Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Land at Bridge Farm Quarry, Bridge Farm Quarry, Sutton Courtenay, OX14 4PP
Last published check: 11 Oct 2026, 05:56. Check the council record for more recent changes.
Land at Bridge Farm Quarry, Bridge Farm Quarry, Sutton Courtenay, OX14 4PP
This record has no verified map location.
Section 73 application to continue the development permitted by planning permission no. MW.0067/22 (P22/V1444/CM) (for small extension to Bridge Farm Quarry to extract sand and gravel and restoration to agriculture and lakes with reed fringes) without complying with conditions 1 (approved documents) and 2 (restoration end date) to vary the restoration and aftercare schemes and extend the date for completion of the final restoration.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| ApplicationFormApplication Form | Not published | View |
| S55m217 (Bridge Farm and River Fields - Revised Landscaping and Aftercare Scheme) (1)General Plan | Not published | View |
| S55m209 (Bridge Farm and River Fields - Revised Restoration Design - NMA)General Plan | Not published | View |
| S55m-227 REVISED RESTORATION DESIGN WITH PROPOSED BRIDGEGeneral Plan | Not published | View |
| S55m-217b REVISED RESTORATION AND AFTERCARE PLANGeneral Plan | Not published | View |
| S3-HAN-14-22A Scheme of Working Stage 2General Plan | Not published | View |
| S3-HAN-13-3-2B CONDITION 19 Outfall from Existing Site Into Phase 7B LakeGeneral Plan | Not published | View |
| Drawing no. S3 HAN 13 3 1 Condition 19 - Outfall from Phase 6 Lake to Sutton Courtenay BrookGeneral Plan | Not published | View |
| Drawing no. S3 HAN 13 10 Condition 19 - Details of Outfall Channel from Phase 7B Lake to the River ThamesGeneral Plan | Not published | View |
| S3-HAN-14-28B Cross Section - Sheet 2General Plan | Not published | View |
| Condition 19 - Location of Proposed Outfall Channels, drawing no.General Plan | Not published | View |
| Specification for Boundary Fencing - Barbed Wire Plan Drawing no. FDS-6 (condition 15)General Plan | Not published | View |
| S55m217 (Bridge Farm and River Fields - Revised Landscaping and Aftercare Scheme)General Plan | Not published | View |
| S55m-227-2B BELLMOUTH OPTIONGeneral Plan | Not published | View |
| S3-HAN-14-27B Cross Section - Sheet 1General Plan | Not published | View |
| S3-HAN-14-25B Scheme of Working Stage 5General Plan | Not published | View |
| S3-HAN-14-21A Scheme of Working Stage 1General Plan | Not published | View |
| Prev Application Plan - Drawing No. S3 HAN 10 28 dated 12 08 2016(1)General Plan | Not published | View |
| Prev Application Plan - Drawing No. S3 HAN 10 28 dated 12 08 2016General Plan | Not published | View |
| Extent of Existing Arable Areas, Stand Offs and Buffers drawing no. S3 HAN 14 31 dated 19.03.19General Plan | Not published | View |
| Specification for Boundary Fencing - Barbed Wire Plan Drawing no. FDS-6 (condition 15)(1)General Plan | Not published | View |
| S3-HAN-14-30 Unworked Land Adjacent To Water CourseGeneral Plan | Not published | View |
| S55m-227-1B FALLBACK OPTIONGeneral Plan | Not published | View |
| Condition 19 - Lake Level control mechanism between Western and Eastern lakes in Phase 7 drawing no.General Plan | Not published | View |
| S55m209 (Bridge Farm and River Fields - Revised Restoration Design - NMA) (2)General Plan | Not published | View |
| S3-HAN-14-26B Scheme of Working Stage 6General Plan | Not published | View |
| S3-HAN-13-3-4A Condition 19- Outfall From Phase 7B Lake Into The River ThamesGeneral Plan | Not published | View |
| S3-HAN-14-23A Scheme of Working Stage 3General Plan | Not published | View |
| Drawing no. S3 HAN 13 10 Condition 19 - Details of Outfall Channel from Phase 7B Lake to the River Thames(1)General Plan | Not published | View |
| Drawing no. S3 HAN 13 4 Condition 19 - Outfall Ditch, Culvert and Sluice Layout(1)General Plan | Not published | View |
| Buffer Zones to Watercourses, Trees Plan - Drawing no. S3 HAN 13 2 (condition 15)General Plan | Not published | View |
| S3-HAN-14-24A Scheme of Working Stage 4General Plan | Not published | View |
| Drawing no. S3 HAN 13 4 Condition 19 - Outfall Ditch, Culvert and Sluice LayoutGeneral Plan | Not published | View |
| Further Information - Applied Ecology Ltd Technical Ecology Report Version 3 datedSupporting documentation | Not published | View |
| E-mail from Julia Edwards dated 26th July 2018 (conditions 41 and 42).Supporting documentation | Not published | View |
| Br Fm Ext Variation amended phasing letter- May 2019Supporting documentation | Not published | View |
| Approved Phases 6 & 7 Written Scheme of Investigation for an Archaeological Watching Brief (condition 22)(1)Supporting documentation | Not published | View |
| Amended covering Letter 15.12.25Supporting documentation | Not published | View |
| Prev -Application Form dated 15 09 2016Supporting documentation | Not published | View |
| Planning Supporting Statement - Bridge Farm quarry, Sutton CourtenaySupporting documentation | Not published | View |
| Further Information - Letter from Corylus dated 30 03 2017Supporting documentation | Not published | View |
| Feb 24 update of River fields landscaping and aftercare scheme (002)Supporting documentation | Not published | View |
| Approved Phases 6 & 7 Written Scheme of Investigation for an Archaeological Watching Brief (condition 22)Supporting documentation | Not published | View |
| Approved Phase 5 Written Scheme of Investigation Archaeological Excavation (condition 22)Supporting documentation | Not published | View |
| ApplicationForm(1)Supporting documentation | Not published | View |
| PRev Further Information to address feedback from EA regarding re-location of an overflowtrench as required by Network Rail Version 1 dateSupporting documentation | Not published | View |
| PRev Further Information - Soils and land quality Version 1 dated 23 01 2017Supporting documentation | Not published | View |
| MW ADVERT MW.0003-26Supporting documentation | Not published | View |
| Method Statement for the protection of woodland, trees, hedgerows, the River Thames and Sutton Courtenay Brook (Revised 11.07.18) (conditiSupporting documentation | Not published | View |
| Condition 16 Method Statement dated July 2017(1)Supporting documentation | Not published | View |
| PRev Further Information - Applied Ecology Ltd Otter Report Version 1 dated 30 03 2017Supporting documentation | Not published | View |
| Prev -Dust Control Scheme dated 10 07 07Supporting documentation | Not published | View |
| DP 004819 006722 V4Supporting documentation | Not published | View |
| DSupporting documentation | Not published | View |
| Method Statement for the protection of woodland, trees, hedgerows, the River Thames and Sutton Courtenay Brook (Revised 11.07.18) (conditi(1)Supporting documentation | Not published | View |
| Approved Phase 5 Written Scheme of Investigation Archaeological Excavation (condition 22)(1)Supporting documentation | Not published | View |
| Amended Planning Statement 15.12.25Supporting documentation | Not published | View |
| PRev Further Information to address feedback from EA Version 1 dated 16 01 2017Supporting documentation | Not published | View |
| Prev -Further Information - Flood Storage Capacity Volume Comparison Version 5 datedSupporting documentation | Not published | View |
| Further Information - Applied Ecology Ltd Technical Ecology Report Version 3 dated(2)Supporting documentation | Not published | View |
| Condition 16 Method Statement dated July 2017Supporting documentation | Not published | View |
| 931 Sutton Courtney Drainage Addendum v2i 20251007Supporting documentation | Not published | View |
| M&W AGENTS LETTER MW.0003-26Supporting documentation | Not published | View |
| Decision notice MW.0067-22Supporting documentation | Not published | View |
| B25 078 Sutton Courtney-Ecology ReportSupporting documentation | Not published | View |
| Update Ecology Survey Report by Applied Ecology dated March 2019Supporting documentation | Not published | View |
| Article 13 NoticeSupporting documentation | Not published | View |
| Application FormSupporting documentation | Not published | View |
| 250924 s73 Landscape and Visual Report-FINALSupporting documentation | Not published | View |
| Bridge Farm PP-14394569 -Departure FormSupporting documentation | Not published | View |
| Bridge Farm PP-14394569 - EIA FormSupporting documentation | Not published | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.