Construction and operation of a green hydrogen production and distribution facility, including electrolyser building, compressor building, control room and workshop, along with supporting plant and equipment, together with supporting infrastructure including hydrogen offtake pipeline, utility corridor for laydown of water and wastewater connections, and laydown area for construction works, on site of former Ferrybridge C Power Station, Ferrybridge, West Yorkshire.
Ferrybridge C Power Station Stranglands Lane Knottingley WF11 8RA
Construction and operation of a green hydrogen production and distribution facility, including electrolyser building, compressor building, control room and workshop, along with supporting plant and equipment, together with supporting infrastructure including hydrogen offtake pipeline, utility corridor for laydown of water and wastewater connections, and laydown area for construction works, on site of former Ferrybridge C Power Station, Ferrybridge, West Yorkshire.
Reference
25/01308/FUL
Alternative references
PP-14085267
Ward
Knottingley
Agent
SSE Thermal
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.