(FULL)Objection Comment · PDF | 18 Mar 2025 | View |
| Mr Rowan Smith-Objects-47 GAYTON ROAD EASTCOTE TOWCESTER(FULL)Objection Comment · PDF | 18 Mar 2025 | View |
| Mr Roger Horsfall-Objects-The Mews, Home Farm Church Road Baginton(FULL)Objection Comment · PDF | 18 Mar 2025 | View |
| Mr Alan Longstaff-Objects-119 Goldthorne Avenue Sheldon Birmingham(FULL)Objection Comment · PDF | 18 Mar 2025 | View |
| WCC ECOLOGY - COMMENTSConsultation Response · PDF | 17 Mar 2025 | View |
| BAGINTON PARISH COUNCIL - COMMENTSConsultation Response · PDF | 17 Mar 2025 | View |
| Mr James Barnwell -Objects-24 Rowley Road Baginton Coventry(FULL)Objection Comment · PDF | 17 Mar 2025 | View |
| Mr James Barnwell -Objects-24 Rowley Road Baginton Coventry(FULL)Objection Comment · PDF | 17 Mar 2025 | View |
| Mrs Anita Barnwell-Objects-24 Rowley Road Baginton Coventry(FULL)Objection Comment · PDF | 16 Mar 2025 | View |
| Mr Craig Stanton -Objects-22, Oak Close Baginton Coventry(FULL)Objection Comment · PDF | 15 Mar 2025 | View |
| Mr Simon Haynes-Objects-14 Frances Road, Baginton Baginton Warwickshire(FULL)Objection Comment · PDF | 13 Mar 2025 | View |
| Mr CHRIS DERBYSHIRE-Objects-Brandon lane Brandon Lane Coventry(FULL)Objection Comment · PDF | 13 Mar 2025 | View |
| Mr CHRIS DERBYSHIRE-Objects-FLAT BRANDON MARSH NATURE CENTRE BRANDON LANE BRANDOObjection Comment · PDF | 13 Mar 2025 | View |
| Rugby Borough Council - CommentConsultation Response · PDF | 11 Mar 2025 | View |
| Miss Terri Wells-Objects-12 Frances road Baginton Coventry(FULL)Objection Comment · PDF | 9 Mar 2025 | View |
| Mrs Rheba Horsfall-Objects-The Mews Church Road Coventry(FULL)Objection Comment · PDF | 7 Mar 2025 | View |
| Mrs Catherine Weston-Objects-18 Oak Close Baginton(FULL)Objection Comment · PDF | 5 Mar 2025 | View |
| Miss Chris England-Objects-7 Kimberley Road Baginton Coventry(FULL)Objection Comment · PDF | 5 Mar 2025 | View |
| Mrs Amanda Hill-Objects-713 London Road Tollbar End Coventry(FULL)Objection Comment · PDF | 4 Mar 2025 | View |
| WCC ARCHAEOLOGICAL COMMENTSConsultation Response · PDF | 4 Mar 2025 | View |
| Mr John Ashley-Objects-6 Andrews Close Baginton Coventry(FULL)Objection Comment · PDF | 4 Mar 2025 | View |
| Miss Samantha Taylor-Objects-1 Oak Close Baginton Coventry(FULL)Objection Comment · PDF | 3 Mar 2025 | View |
| Miss Rebecca Barnwell-Objects-24 Rowley Road Baginton Coventry(FULL)Objection Comment · PDF | 3 Mar 2025 | View |
| Mr Terence Bailey-Objects-35, Gregory Avenue Coventry(FULL)Objection Comment · PDF | 3 Mar 2025 | View |
| Mr Ben Edwards-Objects-26 Rowley Road Baginton(FULL)Objection Comment · PDF | 3 Mar 2025 | View |
| Mrs Janet Goggins-Crabtree-Objects-24 Oak Close Baginton Village Coventry(FULL)Objection Comment · PDF | 3 Mar 2025 | View |
| CLLR PAM REDFORD- CUBBINGTON & LEEK WOOTTON WARDConsultation Response · PDF | 3 Mar 2025 | View |
| APPLICATION FORM REDACTED1Application Form · PDF | 31 Jan 2025 | View |
| EXTENT OF WORKS PLANRM1-P6-Drawing · PDF | 31 Jan 2025 | View |
| PHASINGRM1-P6-Drawing · PDF | 31 Jan 2025 | View |
| RM1 GENERAL ARRANGMENT-P8Drawing · PDF | 31 Jan 2025 | View |
| INDICATIVE MASTERPLAN-P16Site Location Plan · PDF | 31 Jan 2025 | View |
| PHASE 1 - SUBSTATION COMPOUND LAYOUTDrawing · PDF | 31 Jan 2025 | View |
| EXISTING CONTOURS PLANDrawing · PDF | 31 Jan 2025 | View |
| FORMATION CONTOURS PLANDrawing · PDF | 31 Jan 2025 | View |
| CUT AND FILL PLANDrawing · PDF | 31 Jan 2025 | View |
| EARTHWORK SECTIONS PLANDrawing · PDF | 31 Jan 2025 | View |
| SITEWIDE INFRASTRUCTURE SECTION 1-1Drawing · PDF | 31 Jan 2025 | View |
| SITEWIDE INFRASTRUCTURE SECTION 2-2Drawing · PDF | 31 Jan 2025 | View |
| SITEWIDE INFRASTRUCTURE SECTION 3-3Drawing · PDF | 31 Jan 2025 | View |
| SITEWIDE INFRASTRUCTURE SECTION 4-4Drawing · PDF | 31 Jan 2025 | View |
| SITEWIDE INFRASTRUCTURE SECTION 5-5Drawing · PDF | 31 Jan 2025 | View |
| SITEWIDE INFRASTRUCTURE SECTION 6-6Drawing · PDF | 31 Jan 2025 | View |
| SITEWIDE INFRASTRUCTURE SECTION 7-7Drawing · PDF | 31 Jan 2025 | View |
| SITEWIDE INFRASTRUCTURE SECTION 8-8Drawing · PDF | 31 Jan 2025 | View |
| SITEWIDE INFRASTRUCTURE SECTION 9-9Drawing · PDF | 31 Jan 2025 | View |
| SECTION A-A SHEET 1136129200000.PDFDrawing · PDF | 31 Jan 2025 | View |
| SITEWIDE INFRASTRUCTURE SECTION A-A SHEET 2Drawing · PDF | 31 Jan 2025 | View |
| SITEWIDE INFRASTRUCTURE SECTION A-A SHEET 3Drawing · PDF | 31 Jan 2025 | View |
| SITEWIDE INFRASTRUCTURE SECTION B-B SHEET 1Drawing · PDF | 31 Jan 2025 | View |
| SITEWIDE INFRASTRUCTURE SECTION B-B SHEET 2Drawing · PDF | 31 Jan 2025 | View |
| MAIN SPINE ROAD - OVERVIEW PLANDrawing · PDF | 31 Jan 2025 | View |
| MAIN SPINE ROAD - GENERAL ARRANGEMENT SHEET 1Drawing · PDF | 31 Jan 2025 | View |
| MAIN SPINE ROAD - GENERAL ARRANGEMENT SHEET 2Drawing · PDF | 31 Jan 2025 | View |
| MAIN SPINE ROAD - VEHICLE TRACKING SHEET 1Drawing · PDF | 31 Jan 2025 | View |
| MAIN SPINE ROAD - VEHICLE TRACKING SHEET 2Drawing · PDF | 31 Jan 2025 | View |
| MAIN SPINE ROAD - VEHICLE TRACKING SHEET 3Drawing · PDF | 31 Jan 2025 | View |
| MAIN SPINE ROAD - VEHICLE TRACKING SHEET 4Drawing · PDF | 31 Jan 2025 | View |
| MAIN SPINE ROAD - VEHICLE TRACKING SHEET 5Drawing · PDF | 31 Jan 2025 | View |
| MAIN SPINE ROAD - CHAINAGE PLANDrawing · PDF | 31 Jan 2025 | View |
| MAIN SPINE ROAD - LONG SECTION SHEET 1Drawing · PDF | 31 Jan 2025 | View |
| MAIN SPINE ROAD - LONG SECTION SHEET 2Drawing · PDF | 31 Jan 2025 | View |
| MAIN SPINE ROAD - LONG SECTION SHEET 3Drawing · PDF | 31 Jan 2025 | View |
| MAIN SPINE ROAD - CROSS SECTION PLAN SHEET 1Drawing · PDF | 31 Jan 2025 | View |
| MAIN SPINE ROAD - CROSS SECTION PLAN SHEET 2Drawing · PDF | 31 Jan 2025 | View |
| MAIN SPINE ROAD - CROSS SECTION PLAN SHEET 3Drawing · PDF | 31 Jan 2025 | View |
| MAIN SPINE ROAD - CROSS SECTION PLAN SHEET 4Drawing · PDF | 31 Jan 2025 | View |
| MAIN SPINE ROAD - CROSS SECTION PLAN SHEET 5Drawing · PDF | 31 Jan 2025 | View |
| MAIN SPINE ROAD - CROSS SECTION PLAN SHEET 6Drawing · PDF | 31 Jan 2025 | View |
| ROAD 6 - LONG SECTIONDrawing · PDF | 31 Jan 2025 | View |
| ROAD 6 - CROSS SECTION PLANDrawing · PDF | 31 Jan 2025 | View |
| ROAD 7 - LONG SECTIONDrawing · PDF | 31 Jan 2025 | View |
| ROAD 7 - CROSS SECTION PLAN SHEET 1DFDrawing · PDF | 31 Jan 2025 | View |
| ROAD 7 - CROSS SECTION PLAN SHEET 2Drawing · PDF | 31 Jan 2025 | View |
| DESIGN AND ACCESS STATEMENT REV ESupporting Report · PDF | 31 Jan 2025 | View |
| RM1 RM2 APPLICATION FEE AGREEMENT WDC CCCCase Correspondence · PDF | 31 Jan 2025 | View |
| RM1 LANDSCAPE PROPOSAL SHEET 1Drawing · PDF | 31 Jan 2025 | View |
| RM1 LANDSCAPE PROPOSAL SHEET 2Drawing · PDF | 31 Jan 2025 | View |
| RM1 LANDSCAPE PROPOSAL SHEET 3Drawing · PDF | 31 Jan 2025 | View |
| RM1 LANDSCAPE PROPOSAL SHEET 4Drawing · PDF | 31 Jan 2025 | View |
| RM1 LANDSCAPE PROPOSAL SHEET 5Drawing · PDF | 31 Jan 2025 | View |
| RM1 LANDSCAPE PROPOSAL SHEET 6Drawing · PDF | 31 Jan 2025 | View |
| RM1 LANDSCAPE PROPOSAL SHEET 7Drawing · PDF | 31 Jan 2025 | View |
| RM1 LANDSCAPE PROPOSAL SHEET 8Drawing · PDF | 31 Jan 2025 | View |
| RM1 LANDSCAPE PROPOSAL SHEET 9Drawing · PDF | 31 Jan 2025 | View |
| RM1 LANDSCAPE PROPOSAL SHEET 11Drawing · PDF | 31 Jan 2025 | View |
| RM1 LANDSCAPE PROPOSAL SHEET 12Drawing · PDF | 31 Jan 2025 | View |
| RM1 LANDSCAPE PROPOSAL SHEET 13Drawing · PDF | 31 Jan 2025 | View |
| DRAINAGE GENERAL ARRANGEMENT - OVERVIEW SHEETDrawing · PDF | 31 Jan 2025 | View |
| DRAINAGE GENERAL ARRANGEMENT - SHEET 1Drawing · PDF | 31 Jan 2025 | View |
| DRAINAGE GENERAL ARRANGEMENT - SHEET 2Drawing · PDF | 31 Jan 2025 | View |
| DRAINAGE GENERAL ARRANGEMENT - SHEET 3Drawing · PDF | 31 Jan 2025 | View |
| DRAINAGE GENERAL ARRANGEMENT - SHEET 4Drawing · PDF | 31 Jan 2025 | View |
| DRAINAGE CONSTRUCTION DETAILS - SHEET 1Drawing · PDF | 31 Jan 2025 | View |
| DRAINAGE CONSTRUCTION DETAILS - SHEET 2Drawing · PDF | 31 Jan 2025 | View |
| CATCHMENT AREA PLANDrawing · PDF | 31 Jan 2025 | View |
| OVERLAND FLOW ROUTE - OPERATIONALDrawing · PDF | 31 Jan 2025 | View |
| OVERLAND FLOW ROUTE - CONSTRUCTIONDrawing · PDF | 31 Jan 2025 | View |
| NORTHERN OUTFALL NETWORK CALCULATIONSDrawing · PDF | 31 Jan 2025 | View |
| SOUTHERN OUTFALL NETWORK CALCULATIONSDrawing · PDF | 31 Jan 2025 | View |
| DRAINAGE COMPRESSEDPART1Drawing · PDF | 31 Jan 2025 | View |
| DRAINAGE COMPRESSEDPART2Drawing · PDF | 31 Jan 2025 | View |
| DRAINAGE COMPRESSEDPART3Drawing · PDF | 31 Jan 2025 | View |
| DRAINAGE COMPRESSEDPART4Drawing · PDF | 31 Jan 2025 | View |
| DRAINAGE COMPRESSEDPART5Drawing · PDF | 31 Jan 2025 | View |
| DRAINAGE COMPRESSEDPART6Drawing · PDF | 31 Jan 2025 | View |
| DRAINAGE COMPRESSEDPART7Drawing · PDF | 31 Jan 2025 | View |
| DRAINAGE COMPRESSEDPART8Drawing · PDF | 31 Jan 2025 | View |
| DRAINAGE COMPRESSEDPART9Drawing · PDF | 31 Jan 2025 | View |
| DRAINAGE COMPRESSEDPART10Drawing · PDF | 31 Jan 2025 | View |
| DRAINAGE COMPRESSEDPART11Drawing · PDF | 31 Jan 2025 | View |
| DRAINAGE COMPRESSEDPART12Drawing · PDF | 31 Jan 2025 | View |
| DRAINAGE COMPRESSEDPART13Drawing · PDF | 31 Jan 2025 | View |
| DRAINAGE COMPRESSEDPART14Drawing · PDF | 31 Jan 2025 | View |
| DRAINAGE COMPRESSEDPART15Drawing · PDF | 31 Jan 2025 | View |
| GREENPOWER PARK COVENTRY - NOISE IMPACT ASSESSMENT V1.0Supporting Report · PDF | 31 Jan 2025 | View |
| GREENPOWER PARK AQ FINALSupporting Report · PDF | 31 Jan 2025 | View |
| PLANNING CONDITION 27 MATERIALSSupporting Report · PDF | 31 Jan 2025 | View |
| PLANNING CONDITION 29Drawing · PDF | 31 Jan 2025 | View |
| PARKING PRINCIPLES NOTE FOR RMCOPYSupporting Report · PDF | 31 Jan 2025 | View |
| RM1 LANDSCAPE GENERAL ARRANGEMENTDrawing · PDF | 31 Jan 2025 | View |
| RM1 LANDSCAPE PROPOSAL SHEET 10Drawing · PDF | 31 Jan 2025 | View |
| PPL GPP FIRST PHASE RM AND CONDITIONS STATEMENT VFSupporting Report · PDF | 31 Jan 2025 | View |
| GPP RM1 SUBMISSION SCHEDULE 240125Supporting Report · PDF | 31 Jan 2025 | View |
| COVER LETTER / SUPPORTING INFORMATIONCase Correspondence · PDF | 31 Jan 2025 | View |
| DESIGN CODE JAN 25- CONDITION 43Supporting Report · PDF | 31 Jan 2025 | View |
| WRITTEN SCHEME OF INVESTIGATION FOR POST-CONSENT WORKS PHASE 1: ARCHAEOLOGICAL-CSupporting Report · PDF | 31 Jan 2025 | View |
| Retention & Removal Plan Sheet 1 -(Condition 10)Drawing · PDF | 31 Jan 2025 | View |
| Retention & Removal Plan Sheet 2 -(Condition 10)Drawing · PDF | 31 Jan 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.