Council planning record

Section 73 application to continue the development permitted by planning permission no. MW.0067/22 (P22/V1444/CM) (for small extension to Bridge Farm Quarry to extract sand and gravel and restoration to agriculture and lakes with reed fringes) without complying with conditions 1 (approved documents) and 2 (restoration end date) to vary the restoration and aftercare schemes and extend the date for completion of the final restoration.

Land at Bridge Farm Quarry, Bridge Farm Quarry, Sutton Courtenay, OX14 4PP

Decision MadeReference: P26/V0075/CMVale of White Horse District Council

Last published check: 11 Oct 2026, 05:56. Check the council record for more recent changes.

Application location

Land at Bridge Farm Quarry, Bridge Farm Quarry, Sutton Courtenay, OX14 4PP

This record has no verified map location.

Application summary

Status
Decision Made
Application type
Not published
Received
9 Jan 2026
Validated
Not published
Determination deadline
Not published
Local authority
Vale of White Horse District Council

Application overview

Section 73 application to continue the development permitted by planning permission no. MW.0067/22 (P22/V1444/CM) (for small extension to Bridge Farm Quarry to extract sand and gravel and restoration to agriculture and lakes with reed fringes) without complying with conditions 1 (approved documents) and 2 (restoration end date) to vary the restoration and aftercare schemes and extend the date for completion of the final restoration.

Proposal details

Reference
P26/V0075/CM
Agent
Corylus Planning & Environmental Limited

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 71 of 71

DocumentPublishedAction
ApplicationFormApplication FormNot publishedView
S55m217 (Bridge Farm and River Fields - Revised Landscaping and Aftercare Scheme) (1)General PlanNot publishedView
S55m209 (Bridge Farm and River Fields - Revised Restoration Design - NMA)General PlanNot publishedView
S55m-227 REVISED RESTORATION DESIGN WITH PROPOSED BRIDGEGeneral PlanNot publishedView
S55m-217b REVISED RESTORATION AND AFTERCARE PLANGeneral PlanNot publishedView
S3-HAN-14-22A Scheme of Working Stage 2General PlanNot publishedView
S3-HAN-13-3-2B CONDITION 19 Outfall from Existing Site Into Phase 7B LakeGeneral PlanNot publishedView
Drawing no. S3 HAN 13 3 1 Condition 19 - Outfall from Phase 6 Lake to Sutton Courtenay BrookGeneral PlanNot publishedView
Drawing no. S3 HAN 13 10 Condition 19 - Details of Outfall Channel from Phase 7B Lake to the River ThamesGeneral PlanNot publishedView
S3-HAN-14-28B Cross Section - Sheet 2General PlanNot publishedView
Condition 19 - Location of Proposed Outfall Channels, drawing no.General PlanNot publishedView
Specification for Boundary Fencing - Barbed Wire Plan Drawing no. FDS-6 (condition 15)General PlanNot publishedView
S55m217 (Bridge Farm and River Fields - Revised Landscaping and Aftercare Scheme)General PlanNot publishedView
S55m-227-2B BELLMOUTH OPTIONGeneral PlanNot publishedView
S3-HAN-14-27B Cross Section - Sheet 1General PlanNot publishedView
S3-HAN-14-25B Scheme of Working Stage 5General PlanNot publishedView
S3-HAN-14-21A Scheme of Working Stage 1General PlanNot publishedView
Prev Application Plan - Drawing No. S3 HAN 10 28 dated 12 08 2016(1)General PlanNot publishedView
Prev Application Plan - Drawing No. S3 HAN 10 28 dated 12 08 2016General PlanNot publishedView
Extent of Existing Arable Areas, Stand Offs and Buffers drawing no. S3 HAN 14 31 dated 19.03.19General PlanNot publishedView
Specification for Boundary Fencing - Barbed Wire Plan Drawing no. FDS-6 (condition 15)(1)General PlanNot publishedView
S3-HAN-14-30 Unworked Land Adjacent To Water CourseGeneral PlanNot publishedView
S55m-227-1B FALLBACK OPTIONGeneral PlanNot publishedView
Condition 19 - Lake Level control mechanism between Western and Eastern lakes in Phase 7 drawing no.General PlanNot publishedView
S55m209 (Bridge Farm and River Fields - Revised Restoration Design - NMA) (2)General PlanNot publishedView
S3-HAN-14-26B Scheme of Working Stage 6General PlanNot publishedView
S3-HAN-13-3-4A Condition 19- Outfall From Phase 7B Lake Into The River ThamesGeneral PlanNot publishedView
S3-HAN-14-23A Scheme of Working Stage 3General PlanNot publishedView
Drawing no. S3 HAN 13 10 Condition 19 - Details of Outfall Channel from Phase 7B Lake to the River Thames(1)General PlanNot publishedView
Drawing no. S3 HAN 13 4 Condition 19 - Outfall Ditch, Culvert and Sluice Layout(1)General PlanNot publishedView
Buffer Zones to Watercourses, Trees Plan - Drawing no. S3 HAN 13 2 (condition 15)General PlanNot publishedView
S3-HAN-14-24A Scheme of Working Stage 4General PlanNot publishedView
Drawing no. S3 HAN 13 4 Condition 19 - Outfall Ditch, Culvert and Sluice LayoutGeneral PlanNot publishedView
Further Information - Applied Ecology Ltd Technical Ecology Report Version 3 datedSupporting documentationNot publishedView
E-mail from Julia Edwards dated 26th July 2018 (conditions 41 and 42).Supporting documentationNot publishedView
Br Fm Ext Variation amended phasing letter- May 2019Supporting documentationNot publishedView
Approved Phases 6 & 7 Written Scheme of Investigation for an Archaeological Watching Brief (condition 22)(1)Supporting documentationNot publishedView
Amended covering Letter 15.12.25Supporting documentationNot publishedView
Prev -Application Form dated 15 09 2016Supporting documentationNot publishedView
Planning Supporting Statement - Bridge Farm quarry, Sutton CourtenaySupporting documentationNot publishedView
Further Information - Letter from Corylus dated 30 03 2017Supporting documentationNot publishedView
Feb 24 update of River fields landscaping and aftercare scheme (002)Supporting documentationNot publishedView
Approved Phases 6 & 7 Written Scheme of Investigation for an Archaeological Watching Brief (condition 22)Supporting documentationNot publishedView
Approved Phase 5 Written Scheme of Investigation Archaeological Excavation (condition 22)Supporting documentationNot publishedView
ApplicationForm(1)Supporting documentationNot publishedView
PRev Further Information to address feedback from EA regarding re-location of an overflowtrench as required by Network Rail Version 1 dateSupporting documentationNot publishedView
PRev Further Information - Soils and land quality Version 1 dated 23 01 2017Supporting documentationNot publishedView
MW ADVERT MW.0003-26Supporting documentationNot publishedView
Method Statement for the protection of woodland, trees, hedgerows, the River Thames and Sutton Courtenay Brook (Revised 11.07.18) (conditiSupporting documentationNot publishedView
Condition 16 Method Statement dated July 2017(1)Supporting documentationNot publishedView
PRev Further Information - Applied Ecology Ltd Otter Report Version 1 dated 30 03 2017Supporting documentationNot publishedView
Prev -Dust Control Scheme dated 10 07 07Supporting documentationNot publishedView
DP 004819 006722 V4Supporting documentationNot publishedView
DSupporting documentationNot publishedView
Method Statement for the protection of woodland, trees, hedgerows, the River Thames and Sutton Courtenay Brook (Revised 11.07.18) (conditi(1)Supporting documentationNot publishedView
Approved Phase 5 Written Scheme of Investigation Archaeological Excavation (condition 22)(1)Supporting documentationNot publishedView
Amended Planning Statement 15.12.25Supporting documentationNot publishedView
PRev Further Information to address feedback from EA Version 1 dated 16 01 2017Supporting documentationNot publishedView
Prev -Further Information - Flood Storage Capacity Volume Comparison Version 5 datedSupporting documentationNot publishedView
Further Information - Applied Ecology Ltd Technical Ecology Report Version 3 dated(2)Supporting documentationNot publishedView
Condition 16 Method Statement dated July 2017Supporting documentationNot publishedView
931 Sutton Courtney Drainage Addendum v2i 20251007Supporting documentationNot publishedView
M&W AGENTS LETTER MW.0003-26Supporting documentationNot publishedView
Decision notice MW.0067-22Supporting documentationNot publishedView
B25 078 Sutton Courtney-Ecology ReportSupporting documentationNot publishedView
Update Ecology Survey Report by Applied Ecology dated March 2019Supporting documentationNot publishedView
Article 13 NoticeSupporting documentationNot publishedView
Application FormSupporting documentationNot publishedView
250924 s73 Landscape and Visual Report-FINALSupporting documentationNot publishedView
Bridge Farm PP-14394569 -Departure FormSupporting documentationNot publishedView
Bridge Farm PP-14394569 - EIA FormSupporting documentationNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Issue Date

    Published milestoneCouncil source

Decision & conditions

County Matter - Approval Recommendation
Decision notice MW.0067-22
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.