Status on council recordCouncil status: Decision Made

Discharge of Condition(s) 3 (materials by photographic schedule), 4 (detailed elevation and section plans), 5 (porch construction details) and 6 (structural drawings showing works to open front door) on planning applications P24/V2699/FUL and P24/V2700/LB and 7 (new slab level, details (including specification, position, height, orientation) of a scheme of features), 8 (CEMP: Biodiversity), 9 (sensitive lighting strategy for bats), 10 (Arboricultural Method Statement), 11 (full surface water drainage scheme) and 12 (ancillary accommodation) on planning application P24/V2699/FUL (Conversion of rear attached barn, re-establishment of formal front door, remodelling & restoration of existing house & associated works. Erection of new ancillary garage/studio/ 1 bedroom annex block). (Addition al drainage information received 27th March 2026)

14-16 The Green, Steventon, Abingdon, OX13 6RP

Vale of White Horse District CouncilReference P25/V2564/DIS

Last published check: 25 Oct 2026, 02:22. Check the council record for more recent changes.

Status and dates

Last published check: 25 Oct 2026, 02:22 (UK)

  1. DoneReceived5 Mar 2026
  2. Not publishedValidatedNo date on council record
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedDischarge Partially AgreedNot published

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (2)
  1. Application Received Date

    Published milestoneCouncil source
  2. Issue Date

    Published milestoneCouncil source
Documents
20 published

Proposal

Discharge of Condition(s) 3 (materials by photographic schedule), 4 (detailed elevation and section plans), 5 (porch construction details) and 6 (structural drawings showing works to open front door) on planning applications P24/V2699/FUL and P24/V2700/LB and 7 (new slab level, details (including specification, position, height, orientation) of a scheme of features), 8 (CEMP: Biodiversity), 9 (sensitive lighting strategy for bats), 10 (Arboricultural Method Statement), 11 (full surface water drainage scheme) and 12 (ancillary accommodation) on planning application P24/V2699/FUL (Conversion of rear attached barn, re-establishment of formal front door, remodelling & restoration of existing house & associated works. Erection of new ancillary garage/studio/ 1 bedroom annex block). (Addition al drainage information received 27th March 2026)

Reference
P25/V2564/DIS
Agent
Richard Cutler

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • AmendedAmended PlanNot publishedView
  • AmendedAmended PlanNot publishedView
  • AmendedAmended PlanNot publishedView
  • AmendedAmended PlanNot publishedView
  • CEMPAmended Supporting DocumentNot publishedView
  • Cricket Cottage Tn And Soakaway Design B 1Amended Supporting DocumentNot publishedView
  • Pl Pr 100 B Sw Drainage StartegyAmended Supporting DocumentNot publishedView
  • Cricket Cottage TN and Soakaway design AOther Plans/InformationNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Discharge Partially Agreed

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.