Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Land to the west of Didcot B Power Station
Last published check: 2 Oct 2026, 02:34. Check the council record for more recent changes.
Land to the west of Didcot B Power Station
This record has no verified map location.
Discharge of condition 8 (foul water drainage) on application P18/V2277/FUL (Site clearance and preparation, and the development of a Data Centre campus comprising two Data Centre units, emergency back-up diesel generators, the surface storage of emergency diesel fuel, the erection of sub-station, hard and soft landscaping including ecology measures and SUDS, parking and security measures.)
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Application FormApplication Form | Not published | View |
| Foul Water Layout Sheet 2 Proposed drwgno LHR097-SWE-SW-XX-DR-C-522013 Rev P02General Plan | Not published | View |
| Foul Water Layout Sheet 1 Proposed drwgno LHR097-SWE-SW-XX-DR-C-522012 Rev P02General Plan | Not published | View |
| Enabling Works Scope Drainage Layout Sheet 1 OF 2 drwgno C11238-HYD-XX-XX-DR-D-0354 Rev T15General Plan | Not published | View |
| Enabling Works Drainage Layout Of Foul Pumping Station Area drwgno C11238-HYD-XX-XX-DR-D-0358 Rev T3General Plan | Not published | View |
| Raising Main As-Built Survey drwgno I & H SDW 003 Rev 1General Plan | Not published | View |
| Foul Water Layout Sheet 4 Proposed drwgno LHR097-SWE-SW-XX-DR-C-522015 Rev P02General Plan | Not published | View |
| Foul Water Layout Sheet 3 Proposed drwgno LHR097-SWE-SW-XX-DR-C-522014 Rev P01General Plan | Not published | View |
| Services Overview Proposed drwgno LHR097-SWE-SW-XX-DR-C-982010 Rev P02General Plan | Not published | View |
| Foul Water Layout Overview Proposed drwgno LHR097-SWE-SW-XX-DR-C-522011 Rev P01General Plan | Not published | View |
| Drainage Construction Details Sheet 3 drwgno LHR097-SWE-SW-XX-DR-C-525003 Rev P01General Plan | Not published | View |
| Enabling Works Scope Surface Water Drainage Layout Sheet 2 OF 2 drwgno C11238-HYD-XX-XX-DR-D-0355 Rev T8General Plan | Not published | View |
| Technical Note - Foul Drainage Design Parameters and AssumptionsSupporting documentation | Not published | View |
| Validation ChecklistSupporting documentation | Not published | View |
| Didcot Datacentre - Public Sewer Connection ApplicationSupporting documentation | Not published | View |
| Foul Water Drainage StrategySupporting documentation | Not published | View |
| Operation and Maintenance ManualSupporting documentation | Not published | View |
| Covering LetterSupporting documentation | Not published | View |
| 2024-10-11 DIS Letter ApprovalDecision | Not published | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.