ApprovedCouncil status: Decision Made

Variation of condition 2 (Approved Plans) on application P22/V0416/FUL, the changes are to Tech Edge 2 building: 1. Parapet height has increased by 445mm - it is necessary to provide 1.1m upstand on the roof edge for safety reasons. 2. Overall ridge height increased by 174mm - this is due to increase in steelwork sizes. 3. Window height/openings and positioning altered - this is necessary to suit the dimensions of the cembrit fibre cement cladding panels. It is also driven by the sustainable strategy adopted during construction stage design. 4. Loading bay doors repositioning - this is necessary to suit parking arrangements and kerb lines 5. Additional louvred door to plant room added at first floor level - necessary to provide access to plant at this part of the building from the outside. 6. Cycle storage to the north of Tech Edge 2 repositioned - this is to accommodate the need for a fire hydrant in the previously approved location. 7. Additional fire exit door added to the east elevation of Unit 1 - needed to satisfy safe means of escape travel distances. 8. Installation of an external plant enclosure to the east of Unit 1. This is enclosed by a 2.8m high timber fence to match those seen at other buildings at Harwell Campus - this is necessary to meet the operational requirements of the Unit 1 tenant. 9. Addition of 2no. louvres in the east elevation of Unit 1 - this is necessary to meet the operational requirements of the Unit 1 tenant. 10. Installation of a flue on the roof of Unit 1, projecting 3m above the parapet - this is necessary to meet the operational requirements of the Unit 1 tenant. (Erection of two employment buildings, with associated landscaping and car parking).

Land to the south of Curie Avenue and west of Eighth Street, Harwell Campus, Didcot, OX11 0DF

Vale of White Horse District CouncilReference P24/V2383/S73

Last published check: 23 Oct 2026, 20:11. Check the council record for more recent changes.

Status and dates

Last published check: 23 Oct 2026, 20:11 (UK)

  1. DoneReceived6 Nov 2024
  2. Not publishedValidatedNo date on council record
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedPlanning Permission is GrantedNot published

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (2)
  1. Application Received Date

    Published milestoneCouncil source
  2. Issue Date

    Published milestoneCouncil source
Documents
12 published

Proposal

Variation of condition 2 (Approved Plans) on application P22/V0416/FUL, the changes are to Tech Edge 2 building: 1. Parapet height has increased by 445mm - it is necessary to provide 1.1m upstand on the roof edge for safety reasons. 2. Overall ridge height increased by 174mm - this is due to increase in steelwork sizes. 3. Window height/openings and positioning altered - this is necessary to suit the dimensions of the cembrit fibre cement cladding panels. It is also driven by the sustainable strategy adopted during construction stage design. 4. Loading bay doors repositioning - this is necessary to suit parking arrangements and kerb lines 5. Additional louvred door to plant room added at first floor level - necessary to provide access to plant at this part of the building from the outside. 6. Cycle storage to the north of Tech Edge 2 repositioned - this is to accommodate the need for a fire hydrant in the previously approved location. 7. Additional fire exit door added to the east elevation of Unit 1 - needed to satisfy safe means of escape travel distances. 8. Installation of an external plant enclosure to the east of Unit 1. This is enclosed by a 2.8m high timber fence to match those seen at other buildings at Harwell Campus - this is necessary to meet the operational requirements of the Unit 1 tenant. 9. Addition of 2no. louvres in the east elevation of Unit 1 - this is necessary to meet the operational requirements of the Unit 1 tenant. 10. Installation of a flue on the roof of Unit 1, projecting 3m above the parapet - this is necessary to meet the operational requirements of the Unit 1 tenant. (Erection of two employment buildings, with associated landscaping and car parking).

Reference
P24/V2383/S73
Agent
Steven Roberts

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Application FormApplication FormNot publishedView
  • JSL3389 601 T6 Tree Pit and Topsoil PlanOther Plans/InformationNot publishedView
  • JSL3389 501J SoftworksOther Plans/InformationNot publishedView
  • JSL3389 201J HardworksOther Plans/InformationNot publishedView
  • Roof & Floor Plan TE 2 Proposed drwgno 6849-137General PlanNot publishedView
  • Elevations TE 2 Proposed drwgno 6849-135General PlanNot publishedView
  • Bay Study TE 2 Proposed drwgno 6849-140General PlanNot publishedView
  • Section Plan TE 2 Proposed drwgno 6849-143General PlanNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Planning Permission is Granted
Decision Notice Delegated Report

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.