Council planning record

Discharge of condition 30 (Sustainable Drainage Scheme) and 33 (Foul Water Drainage Scheme) on application P23/V0134/O. (Outline application for a phased development for up to 669 residential units and Neighbourhood Centre (Use Class E and Sui Generis) with associated infrastructure and open space which is capable of coming forward in distinct and separate phases in a severable way).

Land at Crab Hill - Phase 6, Land north of A417 and east of A338, Wantage

Decision MadeReference: P24/V1811/DISVale of White Horse District Council

Last published check: 10 Oct 2026, 15:54. Check the council record for more recent changes.

Application location

Land at Crab Hill - Phase 6, Land north of A417 and east of A338, Wantage

This record has no verified map location.

Application summary

Status
Decision Made
Application type
Not published
Received
20 Aug 2024
Validated
Not published
Determination deadline
Not published
Local authority
Vale of White Horse District Council

Application overview

Discharge of condition 30 (Sustainable Drainage Scheme) and 33 (Foul Water Drainage Scheme) on application P23/V0134/O. (Outline application for a phased development for up to 669 residential units and Neighbourhood Centre (Use Class E and Sui Generis) with associated infrastructure and open space which is capable of coming forward in distinct and separate phases in a severable way).

Proposal details

Reference
P24/V1811/DIS
Agent
Mr Rob Stroud

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 18 of 18

DocumentPublishedAction
Application FormApplication FormNot publishedView
PJS22-077-DR-550 - Manhole ScheduleGeneral PlanNot publishedView
PJS22-077-DR-503 Kerbing LayoutGeneral PlanNot publishedView
PJS22-077-DR-502 Contour LayoutGeneral PlanNot publishedView
PJS22-077-DR-550A Phase 6b Additional Drainage LateralsGeneral PlanNot publishedView
PJS22-077-DR-900 Highway Construction DetailsGeneral PlanNot publishedView
PJS22-077-DR-506 Swept Path AnalysisGeneral PlanNot publishedView
PJS22-077-DR-911 Control Chamber DetailsGeneral PlanNot publishedView
PJS22-077-DR-910 Drainage Construction DetailsGeneral PlanNot publishedView
PJS22-077-DR-700 Road and Sewer Long-sectionsGeneral PlanNot publishedView
PJS22-077-DR-507 S38 Legal AgreementGeneral PlanNot publishedView
PJS22-077-DR-505 Surface Water Area PlanGeneral PlanNot publishedView
PJS22-077-DR-504 Foul Area PlanGeneral PlanNot publishedView
PJS22-077-DR-500 Highway General ArrangementGeneral PlanNot publishedView
PJS22-077-DR-501 Drainage General ArrangementGeneral PlanNot publishedView
Validation ChecklistSupporting documentationNot publishedView
Drainage Strategy Technical NoteSupporting documentationNot publishedView
2024-09-16 Decision Letter - RefusalDecisionNot publishedView

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Issue Date

    Published milestoneCouncil source

Decision & conditions

Discharge Details Rejected
2024-09-16 Decision Letter - Refusal
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.