Council planning record

Construction, operation and subsequent decommissioning of a renewable energy park comprising ground mounted Solar Photovoltaics (PV) with co-located Battery Energy Storage System (BESS) at the point of connection, together with associated infrastructure, access, landscaping and cabling (cross boundary application with Solihull Metropolitan Borough Council)

Land to south of Birmingham Road, Kenilworth, Warwick and Land at Meer End, Solihull.

Appeal decidedReference: W/23/1358Warwick District Council

Last published check: 1 Oct 2026, 19:15. Check the council record for more recent changes.

Application location

Land to south of Birmingham Road, Kenilworth, Warwick and Land at Meer End, Solihull.

This record has no verified map location.

View council map

Application summary

Status
Appeal decided
Application type
Planning Permission
Received
14 Sept 2023
Validated
14 Sept 2023
Determination deadline
23 Apr 2024
Local authority
Warwick District Council

Application overview

Construction, operation and subsequent decommissioning of a renewable energy park comprising ground mounted Solar Photovoltaics (PV) with co-located Battery Energy Storage System (BESS) at the point of connection, together with associated infrastructure, access, landscaping and cabling (cross boundary application with Solihull Metropolitan Borough Council)

Proposal details

Reference
W/23/1358
Ward
Kenilworth Abbey and Arden
Parish
Kenilworth

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 471 of 471

DocumentPublishedAction
Delegated Report - MAReport · PDF13 Jul 2026View
Doc MAN - Decision Noticie - MADecision · PDF13 Jul 2026View
Application Form RedactedMinor Amendment · PDF16 Jun 2026View
Cover LetterMinor Amendment · PDF16 Jun 2026View
Site Layout PlanMinor Amendment · PDF16 Jun 2026View
Site Layout Plan BESS and SubstationMinor Amendment · PDF16 Jun 2026View
Objection - Carol Banks, Springhill HouseMinor Amendment · PDF25 Feb 2026View
Technical NoteMinor Amendment · PDF12 Feb 2026View
Delegated Report - MAReport · PDF3 Feb 2026View
Doc MAN - Decision Noticie - MADecision · PDF3 Feb 2026View
Condition Phasing Plan.Minor Amendment · PDF19 Sept 2025View
HLEP_Condition_Phasing_Plan_Report.Minor Amendment · PDF19 Sept 2025View
Application Form RedactedMinor Amendment · PDF19 Sept 2025View
HollyLaneNoiseConditions_v2.Minor Amendment · PDF19 Sept 2025View
Appeal DecisionAppeal Decision · PDF30 Jan 2025View
Pegasus Group - Additional comments on Green BeltAppeal Document · PDF15 Jan 2025View
Associated appeal attached to Pegasus Group emailAppeal Document · PDF15 Jan 2025View
Hearing AgendaAppeal Document · PDF13 Jan 2025View
Holly Lane Appeal Cover LetterAppeal Document · PDF13 Jan 2025View
P21-2535 TR01 - Transport Appeal Statement Report Final Rev3.Appeal Document · PDF13 Jan 2025View
ARC_1196-026-R1_Safety_Summary_ Holly_Lane_Issue_1Appeal Document · PDF13 Jan 2025View
Suggested list of conditions from Pegasus GroupAppeal Document · PDF10 Jan 2025View
CD 10.5 STATEMENT OF COMMON GROUND - APPELLANT AND WDC - 07.01.2025 FINALAppeal Document · PDF8 Jan 2025View
CD 10.5 Draft Conditions with WDCAppeal Document · PDF8 Jan 2025View
CD 10.5 Appendix 1 - Core Documents List V6Appeal Document · PDF8 Jan 2025View
Core Document List V7Appeal Document · PDF8 Jan 2025View
Email from Pegasus Group attaching Core Document List V7 - explaining revisionsAppeal Document · PDF8 Jan 2025View
Appendix 3 - Core Documents List V5Appeal Document · PDF16 Dec 2024View
CD 7.33 Overarching National Policy Statement for Energy (EN-1).pdfAppeal Document · PDF16 Dec 2024View
CD 7.34 National Policy Statement for Renewable Energy Infrastructure (EN-3)Appeal Document · PDF16 Dec 2024View
CD 7.35 UK Government Solar Strategy 2014Appeal Document · PDF16 Dec 2024View
CD 7.36 Commercial Renewable Energy Development and the Historic EnvironmentAppeal Document · PDF16 Dec 2024View
CD 7.37 Climate Change Act 2008Appeal Document · PDF16 Dec 2024View
CD 7.38 Digest of United Kingdom Energy Statistics (July 2024 Edition)Appeal Document · PDF16 Dec 2024View
CD 7.39 Government food strategyAppeal Document · PDF16 Dec 2024View
CD 7.40 POWERING UP BRITAIN ENERGY SECURITY STRATEGY (MARCH 2023)Appeal Document · PDF16 Dec 2024View
CD 7.41 CONNECTIONS ACTION PLAN (NOVEMBER 2023)Appeal Document · PDF16 Dec 2024View
CD 7.42 National Grid ESO Future Energy Scenarios (July 2024)Appeal Document · PDF16 Dec 2024View
CD 7.43 Achieving Net Zero ? Farming?s 2040 goal, published by the NFUAppeal Document · PDF16 Dec 2024View
CD 7.44 Natural Capital Best Practice GuidanceAppeal Document · PDF16 Dec 2024View
CD 8.52 Lowland Farm Halesowen Appeal Ref APP.C4615.W.24.3341383Appeal Document · PDF16 Dec 2024View
CD 8.53 Werrington - Stoke on Trent (Appeal Ref APP.B3438.W.23.3335922)Appeal Document · PDF16 Dec 2024View
CD1.2 Whole Site LayoutAppeal Document · PDF16 Dec 2024View
CD4.4.1 Consultee Comment-CLLR BURROWS OBJECTION AND COMMITTEE CALL-INAppeal Document · PDF16 Dec 2024View
CD 4.4.2 Consultee Comment-ECOLOGYAppeal Document · PDF16 Dec 2024View
CD4.4.3 Consultee Comment-ENVIRONMENT AGENCYAppeal Document · PDF16 Dec 2024View
CD4.4.4 Consultee Comment-HERITAGE - FURTHER INFORMATION REQUESTEDAppeal Document · PDF16 Dec 2024View
CD4.4.5 Consultee Comment-HERITAGE - NO OBJECTIONAppeal Document · PDF16 Dec 2024View
CD 4.4.6 Consultee Comment-HIGHWAY - NO OBJECTIONAppeal Document · PDF16 Dec 2024View
CD 4.4.7 Consultee Comment-LANDSCAPEAppeal Document · PDF16 Dec 2024View
CD 4.4.8 Consultee Comment-PUBLIC PROTECTION - NO OBJECTIONAppeal Document · PDF16 Dec 2024View
CD 4.4.9 Consultee Comment-SMBC - CONTAMINATED LANDAppeal Document · PDF16 Dec 2024View
CD 4.4.10 Consultee Comment-SMBC - DRAINAGE LLFAAppeal Document · PDF16 Dec 2024View
CD 4.4.11 Consultee Comment-SMBC - POLICY AND SPATIAL PLANNINGAppeal Document · PDF16 Dec 2024View
CD 4.4.12 Consultee Comment-WCC ARCHAEOLOGYAppeal Document · PDF16 Dec 2024View
CD 4.4.13 Consultee Comment-Public Right of WaysAppeal Document · PDF16 Dec 2024View
CD 4.4.14 Consultee Comment-heritage commentsAppeal Document · PDF16 Dec 2024View
CD 5.3.1 Consultee Comments -Tree_Officer - No_CommentsAppeal Document · PDF16 Dec 2024View
CD 5.3.2 Consultee Comments - Health and Community Protection - CommentsAppeal Document · PDF16 Dec 2024View
CD 5.3.3 Consultee Comments - SOLIHULL METROPOLITAN BOROUGH COUNCIL-COMMENTSAppeal Document · PDF16 Dec 2024View
CD 5.3.4 Consultee Comments - KENILWORTH TOWN COUNCIL - COMMENTSAppeal Document · PDF16 Dec 2024View
CD 5.3.5 Consultee Comments - WCC Flood Risk Management - Objection CommentsAppeal Document · PDF16 Dec 2024View
CD 5.3.6 Consultee Comments - Environment Agency - CommentsAppeal Document · PDF16 Dec 2024View
CD 5.3.7 Consultee Comments - WCC Landscape - CommentsAppeal Document · PDF16 Dec 2024View
CD 5.3.8 Consultee Comments - Conservation - No Objection CommentsAppeal Document · PDF16 Dec 2024View
CD 5.3.9 Consultee Comments - WATER OFFICER BEDWORTH FIRE STATION NEUTRALAppeal Document · PDF16 Dec 2024View
CD 5.3.10 Consultee Comments - WCC Highways Authority - CommentsAppeal Document · PDF16 Dec 2024View
CD 5.3.11 Consultee Comments - Warwickshire Fire and Rescue ServiceAppeal Document · PDF16 Dec 2024View
CD 5.3.12 Consultee Comments - WCC Ecology - CommentsAppeal Document · PDF16 Dec 2024View
CD 5.3.13 Consultee Comments - WCC_LandscapeAppeal Document · PDF16 Dec 2024View
CD 5.3.14 Consultee Comments - WCC Landscape Comment.Appeal Document · PDF16 Dec 2024View
CD 5.3.15 Consultee Comments - WCC FLOOD RISK MANAGEMENT - NO OBJECTION COMMENTAppeal Document · PDF16 Dec 2024View
CD 5.3.16 Consultee Comments - Rights of Way Warwickshire County CouncilAppeal Document · PDF16 Dec 2024View
Third Party Reps - J E BamptonAppeal Document · PDF17 Oct 2024View
WDC Statement of Case - Cross Boundary AppealAppeal Document · PDF16 Oct 2024View
Appeal document relating to linked appeal APP/T3725/W/24/3347316Appeal Document · PDF16 Oct 2024View
Appeal QuestionnaireAppeal Document · PDF17 Sept 2024View
Start date letterAppeal Document · PDF10 Sept 2024View
APPENDIX 3 - CORE DOCUMENTS LIST V3Appeal Document · PDF30 Aug 2024View
APPENDICES TO HEARING STATEMENTAppeal Document · PDF30 Aug 2024View
HEARING STATEMENT V3Appeal Document · PDF30 Aug 2024View
APPENDIX 2 - HOLLY LANE LANDSCAPE HEARING STATEMENTAppeal Document · PDF30 Aug 2024View
CONSULTATION SUMMARY LETTER/APPENDICESAppeal Document · PDF15 Aug 2024View
APPENDIX B OF CONSULTATION SUMMARY LETTERAppeal Document · PDF15 Aug 2024View
APPENDIX C OF CONSULTATION SUMMARY LETTERAppeal Document · PDF15 Aug 2024View
APPENDIX D OF CONSULTATION SUMMARY LETTERAppeal Document · PDF15 Aug 2024View
APPENDIX E OF CONSULTATION SUMMARY LETTERAppeal Document · PDF15 Aug 2024View
APPENDIX A OF CONSULTATION SUMMARY LETTERAppeal Document · PDF15 Aug 2024View
CD3.1 SITE LOCATION PLANAppeal Document · PDF2 Jul 2024View
CD3.2 SITE LAYOUT PLAN FULLAppeal Document · PDF2 Jul 2024View
CD3.3 SITE LAYOUT PLAN BESS AND SUBSTATIONAppeal Document · PDF2 Jul 2024View
CD3.4 WATER STORAGE TANAppeal Document · PDF2 Jul 2024View
CD3.5 LANDSCAPE MITIGATION PLAN SHEET 1 OF 2 (SOLAR)Appeal Document · PDF2 Jul 2024View
CD3.6 LANDSCAPE MITIGATION PLAN SHEET 2 OF 2 (BESSAppeal Document · PDF2 Jul 2024View
CD3.7 SUMMARY OF CHANGES COMPARISON PLANAppeal Document · PDF2 Jul 2024View
CD3.8 SUMMARY OF CHANGES REPORTAppeal Document · PDF2 Jul 2024View
CD3.9 AIA_HOLLY LANE, SOLIHULL_IH_JUNE 2024_REV AAppeal Document · PDF2 Jul 2024View
CD3.10 TIN-DRAINAGE_077_TIN_V3-3_LN_20240611Appeal Document · PDF2 Jul 2024View
CD3.11 LV TECHNICAL NOTE V1Appeal Document · PDF2 Jul 2024View
CD3.12 P21-2535-A_EN_08 PHOTOMONTAGES_LRAppeal Document · PDF2 Jul 2024View
CD3.13 SITE SELECTION JUSTIFICATION REPORT ADDENDUM V3.0 (RED.)Appeal Document · PDF2 Jul 2024View
CD3.14 ECIA_V4.0Appeal Document · PDF2 Jul 2024View
CD3.15 BNG REPORT_BESS ONLY_V2.0Appeal Document · PDF2 Jul 2024View
CD3.16 BNG REPORT_TOTALDEV_V3.0Appeal Document · PDF2 Jul 2024View
CD3.17 DBSMP_ARC-1196-019-R1_HOLLY_LANE_ISSUE_1Appeal Document · PDF2 Jul 2024View
CD3.18 STATUTORY_BIODIVERSITY_METRIC_BESS ONLY_V1.0.XLSMAppeal Document2 Jul 2024View
CD3.19 STATUTORY_BIODIVERSITY_METRIC_SOLAR PARK AND BESS_V2.0.XLSMAppeal Document2 Jul 2024View
CD1.1 SITE LOCATION PLANAppeal Document · PDF2 Jul 2024View
CD1.2 WHOLE SITE LAYOUTAppeal Document · PDF2 Jul 2024View
CD1.3 SOLAR FARMAppeal Document · PDF2 Jul 2024View
CD1.4 BESS_SUBSTATIONAppeal Document · PDF2 Jul 2024View
CD1.5 BATTERY UNITAppeal Document · PDF2 Jul 2024View
CD1.6 MV INVERTERAppeal Document · PDF2 Jul 2024View
CD1.7 SUBSTATION BUILDINGAppeal Document · PDF2 Jul 2024View
CD1.8 GRID TRANSFORMERAppeal Document · PDF2 Jul 2024View
CD1.9 RMU AND CONTROL ENCLOSURESAppeal Document · PDF2 Jul 2024View
CD1.10 AUX TRANSFORMERAppeal Document · PDF2 Jul 2024View
CD1.11 SUBSTATION FENCE AND ACCESSAppeal Document · PDF2 Jul 2024View
CD1.12 BESS CCTV AND LIGHTINGAppeal Document · PDF2 Jul 2024View
CD1.13 132KV SWITCHGEARAppeal Document · PDF2 Jul 2024View
CD1.14 SOLAR PANELAppeal Document · PDF2 Jul 2024View
CD1.15 SOLAR FENCE AND CCTVAppeal Document · PDF2 Jul 2024View
CD1.16 33KV CABLE CONNECTION AND CONTROL ROOMAppeal Document · PDF2 Jul 2024View
CD1.17 TYPICAL 33KV TRANSFORMERAppeal Document · PDF2 Jul 2024View
CD1.18 LANDSCAPE MITIGATION PLAN SHEET 1 OF 2 (SOLAR) LRAppeal Document · PDF2 Jul 2024View
CD1.19 LANDSCAPE MITIGATION PLAN SHEET 2 OF 2 (BESS)Appeal Document · PDF2 Jul 2024View
CD1.20 SMBC FORMAppeal Document · PDF2 Jul 2024View
CD1.21 WDC FORMAppeal Document · PDF2 Jul 2024View
CD1.22 COVERING LETTER (SMBCAppeal Document · PDF2 Jul 2024View
CD1.23 COVERING LETTER (WDC)Appeal Document · PDF2 Jul 2024View
CD1.24 NOTICE FORM UNDER ARTICLE 14Appeal Document · PDF2 Jul 2024View
CD1.25 DESIGN ACCESS STATEMENT_FINAL LRAppeal Document · PDF2 Jul 2024View
CD1.26 PLANNING STATEMENTAppeal Document · PDF2 Jul 2024View
CD1.27 SCE_20230718 _PARTAppeal Document · PDF2 Jul 2024View
CD1.28 SCE_20230718 _PART2Appeal Document · PDF2 Jul 2024View
CD1.29 SCE_20230718 _PART3Appeal Document · PDF2 Jul 2024View
CD1.30 OBSMP_20230718Appeal Document · PDF2 Jul 2024View
CD1.31 HOLLYLANE-PROPOSAL-OVERVIEW-A4-23091Appeal Document · PDF2 Jul 2024View
CD1.32 SITESELECTIONJUSTIFICATIONREPORT_20230717 LRAppeal Document · PDF2 Jul 2024View
CD1.43 AIA_JULY 2023 LRAppeal Document · PDF2 Jul 2024View
CD1.44 ALC REPORTAppeal Document · PDF2 Jul 2024View
CD1.45 CTMP 20230831Appeal Document · PDF2 Jul 2024View
CD1.46 HERITAGE STATEMENT_20230712 LRAppeal Document · PDF2 Jul 2024View
CD1.47 FRA LRAppeal Document · PDF2 Jul 2024View
CD1.48 GLINT AND GLARE_20230808 LRAppeal Document · PDF2 Jul 2024View
CD1.49 NIA_20230727 LRAppeal Document · PDF2 Jul 2024View
CD1.50 ECIAAppeal Document · PDF2 Jul 2024View
CD1.51 HOLLY LANE ENERGY PARK ONLY_BNG REPORT V1.0Appeal Document · PDF2 Jul 2024View
CD1.52 HOLLY LANE BESS ONLY_BNG REPORT_V1.0Appeal Document · PDF2 Jul 2024View
CD1.53 HOLLY LANE ENERGY PARK AND BESS_BNG REPORT_V2.0Appeal Document · PDF2 Jul 2024View
CD2.1 EXISTING_LEVELS_&_PROPOSED_INFRASTRUCTREAppeal Document · PDF2 Jul 2024View
CD2.2 INDICATIVE_PLATFORM_LEVELS_&_INFRASTRUCTREAppeal Document · PDF2 Jul 2024View
CD2.3 INDICATIVE_SITE_DESIGN_SECTION_DETAILAppeal Document · PDF2 Jul 2024View
CD2.4 SITE LAYOUT PLAN FULLAppeal Document · PDF2 Jul 2024View
CD2.5 SITE LAYOUT PLAN BESS AND SUBSTATIONAppeal Document · PDF2 Jul 2024View
CD2.6 BESS AND SUBSTATION ELEVATIONS SUMMARY PLANAppeal Document · PDF2 Jul 2024View
CD2.7 TYPICAL DNO CONTROL ROOMAppeal Document · PDF2 Jul 2024View
CD2.8 TYPICAL ANCILLARY SUBSTATION BUILDINGAppeal Document · PDF2 Jul 2024View
CD2.9 LANDSCAPE MITIGATION PLAN SHEET 2 OF 2 (BESS)Appeal Document · PDF2 Jul 2024View
CD2.10 NIA_20230727 LRAppeal Document · PDF2 Jul 2024View
CD2.11 GEOPHYSREPORT_XH49 REPORT V3Appeal Document · PDF2 Jul 2024View
CD2.12 SMBC_SUBMISSION_REBUTTAL_LETTERAppeal Document · PDF2 Jul 2024View
CD2.12 SMBC_SUBMISSION_REBUTTAL_LETTERAppeal Document · PDF2 Jul 2024View
CD2.14 HOLLYLANENOISERESPONSE_V3-0_AM_20240130Appeal Document · PDF2 Jul 2024View
CD2.15 TIN_V2-0_LN_20240214[44]Appeal Document · PDF2 Jul 2024View
CD2.16 PS&GB_ADDENDUM_20240314Appeal Document · PDF2 Jul 2024View
CD2.17 PS&GB ADD. APPENDICESAppeal Document · PDF2 Jul 2024View
CD4.1 SMBC DECISION NOTICE - 2039579Appeal Document · PDF2 Jul 2024View
CD4.2 SMBC COMMITTEE REPORTAppeal Document · PDF2 Jul 2024View
CD4.3 SMBC COMMITTEE MEETING MINUTES 07022024Appeal Document · PDF2 Jul 2024View
CD5.1 WDC DECISION NOTICEAppeal Document · PDF2 Jul 2024View
CD5.2 WDC OFFICER REPORAppeal Document · PDF2 Jul 2024View
CD6.1 SOLIHULL LOCAL PLAN 2013Appeal Document · PDF2 Jul 2024View
CD6.2 WARWICK LOCAL PLAN 2011-2029Appeal Document · PDF2 Jul 2024View
CD6.3 BALSALL NEIGHBOURHOOD DEVELOPMENT PLANAppeal Document · PDF2 Jul 2024View
CD6.4 KENILWORTH NEIGHBOURHOOD PLANAppeal Document · PDF2 Jul 2024View
CD6.5 SOLIHULL LOCAL PLAN REVIEW (OCTOBER 2020)Appeal Document · PDF2 Jul 2024View
CD10.1 APPELLANTS STATEMENT OF CASE_V4.0Appeal Document · PDF2 Jul 2024View
CD10.4 DRAFT STATEMENT OF COMMON GROUND - EXAGEN AND SMBC V4Appeal Document · PDF2 Jul 2024View
CD10.5 DRAFT STATEMENT OF COMMON GROUND - EXAGEN AND WDC V4Appeal Document · PDF2 Jul 2024View
P21-2535 - CORE DOCUMENTS LIST_DRAFT 24.06.24Appeal Document · PDF2 Jul 2024View
CD1.33 LVIA 25.08.23 PART1Appeal Document · PDF2 Jul 2024View
CD1.34 LVIA 25.08.23 PART2Appeal Document · PDF2 Jul 2024View
CD1.35 LVIA 25.08.23 PART3Appeal Document · PDF2 Jul 2024View
CD1.36 LVIA 25.08.23 PART4Appeal Document · PDF2 Jul 2024View
CD1.37 LVIA 25.08.23 PART5Appeal Document · PDF2 Jul 2024View
CD1.38 LVIA 25.08.23 PART6Appeal Document · PDF2 Jul 2024View
CD1.39 LVIA 25.08.23 PART7Appeal Document · PDF2 Jul 2024View
CD1.40 LVIA 25.08.23 PART8Appeal Document · PDF2 Jul 2024View
CD1.41 LVIA 25.08.23 PART9Appeal Document · PDF2 Jul 2024View
CD1.42 LVIA 25.08.23 PART10Appeal Document · PDF2 Jul 2024View
CD 1.54 SMBC EIA Screening OpinionAppeal Document · PDF2 Jul 2024View
CD 1.55 WDC EIA Screening OpinionAppeal Document · PDF2 Jul 2024View
CD 3.20 Consultation Summary LetterAppeal Document · PDF2 Jul 2024View
CD 3.20 APPENDIX AAppeal Document · PDF2 Jul 2024View
CD 3.20 Appendix BAppeal Document · PDF2 Jul 2024View
CD 3.20 Appendix CAppeal Document · PDF2 Jul 2024View
CD 3.20 Appendix DAppeal Document · PDF2 Jul 2024View
CD 3.20 Appendix EAppeal Document · PDF2 Jul 2024View
CD 6.6 Arden Landscape MapAppeal Document · PDF2 Jul 2024View
CD 6.6 Warwichhire Landscape Guidelines for ArdenAppeal Document · PDF2 Jul 2024View
CD 6.7 SMBC Landscape Character Assessment 2016Appeal Document · PDF2 Jul 2024View
CD 6.8 WDC Net Zero Carbon Supplementary Planning Document (May 2024)Appeal Document · PDF2 Jul 2024View
CD 6.9 WDC Air Quality & Planning Supplementary Planning Document (January 2019Appeal Document · PDF2 Jul 2024View
CD 6.10 WDC Parking Standards Supplementary Planning Document (June 2018)Appeal Document · PDF2 Jul 2024View
CD 7.1 Planning Practice Guidance (Green BeltsAppeal Document · PDF2 Jul 2024View
CD 7.2 Planning Practice Guidance (Renewable and Low Carbon EnergyAppeal Document · PDF2 Jul 2024View
CD 7.4 Visual Representation of Development Proposals (2019) - Landscape InstituAppeal Document · PDF2 Jul 2024View
CD 7.5 An Approach to Landscape Character Assessment (2014) - Natural EnglandAppeal Document · PDF2 Jul 2024View
CD 7.6 An Approach to Landscape Sensitivity Assessment - To Inform Spatial PlannAppeal Document · PDF2 Jul 2024View
CD 7.7 Landscape Institute?s Technical Guidance Note Assessing landscape value oAppeal Document · PDF2 Jul 2024View
CD 7.8 Reviewing Landscape Visual Impact Assessments Technical Guidance NoteAppeal Document · PDF2 Jul 2024View
CD 7.11 UN38.3 Standard Requirements for Lithium Battery Production - 4th RevisiAppeal Document · PDF2 Jul 2024View
CD 7.14 NFCC Grid Scale BESS Planning ? Guidance for FRS dated Nov 2022Appeal Document · PDF2 Jul 2024View
CD 7.15 Factory Mutual Property Loss Prevention Datasheet 5-33 dated Jan 2024Appeal Document · PDF2 Jul 2024View
CD 7.16 Health and Safety Guidance for Grid Scale Electrical Energy Storage SystAppeal Document · PDF2 Jul 2024View
CD 7.23 UN3536 Lithium Batteries installed in Cargo Transport Units dated Jul 20Appeal Document · PDF2 Jul 2024View
CD 7.28 NPPF Dec 2023Appeal Document · PDF2 Jul 2024View
CD 7.29 Joint Green Belt Study 2015Appeal Document · PDF2 Jul 2024View
CD 7.30 Draft NPPF July 2024Appeal Document · PDF2 Jul 2024View
CD 7.31 The Draft NFCC Grid Scale Energy Storage System PlanningAppeal Document · PDF2 Jul 2024View
CD 7.32 Climate Change Act (2050 target amendment) Order 2019Appeal Document · PDF2 Jul 2024View
CD 7.3 Guidelines for Landscape and Visual Impact Assessment (3rd Edition, 2013)Appeal Document · PDF2 Jul 2024View
CD 8.1 Bedford Borough Council v SSCLG & Nuon [2013] EWHC 2847 (Admin). 26th JulAppeal Document · PDF2 Jul 2024View
CD 8.2 R (Forge Field Society) v Sevenoaks District Council [2014] EWHC 1895 (AdAppeal Document · PDF2 Jul 2024View
CD 8.3 Jones v Mordue [2015] EWCA Civ 1243. 3rd December 2015Appeal Document · PDF2 Jul 2024View
CD 8.4 Palmer v Herefordshire Council & Anor [2016] EWCA Civ 1061. 4th NovemberAppeal Document · PDF2 Jul 2024View
CD 8.5 Catesby Estates Ltd. V. Steer [2018] EWCA Civ 1697. 18th July 2018Appeal Document · PDF2 Jul 2024View
CD 8.6 City & Country Bramshill Ltd v Secretary of State for Housing, CommunitieAppeal Document · PDF2 Jul 2024View
CD 8.7 Kay, R (on the application of) v Secretary of State for Housing CommunitiAppeal Document · PDF2 Jul 2024View
CD 8.8 R (Basildon District Council) v First Secretary of State and Temple [2004Appeal Document · PDF2 Jul 2024View
CD 8.9 R (Samuel Smith Old Brewery (Tadcaster) and others) v North Yorkshire CouAppeal Document · PDF2 Jul 2024View
CD 8.10 R. (on the application of William Corbett) Respondent v Cornwall CouncilAppeal Document · PDF2 Jul 2024View
CD 8.11 Bramley Solar Farm Residents Group v SSLUHC & Others [2023] EWHC 2842 15Appeal Document · PDF2 Jul 2024View
CD 8.12 Land north of Halloughton [Appeal ref. APP.B3030.W.21.3279533] allowed oAppeal Document · PDF2 Jul 2024View
CD 8.13 Little Crow DCO (ref. EN010101), approved April 2022Appeal Document · PDF2 Jul 2024View
CD 8.14 Land near to Bishop?s Itchington, Stratford on Avon, Warwickshire, allowAppeal Document · PDF2 Jul 2024View
CD 8.15 Langford, Devon [Appeal ref. APP.Y1138.W.22.3293104], allowed on 5/12/20Appeal Document · PDF2 Jul 2024View
CD 8.16 Chelmsford [Appeal Ref. APP.W1525.W.22.3300222], allowed on 6 February 2Appeal Document · PDF2 Jul 2024View
CD 8.17 Land at Park Farm [Appeal ref. APP.D1265.W.22.3300299], allowed on 13 FeAppeal Document · PDF2 Jul 2024View
CD 8.18 Bramley, Hampshire [Appeal ref. APP.H1705.W.22.3304561], allowed 13th FeAppeal Document · PDF2 Jul 2024View
CD 8.19 South of Murton and north of South Hetton [Appeal ref. APP.X1355.W.22.33Appeal Document · PDF2 Jul 2024View
CD 8.20 Longfield DCO (ref. EN010118) DCO, approved 26 June 2023Appeal Document · PDF2 Jul 2024View
CD 8.21 Land south of Leeming Substation, Scruton , allowed on 27thAppeal Document · PDF2 Jul 2024View
CD 8.21 Costs Decision Land south of Leeming Substation, Scruton dated 27 June 2Appeal Document · PDF2 Jul 2024View
CD 8.22 Land at Crays Hall Farm, Essex Appeal (APP.V1505.W.23.3318171) allowed 3Appeal Document · PDF2 Jul 2024View
CD 8.23 Sherbourne, Warwick Appeal (APP.T3725.W.23.3317247) allowed on 25 SeptemAppeal Document · PDF2 Jul 2024View
CD 8.24 Land to the south and west of Marsh Green (Appeal ref. APP.U1105.W.23.33Appeal Document · PDF2 Jul 2024View
CD 8.25 Land west of Thaxted, Cutlers Green Lane, Thaxted (Appeal ref. APP.C1570Appeal Document · PDF2 Jul 2024View
CD 8.26 Land At Land West Of New Works Lane, Telford, ShropshireAppeal Document · PDF2 Jul 2024View
CD 8.27 Land at Steerway Farm, Limekiln Lane, Wellington, TelfordAppeal Document · PDF2 Jul 2024View
CD 8.28 Land to the South of Hall Lane, Kemberton, Telford (Appeal Ref. APP.L324Appeal Document · PDF2 Jul 2024View
CD 8.29 Canon Barns Road, East Hanningfield, Chelmsford (Appeal ref. APP.W1525.WAppeal Document · PDF2 Jul 2024View
CD 8.30 Land West of Wolverhampton West Primary Substation (Appeal ref. APP.C343Appeal Document · PDF2 Jul 2024View
CD 8.31 Monk Fryston Substation, Rawfield Lane, Monk Fryston, Selby (Appeal ref.Appeal Document · PDF2 Jul 2024View
CD 8.32 Land at Park Farm, Gillingham (Appeal ref. APP.D1265.W.22.3300299) allowAppeal Document · PDF2 Jul 2024View
CD 8.33 Land at Halse Road, south of Greatworth, Northamptonshire APP.W2845.W.23Appeal Document · PDF2 Jul 2024View
CD 8.35 Land North of Little Cheveney Farm (Appeal ref. APP.U2235.W.23.3321094)Appeal Document · PDF2 Jul 2024View
CD 8.36 Land West of Great Wheatley Farm, Great Wheatley Road, Rayleigh (AppealAppeal Document · PDF2 Jul 2024View
CD 8.36 LAND WEST OF GREAT WHEATLEY FARM, GREAT WHEATLEY ROAD, RAYLEIGH COST DECAppeal Document · PDF2 Jul 2024View
CD 8.37 Land to South of Marsh, Fobbing (Appeal ref. APP.M1595.W.23.3328712) allAppeal Document · PDF2 Jul 2024View
CD 8.38 Land At Graveley Lane And To The East Of Great Wymondley (Appeal Ref. APAppeal Document · PDF2 Jul 2024View
CD 8.39 Trustees of the Barker Mills Estates v Test Valley Borough Council [2016Appeal Document · PDF2 Jul 2024View
CD 8.40 (R (Basildon DC) v First Secretary of State and Temple [2004] EWHC 2759)Appeal Document · PDF2 Jul 2024View
CD 8.41 Palmer V Herefordshire Council & ANR 2016Appeal Document · PDF2 Jul 2024View
CD 8.42 R DCLG and Nuon UK Ltd v. Bedford Borough Council. 2013Appeal Document · PDF2 Jul 2024View
CD 8.43 Barnwell Manor Wind Energy Limited ... Barmwell v East NorthamptonshireAppeal Document · PDF2 Jul 2024View
CD 8.44 The Forge Field Society & Ors, R (On the Application Of) v. Sevenoaks DiAppeal Document · PDF2 Jul 2024View
CD 8.45 Mordue v Secretary of State for Communities and Local Government and othAppeal Document · PDF2 Jul 2024View
CD 8.46 Catesby Estates and SSCLG v Steer judgment CoAAppeal Document · PDF2 Jul 2024View
CD 8.47 Monkhill Ltd v SSHCLG [2021] EWCA Civ 74Appeal Document · PDF2 Jul 2024View
CD 8.48 R (Holborn Studios Limited) v The Council of the London Borough of HacknAppeal Document · PDF2 Jul 2024View
CD 8.49 Land adjacent to Harlow Road, Essex (3334690)Appeal Document · PDF2 Jul 2024View
CD 8.50 30MW solar Farm in Cornwall, reference APP.D0840.W.23.333465Appeal Document · PDF2 Jul 2024View
CD 8.51 Honiley Road Solar Farm (appeal reference APP.T3725.V.23.3332671Appeal Document · PDF2 Jul 2024View
CD 9.0 Solihull Metropolitan Borough Council Climate Change Emergency StatementAppeal Document · PDF2 Jul 2024View
CD 9.1 Solihull Metropolitan Borough Council Net Zero Action Plan, November 2021Appeal Document · PDF2 Jul 2024View
CD 9.2 A Warwick District Council Climate Emergency Action ProgramAppeal Document · PDF2 Jul 2024View
CD 9.2A WDC Climate Change Action Programme ? Appendix 1 Ambition 1, November 20Appeal Document · PDF2 Jul 2024View
CD 9.3 WDC Climate Change Action Programme ? Appendix Ambition 2, November 2021Appeal Document · PDF2 Jul 2024View
CD 9.4 WDC Climate Change Adaption Plan 2023Appeal Document · PDF2 Jul 2024View
CD 9.5 West Midlands Combined Authority Five Year Plan 2021-2026 ? Executive SumAppeal Document · PDF2 Jul 2024View
CD 9.6 National Policy Statement for renewable energy infrastructure EN-3, NovemAppeal Document · PDF2 Jul 2024View
CD 9.7 Renewable Energy Planning DatabaseAppeal Document2 Jul 2024View
CD 9.8 BEIS - 2020-final-greenhouse-gas-emissions-statistical-releaseAppeal Document · PDF2 Jul 2024View
CD 9.9 Heysham 2 and Torness end dates brought forward by EDFAppeal Document · PDF2 Jul 2024View
CD 9.10 EDF revises Hinkley Point C schedule and costsAppeal Document · PDF2 Jul 2024View
CD 9.11 Electricity-Generation-Cost-Report_2020_BEISAppeal Document · PDF2 Jul 2024View
CD 9.12 Electricity-Generation-Cost Report_2020_BEIS_GC20_Key_Data_and_AssumptioAppeal Document2 Jul 2024View
CD 9.13 Industrial_Decarbonisation_Strategy_March_2021Appeal Document · PDF2 Jul 2024View
CD 9.14 CCC-Reducing-UK-emissions-Prog-Rpt-to-Parliament-2020-06-25Appeal Document · PDF2 Jul 2024View
CD 9.15 CCC Progress-in-reducing-emissions-2021-Report-to-ParliamentAppeal Document · PDF2 Jul 2024View
CD 9.16 Progress-in-reducing-emissions-2022-Report-to-ParliamentAppeal Document · PDF2 Jul 2024View
CD 9.17 Progress-in-reducing-emissions-2022-Report-to-Parliament-Charts-and-dataAppeal Document2 Jul 2024View
CD 9.18 Progress-in-reducing-emissions-2023-Report-to-ParliamentAppeal Document · PDF2 Jul 2024View
CD 9.19 Guardian - Sizewell C may cost double government estimates and take fiveAppeal Document · PDF2 Jul 2024View
CD 9.20 IPCC_AR6_WGIII_SummaryForPolicymakersAppeal Document · PDF2 Jul 2024View
CD 9.21 BEIS - Energy Trends_6.1_JUN_23Appeal Document · PDF2 Jul 2024View
CD 9.22 National Grid UK Future Energy Scenarios 2012Appeal Document · PDF2 Jul 2024View
CD 9.23 UK-Future Energy Scenarios 2013Appeal Document · PDF2 Jul 2024View
CD 9.24 UK Future Energy Scenarios 2014Appeal Document · PDF2 Jul 2024View
CD 9.26 Future Energy Scenarios 2016Appeal Document · PDF2 Jul 2024View
CD 9.27 Future Energy Scenarios 2017Appeal Document · PDF2 Jul 2024View
CD 9.28 Future Energy Scenarios 2018Appeal Document · PDF2 Jul 2024View
CD 9.29 Future Energy Scenarios 2019Appeal Document · PDF2 Jul 2024View
CD 9.30 735442 Future Energy Scenarios 2020Appeal Document · PDF2 Jul 2024View
CD 9.31 736199 FUTURE ENERGY SCENARIOS 2021Appeal Document · PDF2 Jul 2024View
CD 9.32 Future Energy Scenarios 2022Appeal Document · PDF2 Jul 2024View
CD 9.33 Future Energy Scenarios 2023Appeal Document · PDF2 Jul 2024View
CD 9.34 UK Gov Prime Ministers FT ArticleAppeal Document · PDF2 Jul 2024View
CD 9.35 UK Government?s Press Release of Acceleration of Carbon Reduction to 203Appeal Document · PDF2 Jul 2024View
CD 9.36 National Infrastructure Strategy ReportAppeal Document · PDF2 Jul 2024View
CD 9.37 UK Fossil Fuel Use at an All-time Low Over Christmas 2021Appeal Document · PDF2 Jul 2024View
CD 9.38 UK Hydrogen StrategyAppeal Document · PDF2 Jul 2024View
CD 9.40 Subnational Total Final Energy Consumption 2020Appeal Document2 Jul 2024View
CD 9.39 Subnational Electricity Consumption Statistics 2005-2022Appeal Document2 Jul 2024View
CD 9.41 Renewable Electricity by Local Authority 2014-2022Appeal Document · PDF2 Jul 2024View
CD 9.42 Skidmore Mission Zero Independent ReviewAppeal Document · PDF2 Jul 2024View
CD 9.43 Overarching NPS for Energy EN-1, November 2023Appeal Document · PDF2 Jul 2024View
CD 9.44 ESC Innovating to Net Zero ReportAppeal Document · PDF2 Jul 2024View
CD 9.45 The Ten Point Plan for a Green Industrial RevolutionAppeal Document · PDF2 Jul 2024View
CD 9.46 Energy White Paper - Powering our Net Zero FutureAppeal Document · PDF2 Jul 2024View
CD 9.48 PM - A New Deal for BritainAppeal Document · PDF2 Jul 2024View
CD 9.49 Roger Harrabin - Ban on new petrol and diesel cars in UK by 2030 under PAppeal Document · PDF2 Jul 2024View
CD 9.50 Alice Grundy - CurrentPlus_More_BEV_Mar-22_than_2019Appeal Document · PDF2 Jul 2024View
CD 9.51 Taking-charge-the-electric-vehicle-infrastructure-strategy March 2022Appeal Document · PDF2 Jul 2024View
CD 9.52 British Energy Security Strategy, April 2022Appeal Document · PDF2 Jul 2024View
CD 9.53 NIC Net-Zero-Opportunities for the Power SectoAppeal Document · PDF2 Jul 2024View
CD 9.54 EY Consulting Power Market Outlook - Select Slides - May 2022Appeal Document · PDF2 Jul 2024View
CD 9.55 The-Sixth-Carbon-Budget-The-UKs-path-to-Net-ZeroAppeal Document · PDF2 Jul 2024View
CD 9.56 Digest of United Kingdom Energy Statistics (July 2024 Edition)Appeal Document · PDF2 Jul 2024View
CD 9.57 HM Government, Powering Up Britain, March 2023, Joint OverviewAppeal Document · PDF2 Jul 2024View
CD 9.58 HM Government Powering Up Britain March 2023 Responding to Independent RAppeal Document · PDF2 Jul 2024View
CD 9.59 HM Government, Powering Up Britain, March 2023, Responding to CCC AnnualAppeal Document · PDF2 Jul 2024View
CD 9.60 HM Government, Powering Up Britain, March 2023, Net Zero Growth Plan.Appeal Document · PDF2 Jul 2024View
CD 9.62 Climate Change Act (as amended in 2019)Appeal Document · PDF2 Jul 2024View
CD 9.63 Achieving Net Zero ? National Audit Office Report December 2020Appeal Document · PDF2 Jul 2024View
CD 9.64 Energy Security Plan (ESP)Appeal Document · PDF2 Jul 2024View
CD 9.65 ?Net Zero Strategy Build Back Greener published by the UK Government inAppeal Document · PDF2 Jul 2024View
CD 9.66 IPCC, 2023 Summary for Policymakers. In Climate Change 2023 Synthesis ReAppeal Document · PDF2 Jul 2024View
CD 9.67 UK's Plans and Progress to Reach Net Zero by 2050 November 2023Appeal Document · PDF2 Jul 2024View
CD 9.68 UK Government Solar Strategy 2014Appeal Document · PDF2 Jul 2024View
CD 9.69 Written Ministerial Statement on Solar Energy protecting the local and gAppeal Document · PDF2 Jul 2024View
CD 9.70 Written Ministerial Statement on Solar and protecting our food securityAppeal Document · PDF2 Jul 2024View
CD 9.71 UK Energy Statistics Press Release published by the Department for BusinAppeal Document · PDF2 Jul 2024View
CD 9.72 The Climate Crisis A Guide for Local Authorities on Planning for ClimateAppeal Document · PDF2 Jul 2024View
CD 9.73 The Clean Growth StrategyAppeal Document · PDF2 Jul 2024View
CD 9.74 Net Zero Strategy Build Back Greener (October 2021)Appeal Document · PDF2 Jul 2024View
CD 9.75 The Glasgow Climate Pact (November 2021)Appeal Document · PDF2 Jul 2024View
CD 9.76 House of Commons Environmental Audit Committee Accelerating the TransitiAppeal Document · PDF2 Jul 2024View
CD 9.77 Environmental Audit Committee - Technological Innovations and Climate ChAppeal Document · PDF2 Jul 2024View
CD 9.79 UK Parliament declared an Environmental and Climate Change Emergency 1stAppeal Document · PDF2 Jul 2024View
CD 9.80 The Government?s Carbon Budget Delivery Plan (March 2023)Appeal Document · PDF2 Jul 2024View
CD 9.81 The COP21 UN Paris AgreementAppeal Document · PDF2 Jul 2024View
CD 9.85 IPCC AR6 Synthesis Report (March 2023)Appeal Document · PDF2 Jul 2024View
CD 9.86 The UK?s Sixth Carbon Budget The UK?s Path to Net Zero (December 2020)Appeal Document · PDF2 Jul 2024View
CD 9.87 Department for Business, Energy and Industrial Strategy (BEIS) Outcome DAppeal Document · PDF2 Jul 2024View
CD 9.88 The Ten Point Plan for a Green Industrial Revolution (2020)Appeal Document · PDF2 Jul 2024View
CD 9.89 Industrialisation Decarbonisation Strategy (2021)Appeal Document · PDF2 Jul 2024View
CD 9.90 Climate Change 2023 Synthesis ReportAppeal Document · PDF2 Jul 2024View
CD 9.91 State of Nature Partnership 2023 reportAppeal Document · PDF2 Jul 2024View
CD 9.84 IPCC Third AR6 Report (April 2022)_Part1Appeal Document · PDF2 Jul 2024View
CD 9.84 IPCC Third AR6 Report (April 2022)_Part2Appeal Document · PDF2 Jul 2024View
Core Documents List V3/links to some documentsAppeal Document · PDF2 Jul 2024View
APPEAL FORMAppeal Document · PDF1 Jul 2024View
Delegated ReportReport · PDF23 Apr 2024View
Decision Notice or LetterDecision · PDF23 Apr 2024View
CAROL BANKS - SPRINGHILL HOUSE, - OBJECTIONObjection Comment · PDF25 Mar 2024View
Decision - LAND AT GRAVELEY LANE - APPLICATION REF: 21/03380/FPSupporting Report · PDF19 Mar 2024View
Appeal Decision - Rawfield Lane, Fairburn, Selby - Appeal Ref: APP/N2739/W/22/33Supporting Report · PDF19 Mar 2024View
APPEAL DECISION - LAND OFF COLDMOORHOLME LANE - APPEAL REF: APP/K0425/W/22/32947Supporting Report · PDF19 Mar 2024View
APPEAL DECISION - BATTLESBRIDGE, RETTENDON - APPEAL REF: APP/W1525/W/22/3306710Supporting Report · PDF19 Mar 2024View
Appeal decision Land South of Monk Fryston SubstationSupporting Report · PDF19 Mar 2024View
Appendices for Planning Statement and Green Belt AssessmentSupporting Report · PDF14 Mar 2024View
Addendum for Planning Statement and Green Belt AssessmentSupporting Report · PDF14 Mar 2024View
Cover email with attachment from WCC Flood Risk AssessmentCase Correspondence · PDF7 Mar 2024View
WCC FLOOD RISK MANAGEMENT - NO OBJECTION COMMENTConsultation Response · PDF7 Mar 2024View
Landscape Mitigation Plan Sheet 2 of 2Drawing · PDF26 Feb 2024View
WCC Landscape CommentConsultation Response · PDF22 Feb 2024View
cover email with attachment from WCC LandscapeConsultation Response · PDF22 Feb 2024View
Technical Information Note: Drainage (February 2024)Supporting Report · PDF14 Feb 2024View
INDICATIVE_SITE_DESIGN_SECTION_DETAILRevised Drawing · PDF2 Feb 2024View
EXISTING_LEVELS_&_PROPOSED_INFRASTRUCTRE.Drawing · PDF1 Feb 2024View
INDICATIVE_PLATFORM_LEVELS_&_INFRASTRUCTRE.Drawing · PDF1 Feb 2024View
Site Layout Plan FullSite Location Plan · PDF1 Feb 2024View
Site Layout Plan BESS and Substation.Drawing · PDF1 Feb 2024View
. BESS and Substation Elevations Summary Plan.Drawing · PDF1 Feb 2024View
Typical DNO Control Room.Drawing · PDF1 Feb 2024View
Typical Ancillary Substation BuildingDrawing · PDF1 Feb 2024View
NOTE FROM METRICA ENVIRONMENTAL CONSULTING - NOISE RESPONSESupporting Report · PDF1 Feb 2024View
LLFA Comment Response v2.Supporting Report · PDF12 Jan 2024View
WCC Ecology - CommentsConsultation Response · PDF15 Dec 2023View
Response from Warwickshire Fire and Rescue Service-Consultation Response · PDF15 Dec 2023View
cover email with attachment from WCC Highways AuthorityCase Correspondence · PDF9 Dec 2023View
WCC Highways Authority - CommentsConsultation Response · PDF9 Dec 2023View
Additional neighbour commentsCase Correspondence · PDF27 Nov 2023View
CAROL BANKS -- OBJECTIONObjection Comment · PDF27 Nov 2023View
WATER OFFICER-BEDWORTH FIRE STATION-NEUTRALConsultation Response · PDF14 Nov 2023View
Mr Nilam Shergill-Objects-Rudfyn Manor Birmingham Road Kenilworth(FULL)Objection Comment · PDF14 Nov 2023View
Biodiversity Metric 4.0 Calculation ToolSupporting Report8 Nov 2023View
Holy lane energy parkSupporting Report8 Nov 2023View
Holy lane energy park- Solar park onlySupporting Report8 Nov 2023View
Email with attached docsCase Correspondence · PDF8 Nov 2023View
Conservation No Objection CommentsConsultation Response · PDF7 Nov 2023View
Mrs Amanda Critchley-Objects-Willows Farm Orton Road, Warton Tamworth(FULL)Objection Comment · PDF1 Nov 2023View
Dr Bhupinder Bains-Objects-RUDFYN MANOR BIRMINGHAM ROAD KENILWORTH(FULL)Objection Comment · PDF31 Oct 2023View
J F BAMPTON - 2 PINE TREE AVENUE - OBJECTIONObjection Comment · PDF30 Oct 2023View
Carol Banks - ObjectionObjection Comment · PDF30 Oct 2023View
Ms Elaine Bettger-Neutral-Rights of Way - Warwickshire County Council, Shire HalGeneral Comment · PDF25 Oct 2023View
cover email with attachment from WCC LandscapeCase Correspondence · PDF25 Oct 2023View
WCC Landscape - CommentsConsultation Response · PDF25 Oct 2023View
Cover email with attachment from Environment AgencyCase Correspondence · PDF25 Oct 2023View
Environment Agency - CommentsConsultation Response · PDF25 Oct 2023View
cover email with attachment from WCC Flood Risk ManagementCase Correspondence · PDF23 Oct 2023View
WCC Flood Risk Management - Objection CommentsConsultation Response · PDF23 Oct 2023View
Mr David Banks-Objects-The Farmhouse, Fen End Farm Oldwich Lane East Kenilworth(Objection Comment · PDF21 Oct 2023View
Mrs Emily Banks-Objects-The Farmhouse, Fen End Farm, Oldwich Lane East, KenilworObjection Comment · PDF21 Oct 2023View
KENILWORTH TOWN COUNCIL ? COMMENTSConsultation Response · PDF20 Oct 2023View
SOLIHULL METROPOLITAN BOROUGH COUNCIL-COMMENTSConsultation Response · PDF18 Oct 2023View
Health and Community Protection - CommentsConsultation Response · PDF11 Oct 2023View
Tree Officer - No CommentsConsultation Response · PDF10 Oct 2023View
HLRP Geophysical Survey v3Supporting Report · PDF6 Oct 2023View
Noise Impact AssessmentSupporting Report · PDF25 Sept 2023View
Application FormApplication Form · PDF14 Sept 2023View
Arboricultural Impact AssessmentSupporting Report · PDF14 Sept 2023View
Agricultural Land Classification ReportSupporting Report · PDF14 Sept 2023View
Covering Letter (WDC)Case Correspondence · PDF14 Sept 2023View
Construction Traffic Management PlanSupporting Report · PDF14 Sept 2023View
Design Access Statement_FINAL LR.Supporting Report · PDF14 Sept 2023View
Ecological Impact AssessmentSupporting Report · PDF14 Sept 2023View
Flood Risk Assessment and Drainage StrategySupporting Report · PDF14 Sept 2023View
Planning Statement.Supporting Report · PDF14 Sept 2023View
Outline Battery Safety Management PlanSupporting Report · PDF14 Sept 2023View
SUPERSEDED - NOISE IMPACT ASSESSMENTSupporting Report · PDF14 Sept 2023View
Heritage Statement_Supporting Report · PDF14 Sept 2023View
Glint and Glare AssessmentSupporting Report · PDF14 Sept 2023View
Landscape and Visual Impact Assessment Part 1Supporting Report · PDF14 Sept 2023View
Landscape and Visual Impact Assessment Part 10Supporting Report · PDF14 Sept 2023View
Landscape and Visual Impact Assessment Part 2Supporting Report · PDF14 Sept 2023View
Landscape and Visual Impact Assessment Part 3Supporting Report · PDF14 Sept 2023View
Landscape and Visual Impact Assessment Part 4Supporting Report · PDF14 Sept 2023View
Landscape and Visual Impact Assessment Part 5Supporting Report · PDF14 Sept 2023View
Landscape and Visual Impact Assessment Part 6Supporting Report · PDF14 Sept 2023View
Landscape and Visual Impact Assessment Part 7Supporting Report · PDF14 Sept 2023View
Landscape and Visual Impact Assessment Part 8Supporting Report · PDF14 Sept 2023View
Landscape and Visual Impact Assessment Part 9Supporting Report · PDF14 Sept 2023View
Typical 33kV Transformer.Drawing · PDF14 Sept 2023View
33kV Cable Connection and Control RoomDrawing · PDF14 Sept 2023View
Solar Fence and CCTVDrawing · PDF14 Sept 2023View
Solar Panel. cross section planDrawing · PDF14 Sept 2023View
Switchgear. planDrawing · PDF14 Sept 2023View
BESS CCTV and LightingDrawing · PDF14 Sept 2023View
AUX Transformer planDrawing · PDF14 Sept 2023View
RMU and Control Enclosures. planDrawing · PDF14 Sept 2023View
Grid Transformer. planDrawing · PDF14 Sept 2023View
Substation Building.planDrawing · PDF14 Sept 2023View
MV Inverter.planDrawing · PDF14 Sept 2023View
Battery Unit. planDrawing · PDF14 Sept 2023View
SUPERSEDED - BESS_SUBSTATION.PLANDrawing · PDF14 Sept 2023View
Solar Farm- Site Layout PlanDrawing · PDF14 Sept 2023View
Whole Site Layout planDrawing · PDF14 Sept 2023View
SUPERSEDED- SITE LOCATION PLAN.1:10000Site Location Plan · PDF14 Sept 2023View
HollyLane-Proposal-Overview-A4-230912Supporting Report · PDF14 Sept 2023View
Energy Park only - BIODIVERSITY NET GAIN ? DESIGN STAGE REPORTSupporting Report · PDF14 Sept 2023View
Energy Park only - BIODIVERSITY NET GAIN ? DESIGN STAGE REPORTSupporting Report · PDF14 Sept 2023View
Energy Park only - BIODIVERSITY NET GAIN ? DESIGN STAGE REPORT(BESS/PoC only)Supporting Report · PDF14 Sept 2023View
Site Selection Justification ReportSupporting Report · PDF14 Sept 2023View
Statement of Community Engagement Part 3Supporting Report · PDF14 Sept 2023View
Statement of Community Engagement Part 2Supporting Report · PDF14 Sept 2023View
Statement of Community Engagement Part 1Supporting Report · PDF14 Sept 2023View
Substation Fence and Access planDrawing · PDF13 Sept 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Last Advertised In Press Date

    Published milestoneCouncil source
  6. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Standard Consultation Date

    Published milestoneCouncil source
  11. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Decision Issued Date

    Published milestoneCouncil source
  13. Decision Made Date

    Published milestoneCouncil source
  14. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Refuse
Doc MAN - Decision Noticie - MA Doc MAN - Decision Noticie - MA Appeal Decision CD4.1 SMBC DECISION NOTICE - 2039579 CD5.1 WDC DECISION NOTICE CD 8.21 Costs Decision Land south of Leeming Substation, Scruton dated 27 June 2 Decision Notice or Letter Decision - LAND AT GRAVELEY LANE - APPLICATION REF: 21/03380/FP Appeal Decision - Rawfield Lane, Fairburn, Selby - Appeal Ref: APP/N2739/W/22/33 APPEAL DECISION - LAND OFF COLDMOORHOLME LANE - APPEAL REF: APP/K0425/W/22/32947 APPEAL DECISION - BATTLESBRIDGE, RETTENDON - APPEAL REF: APP/W1525/W/22/3306710 Appeal decision Land South of Monk Fryston Substation
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.