Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
North A420 Botley Road to south A423 ring road between, A34 to the west & the Oxford to London railway line to east, including land between the A4144 Abingdon Road, to the west & the River Thames.
Last published check: 12 Oct 2026, 00:34. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A flood alleviation scheme to reduce flood risk in Oxford, comprising: Construction of a new two stage channel from the confluence of the Botley and Seacourt Streams, extending south easterly to north Kennington; Floodwalls to the north of Botley Road, at Seacourt Park and Ride and adjacent to Bullstake Close allotments; Floodgates at Helen Road, Henry Road and Seacourt Park and Ride; Flood defences at New Hinksey between Abingdon Road in the west and the River Thames in the East, Ferry Hinksey Road and north of South Hinksey; Control Structures at Bulstake Stream, Eastwyke Ditch, Hinksey Pond, Redbridge Stream and Cold Harbour; Bridges and culverts to cross highways and footpaths maintaining access routes; Spillways, embankments, low flow control structure, modifications to Seacourt Stream, ford crossings, channel clearance, ditch widening and deepening, removal of weir and installation of telemetry cabinets; Repairs to existing walls along Osney Stream and in Hinksey Park. The creation of new and improved habitat for flora, fauna and fisheries, and change of use of land to provide exchange for existing open space. Works will include extraction of some sand and gravel for reuse on the site and exportation from the site. Consultation End Date 9th May 2022
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsNorth A420 Botley Road to south A423 ring road between, A34 to the west & the Oxford to London railway line to east, including land between the A4144 Abingdon Road, to the west & the River Thames.
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| ApplicationFormApplication Form | Not published | View |
| 2022-03-31 OCC Consultation LetterApplication Form | Not published | View |
| TYPICAL LOW FLOW WEIRGeneral Plan | Not published | View |
| TYPICAL DETAIL OF TWO STAGE CHANNELGeneral Plan | Not published | View |
| TYPICAL CROSS SECTIONS OF FLOODWALL AT BULLSTAKE CLOSE ALLOTMENTSGeneral Plan | Not published | View |
| RED LINE BOUNDARYGeneral Plan | Not published | View |
| Planting Plan Sheet 13 of 14General Plan | Not published | View |
| NEW BRIDGES AT KENNINGTON & OLD ABINGDON ROAD - SHEET 2 OF 2General Plan | Not published | View |
| Landscape and Habitat Management Plan Sheet 1 of 7General Plan | Not published | View |
| GA OF FLOW GAUGING STATION AT SEACOURT STREAMGeneral Plan | Not published | View |
| GA OF FLOODWALL TO THE NORTH OF DONNINGTON BRIDGE ROADGeneral Plan | Not published | View |
| ES App S Figure 8 Hedges retained and plantedGeneral Plan | Not published | View |
| ES App I-6 Landscape GA IMSE500177-CH2-L00-A2-VS-L-0603-16General Plan | Not published | View |
| AREA 4 NORTH - LOCATION FOR CONSTRUCTION ACCESS AND TEMPORARY STORAGE AREASGeneral Plan | Not published | View |
| AREA 2B NORTH - GENERAL ARRANGEMENT OF NEW CHANNEL ADJACENT TO SEACOURT STREAMGeneral Plan | Not published | View |
| AREA 1 - LOCATION FOR CONSTRUCTION ACCESS AND TEMPORARY STORAGE AREASGeneral Plan | Not published | View |
| Addendum Contamination Report IMSE500177-CH2-00-00-RP-GT-0408General Plan | Not published | View |
| Landscape and Habitat Management Plan Sheet 2 of 7General Plan | Not published | View |
| GA OF MODIFICATIONS TO HINKSEY DRAIN AT KENNINGTONGeneral Plan | Not published | View |
| GA OF FLOW GAUGING STATION AT RIVER THAMES FRIARS WHARFGeneral Plan | Not published | View |
| GA OF FLOODWALL DWL.A1A.01 TO THE WEST OF SEACOURT STREAMGeneral Plan | Not published | View |
| GA OF FLOOD EMBANKMENT AT NEW HINKSEY - SHEET 3 OF 3General Plan | Not published | View |
| GA OF FLOODWALL AT SOUTH HINKSEY VILLAGEGeneral Plan | Not published | View |
| ES App S IMSE500177-CH2-XX-ZZ-VS-EN-1118 - Figure 4General Plan | Not published | View |
| ES App I-6 Landscape GA IMSE500177-CH2-L00-A4-VS-L-0612-16General Plan | Not published | View |
| ES App I-6 Landscape GA IMSE500177-CH2-L00-A4-VS-L-0611-16General Plan | Not published | View |
| ES App I-6 Landscape GA IMSE500177-CH2-L00-A3-VS-L-0605-16General Plan | Not published | View |
| ES App I-6 Landscape GA IMSE500177-CH2-L00-A1-VS-L-0601-17General Plan | Not published | View |
| AREA 3B SOUTH - GENERAL ARRANGEMENT OF CHANNEL WORKS BETWEEN NH CAUSEWAY TO BIFURCATION FROM HINKSEY STREAMGeneral Plan | Not published | View |
| AREA 2B CHANNEL DETAILS AND TYPICAL CROSS SECTIONSGeneral Plan | Not published | View |
| AREA 2 - LOCATION FOR CONSTRUCTION ACCESS AND TEMPORARY STORAGE AREASGeneral Plan | Not published | View |
| Planting Plan Sheet 7 of 14General Plan | Not published | View |
| Planting Plan Sheet 3 of 14General Plan | Not published | View |
| Planting Plan Sheet 14 of 14General Plan | Not published | View |
| Planting Plan Sheet 11 of 14General Plan | Not published | View |
| NEW FLOODWALL AT BOTLEY BRIDGE BY RICHER SOUNDSGeneral Plan | Not published | View |
| GENERAL SCHEME OVERVIEWGeneral Plan | Not published | View |
| GENERAL ARRANGEMENT OF NEW CHANNEL BETWEEN WILLOW WALK AND NORTH HINKSEY CAUSEWAYGeneral Plan | Not published | View |
| GA OF NEW CHANNEL BETWEEN DEVIL'S BACKBONE AND COLD HARBOUR BRIDGEGeneral Plan | Not published | View |
| GA OF FLOW GAUGING STATION AT AT BULSTAKE STREAMGeneral Plan | Not published | View |
| ES App S IMSE500177-CH2-XX-ZZ-VS-EN-1117 - Figure 7General Plan | Not published | View |
| ES App I-6 Landscape GA IMSE500177-CH2-L00-A4F-VS-L-0613-16General Plan | Not published | View |
| AREA 3C NORTH - GENERAL ARRANGEMENT OF CHANNEL WORKS BETWEEN BIFURCATION FROM HINKSEY STREAM TO DEVIL'S BACKBONEGeneral Plan | Not published | View |
| AREA 3 SOUTH - LOCATION FOR CONSTRUCTION ACCESS AND TEMPORARY STORAGE AREASGeneral Plan | Not published | View |
| TYPICAL DETAIL OF ACCESS TRACKS AND KERBSGeneral Plan | Not published | View |
| Planting Plan Sheet 9 of 14General Plan | Not published | View |
| Planting Plan Sheet 5 of 14General Plan | Not published | View |
| Planting Plan Sheet 4 of 14General Plan | Not published | View |
| OATLANDS RECREATION GROUND - EMBANKMENT DETAILS AND CROSS SECTIONSGeneral Plan | Not published | View |
| NEW FOOTBRIDGE AT NORTH HINKSEY CAUSEWAYGeneral Plan | Not published | View |
| NEW BRIDGES AT KENNINGTON & OLD ABINGDON ROAD - SHEET 1 OF 2General Plan | Not published | View |
| GA OF NEW CHANNEL BETWEEN COLDHARBOUR BRIDGE AND OLD ABINGDON ROADGeneral Plan | Not published | View |
| GA OF FLOODWALL AT THE EXISTING ACCESS TRACK TO THE BOATHOUSEGeneral Plan | Not published | View |
| GA AND DETAILS OF ROAD HUMP BY SEACOURT P&RGeneral Plan | Not published | View |
| ES App I-6 Landscape GA IMSE500177-CH2-L00-A4-VS-L-0610-16General Plan | Not published | View |
| ES App I-6 Landscape GA IMSE500177-CH2-L00-A4-VS-L-0608-16General Plan | Not published | View |
| ES App I-6 Landscape GA IMSE500177-CH2-L00-A3F-VS-L-0609-03General Plan | Not published | View |
| TYPICAL DETAIL OF FLEX MSE CULVERT AND HEADWALLGeneral Plan | Not published | View |
| Planting Plan Sheet 2 of 14General Plan | Not published | View |
| Planting Plan Sheet 12 of 14General Plan | Not published | View |
| Planting Plan OverviewGeneral Plan | Not published | View |
| OXFORD OARKR TEMPORARY DIVERSION ROUTE ALIGNMENT DRAWINGSGeneral Plan | Not published | View |
| OVERVIEW OF WORKS AT AREA 1CGeneral Plan | Not published | View |
| OVERVIEW OF WORKS AT AREA 1AGeneral Plan | Not published | View |
| NEW FOOTBRIDGE AT NORTH HINKSEY CAUSEWAY PARAPET'S DETAILS (1)General Plan | Not published | View |
| MODIFICATIONS TO BOTLEY BRIDGEGeneral Plan | Not published | View |
| Landscape and Habitat Management Plan Sheet 3 of 7General Plan | Not published | View |
| GENERAL ARRANGEMENT OF FLOODWALL AROUND SEACOURT PARK AND RIDE CAR PARKGeneral Plan | Not published | View |
| GENERAL ARRANGEMENT OF EMBANKMENT TO THE NORTH OF SOUTH HINKSEY VILLAGEGeneral Plan | Not published | View |
| GA OF MODIFIACATIONS TO HINKSEY STREAM AT NEW HINKSEYGeneral Plan | Not published | View |
| ES App S IMSE500177-CH2-XX-ZZ-VS-EN-1116 - Figure 3General Plan | Not published | View |
| ES App S IMSE500177-CH2-XX-ZZ-VS-EN-1111 - Figure 1 PAGE 14General Plan | Not published | View |
| ES App I-6 Landscape GA IMSE500177-CH2-L00-A3-VS-L-0606-17General Plan | Not published | View |
| ES App I-6 Landscape GA IMSE500177-CH2-L00-A2-VS-L-0602-17General Plan | Not published | View |
| Area 4E HINKSEY DRAIN TYPICAL CROSS SECTIONSGeneral Plan | Not published | View |
| AREA 4D HINKSEY DRAIN CROSS SECTIONS - SHEET 2 OF 2General Plan | Not published | View |
| AREA 4D HINKSEY DRAIN CROSS SECTIONS - SHEET 1 OF 2General Plan | Not published | View |
| AREA 4 SOUTH - LOCATION FOR CONSTRUCTION ACCESS AND TEMPORARY STORAGE AREASGeneral Plan | Not published | View |
| AREA 3B NORTH - GENERAL ARRANGEMENT OF CHANNEL WORKS BETWEEN NH CAUSEWAY TO BIFURCATION FROM HINKSEY STREAMGeneral Plan | Not published | View |
| AREA 2B SOUTH - GENERAL ARRANGEMENT OF NEW CHANNEL ADJACENT TO SEACOURT STREAMGeneral Plan | Not published | View |
| ACCOMMODATION BRIDGE AT DEVIL'S BACKBONEGeneral Plan | Not published | View |
| TYPICAL TELEMETRY CABINETGeneral Plan | Not published | View |
| TYPICAL CROSS SECTIONS OF FLOODWALL AROUND SEACOURT PARK AND RIDE CAR PARKGeneral Plan | Not published | View |
| TILTING WEIR AT EASTWYKE DITCH (SHEET 3 OF 3)General Plan | Not published | View |
| TILTING WEIR AT EASTWYKE DITCH (SHEET 1 OF 3)General Plan | Not published | View |
| Planting Plan Sheet 10 of 14General Plan | Not published | View |
| OVERVIEW OF WORKS AT AREA 1BGeneral Plan | Not published | View |
| LOCATIONS OF NEW TELEMETRY CABINETSGeneral Plan | Not published | View |
| TYPICAL FLOODGATEGeneral Plan | Not published | View |
| TYPICAL DETAIL OF PROTECTION WORKSGeneral Plan | Not published | View |
| TYPICAL CROSS SECTIONS OF FLOOD EMBANKMENT TO THE NORTH OF BOTLEY ROADGeneral Plan | Not published | View |
| Planting Plan Sheet 8 of 14General Plan | Not published | View |
| Planting Plan Sheet 6 of 14General Plan | Not published | View |
| PEDESTRIAN CROSSING AT BULSTAKE STREAMGeneral Plan | Not published | View |
| Landscape and Habitat Management Plan Sheet 6 of 7General Plan | Not published | View |
| GENERAL ARRANGEMENT OF EMBANKMENT AT OATLANDS RECREATION GROUNDGeneral Plan | Not published | View |
| ES App S IMSE500177-CH2-XX-ZZ-VS-EN-1111 - Figure 1 Pages 1-13General Plan | Not published | View |
| ES App I-6 Landscape GA IMSE500177-CH2-L00-A4-VS-L-0614-02General Plan | Not published | View |
| ES App I-6 Landscape GA IMSE500177-CH2-L00-A4-VS-L-0607-16General Plan | Not published | View |
| ES App I-6 Landscape GA IMSE500177-CH2-L00-A3-VS-L-0604-16General Plan | Not published | View |
| AREA 3C SOUTH - GENERAL ARRANGEMENT OF CHANNEL WORKS BETWEEN BIFURCATION FROM HINKSEY STREAM TO DEVIL'S BACKBONEGeneral Plan | Not published | View |
| TILTING WEIR AT EASTWYKE DITCH (SHEET 2 OF 3)General Plan | Not published | View |
| Planting Plan Sheet 1 of 14General Plan | Not published | View |
| Planning Application Eng & Landscape Drawing RegisterGeneral Plan | Not published | View |
| NEW ACCOMMODATION BRIDGE AT WILLOW WALKGeneral Plan | Not published | View |
| Landscape and Habitat Management Plan Sheet 5 of 7General Plan | Not published | View |
| Landscape and Habitat Management Plan Sheet 4 of 7General Plan | Not published | View |
| GENERAL ARRANGEMENT OF SEACOURT STREAM MODIFICATIONSGeneral Plan | Not published | View |
| GA OF MODIFICATIONS TO HINKSEY DRAIN BETWEEN OAR BRIDGES TO A423 RAILBRIDGEGeneral Plan | Not published | View |
| GA OF FLOOD EMBANKMENT AT NEW HINKSEY - SHEET 2 OF 3General Plan | Not published | View |
| GA OF FLOOD EMBANKMENT AT NEW HINKSEY - SHEET 1 OF 3General Plan | Not published | View |
| ES App A - List of Engineering DrawingsGeneral Plan | Not published | View |
| AREA 4H HINKSEY STREAM TYPICAL CROSS SECTIONS AT NEW HINKSEYGeneral Plan | Not published | View |
| AREA 4 NEW HINKSEY - LOCATION FOR CONSTRUCTION ACCESS AND TEMPORARY STORAGE AREASGeneral Plan | Not published | View |
| AREA 3 NORTH - LOCATION FOR CONSTRUCTION ACCESS AND TEMPORARY STORAGE AREASGeneral Plan | Not published | View |
| TYPICAL FORD CROSSINGGeneral Plan | Not published | View |
| TYPICAL DETAIL OF IN-CHANNEL CATTLE POLESGeneral Plan | Not published | View |
| NEW FOOTBRIDGE AT WEST WAY CYCLE PATHGeneral Plan | Not published | View |
| NEW CULVERT AT EXISTING ACCESS BRIDGE FROM BOTLEY ROADGeneral Plan | Not published | View |
| Landscape and Habitat Management Plan Sheet 7 of 7General Plan | Not published | View |
| GENERAL ARRANGEMENT OF FLOODWALL AT OSNEY MEAD INDUSTRIAL ESTATEGeneral Plan | Not published | View |
| GENERAL ARRANGEMENT OF FLOOD EMBANKMENT TO THE NORTH OF BOTLEY ROADGeneral Plan | Not published | View |
| ES App I-6 Landscape GA IMSE500177-CH2-L00-00-VS-L-0600-17General Plan | Not published | View |
| OFAS Planning StatementSupporting documentation | Not published | View |
| FRA Appendix E-Groundwater Modelling Report Part 2Supporting documentation | Not published | View |
| ES Appendix J-6 OAR reportSupporting documentation | Not published | View |
| ES Appendix J-3 Heritage StatementSupporting documentation | Not published | View |
| ES Appendix J-2 Appendix 11 220617Supporting documentation | Not published | View |
| ES Appendix J-1 GazetteerSupporting documentation | Not published | View |
| ES Appendix D-8 Badger Sett Activity IMSE500177-CH2-XX-00-SU-EN-0728 CONFIDENTIALSupporting documentation | Not published | View |
| ES Appendix D-25 Whorled Water-milfoil Mitigation Strategy IMSE500177-CH2-XX-A4E-RP-EN-0708Supporting documentation | Not published | View |
| ES Appendix D-21 Fisheries SurveySupporting documentation | Not published | View |
| ES App S Figure 6Supporting documentation | Not published | View |
| ES App S Biodiversity Metric IMSE500177-CH2-00-00-DT-EN-0020Supporting documentation | Not published | View |
| ES App M Appendix J - Park and Ride Technical NoteSupporting documentation | Not published | View |
| ES App M Appendix D - Collision DataSupporting documentation | Not published | View |
| ES App J-7 Eval Report AppendicesSupporting documentation | Not published | View |
| ES App J-5 GeophysicsSupporting documentation | Not published | View |
| ES App J-5 Fig 1-27 (1)Supporting documentation | Not published | View |
| ES App I-1 Extract of NCA 108 Upper Thames Clay ValesSupporting documentation | Not published | View |
| ES App C-2 Ecology Walkover Survey Report IMSE500177-CH2-XX-00-SU-EN-0715Supporting documentation | Not published | View |
| ES - Fig 8 5 IMSE500177-CH2-XX-ZZ-VS-EN-1114Supporting documentation | Not published | View |
| ES - Fig 6 4 New permissive path along the maintenance access track IMSE500177-CH2-XX-ZZ-VS-EN-1026Supporting documentation | Not published | View |
| Environmental Statement 2022 IMSE500177-CH2-00-00-RP-E-0654Supporting documentation | Not published | View |
| Landscape and Habitat Management PlanSupporting documentation | Not published | View |
| FRA Appendix C-Model Calibration ReportSupporting documentation | Not published | View |
| FRA Appendix A - Overview of Proposed WorksSupporting documentation | Not published | View |
| ES Appendix J-2 Heritage DBASupporting documentation | Not published | View |
| ES Appendix D-19 Otter survey 2018 IMSE500177-CH2-XX-00-SU-EN-0714Supporting documentation | Not published | View |
| ES Appendix D-10 Bat Surveys - results of Tree Climb Inspections 2017Supporting documentation | Not published | View |
| ES Appendix D-1 Aquatic Invertebrate and Mussel Survey 2016Supporting documentation | Not published | View |
| ES App N Planning Policy IMSE500177-CH2-00-00-DT-EN-0015Supporting documentation | Not published | View |
| ES App M Appendix E - Traffic DataSupporting documentation | Not published | View |
| ES App I-5 OFAS Green Infrastructure StrategySupporting documentation | Not published | View |
| ES App I-1 Extract of NCA 109 Midvale RidgeSupporting documentation | Not published | View |
| ES App C-5 Oxford FAS FMP Final March 2018Supporting documentation | Not published | View |
| ES App C-1 Designated sites v4Supporting documentation | Not published | View |
| ES App B-1 Scoping OpinionSupporting documentation | Not published | View |
| ES - Fig 8 3 IMSE500177-CH2-XX-ZZ-VS-EN-1112Supporting documentation | Not published | View |
| OFAS ES Appendix M Transport AssessmentSupporting documentation | Not published | View |
| GENERAL SCHEME OVERVIEWSupporting documentation | Not published | View |
| FRA Appendix F-Downstream Summary TablesSupporting documentation | Not published | View |
| ES Appendix D-9 Preliminary Bat Survey 2016Supporting documentation | Not published | View |
| ES Appendix D-5 Breeding birds IMSE500177-CH2-XX-00-TN-EN-0707Supporting documentation | Not published | View |
| ES Appendix D-4 RHS and RCS (1) Part1Supporting documentation | Not published | View |
| ES Appendix D-22 Hinksey Ponds Macrophyte SurveySupporting documentation | Not published | View |
| ES App O OFAS Soil Resources ReportSupporting documentation | Not published | View |
| ES App M Appendix C - Park and Ride DataSupporting documentation | Not published | View |
| ES App M Appendix A - Scoping DocumentsSupporting documentation | Not published | View |
| ES App L WER Assessment IMSE500177-CH2-COC-00-RP-EN-0735Supporting documentation | Not published | View |
| ES App F - Arboricultural Impact AssessmentSupporting documentation | Not published | View |
| ES App C-5 Appendix F Scope for FMPSupporting documentation | Not published | View |
| ES App C-5 Appendix D Trial Pit Area LocationsSupporting documentation | Not published | View |
| ES App C-4 Hinksey Meadow NVC Survey 2020 Final Report v2Supporting documentation | Not published | View |
| ES - Fig 7 6 [a&b] Local Landscape Charater Area IMSE500177-CH2-XX-ZZ-VS-EN-1009Supporting documentation | Not published | View |
| ES - Fig 6 2b PRoW Oct21 IMSE500177-CH2-XX-ZZ-VS-EN-1022Supporting documentation | Not published | View |
| ES - Fig 6 1 Recreation and Public Access IMSE500177-CH2-XX-ZZ-VS-EN-1004Supporting documentation | Not published | View |
| Contamination Report IMSE500177-CH2-ZZ-ZZ-RP-GT-0146Supporting documentation | Not published | View |
| Landscape Maintenance Operations ScheduleSupporting documentation | Not published | View |
| Landowners tenants notifiedSupporting documentation | Not published | View |
| FRA Appendix E-Groundwater Modelling Report Part 1Supporting documentation | Not published | View |
| ES Non-technical Summary IMSE500177-CH2-XX-XX-RP-EN-0700Supporting documentation | Not published | View |
| ES Appendix J-4 geoarchaeologSupporting documentation | Not published | View |
| ES Appendix H-2 Air Quality VerificationSupporting documentation | Not published | View |
| ES Appendix D-6 Wintering birdsSupporting documentation | Not published | View |
| ES Appendix D-23 MG4 Grassland Mitigation IMSE500177-CH2-XX-A2B-RP-EN-0709Supporting documentation | Not published | View |
| FRA Appendix D-Hydrology ReportSupporting documentation | Not published | View |
| ES Appendix H-4 Air Quality Model SummarySupporting documentation | Not published | View |
| ES Appendix E-1 Invasive Species SurveySupporting documentation | Not published | View |
| ES Appendix D-16 Water vole and otter survey 2016 IMSE500177-HGL-06-ZZ-RE-I-000173Supporting documentation | Not published | View |
| ES Appendix D-15 Great Crested Newt Survey 2020 IMSE500177-CH2-XX-00-SU-EN-0730Supporting documentation | Not published | View |
| ES App I-4 Oxfordshire HLC Project - extractSupporting documentation | Not published | View |
| ES App I-2 Extract of OFRMS AppAiiiSupporting documentation | Not published | View |
| ES App C-5 Appendix C Response to Task 4 6 April 2017Supporting documentation | Not published | View |
| ES App C-5 Appendix A Examples of restoration potentialSupporting documentation | Not published | View |
| ES App C-3 Habitat and Botanical Survey Report IMSE500177-CH2-XX-00-SU-EN-0734 v2Supporting documentation | Not published | View |
| ES - Fig 8 1 IMSE500177-CH2-XX-ZZ-VS-EN-1011Supporting documentation | Not published | View |
| ES - Fig 7 4 National Character Areas IMSE500177-CH2-XX-ZZ-VS-EN-1007Supporting documentation | Not published | View |
| ES - Fig 7 2 [a&b] Zone of Theoretical Visibility IMSE500177-CH2-XX-ZZ-VS-EN-1006Supporting documentation | Not published | View |
| ES - Fig 3 2 Indicative compound at South Hinksey IMSE500177-CH2-BSC-A3C-DR-C-0002Supporting documentation | Not published | View |
| ES - Fig 13 1 Affected road network human & ecological receptors IMSE500177-CH2-XX-ZZ-VS-EN-1019Supporting documentation | Not published | View |
| ES - Fig 12 1 Made Ground and Potential Sources of Contamination 20180823 IMSE500177-CH2-XX-ZZ-VS-EN-1018Supporting documentation | Not published | View |
| OFAS Mar22- Departure Form v2DPsigSupporting documentation | Not published | View |
| IMSE500177-HGL-00-ZZ-RE-C-000111- Materials Management PlanSupporting documentation | Not published | View |
| IMSE500177-CH2-00-00-DT-EN-0019 Appendix R Flora and Fauna legal compliance rev 1Supporting documentation | Not published | View |
| ES Appendix H-3 Air Quality Modelled ResultsSupporting documentation | Not published | View |
| ES Appendix E-2 Invasive Species Management PlanSupporting documentation | Not published | View |
| ES Appendix D-3 Kennington Pit PSYM survey 2020Supporting documentation | Not published | View |
| ES Appendix D-24 Creeping Marshwort Mitigation IMSE500177-CH2-XX-A3A-RP-EN-0702Supporting documentation | Not published | View |
| ES Appendix D-2 Kennington Pit Macrophyte Plant Survey 2017Supporting documentation | Not published | View |
| ES Appendix D-13 Bat Mitigation Plan IMSE500177-CH2-XX-00-RP-EN-0711Supporting documentation | Not published | View |
| ES App M Appendix F - Scheme proposals & Tech NoteSupporting documentation | Not published | View |
| ES App M Appendix B - Oxfordshire FAS Option Assessment ReportsSupporting documentation | Not published | View |
| OFAS app for mineral working 2022Supporting documentation | Not published | View |
| ES Appendix J-2 Appendix 12Supporting documentation | Not published | View |
| ES Appendix H-1 Air Quality Construction AssessmentSupporting documentation | Not published | View |
| ES App S Figure 5 HedgesSupporting documentation | Not published | View |
| ES App Q Modelling Review of No-channelSupporting documentation | Not published | View |
| ES App P IMSE500177-HGL-00-ZZ-RE-C-000111- Materials Management PlanSupporting documentation | Not published | View |
| ES App O Soils and Agricultural Quality ReportSupporting documentation | Not published | View |
| ES App M Appendix H - Stage One Road Safety AuditSupporting documentation | Not published | View |
| ES App M Appendix G - Access Routes and Vehicle TrackingSupporting documentation | Not published | View |
| ES App J-8 Field 3 Eval ReportSupporting documentation | Not published | View |
| ES App I-2 Extract of OFRMS AppAivSupporting documentation | Not published | View |
| ES App F Arboricultural Method StatementSupporting documentation | Not published | View |
| ES App B-1 Pre-app ResponseSupporting documentation | Not published | View |
| ES App B-1 Pre-app OFAS channel 20170804Supporting documentation | Not published | View |
| ES - Fig 8 2 pg14 IMSE500177-CH2-XX-ZZ-VS-EN-1111Supporting documentation | Not published | View |
| ES - Fig 8 2 IMSE500177-CH2-XX-ZZ-VS-EN-1111Supporting documentation | Not published | View |
| ES - Fig 6 3a Informal Permissive IMSE500177-CH2-XX-ZZ-VS-EN-1020Supporting documentation | Not published | View |
| ES - Fig 16.1 Haul roads and sidings line boundary IMSE500177-CH2-XX-ZZ-VS-EN-1040Supporting documentation | Not published | View |
| ES - Fig 11 1 Study Area for Traffic and Transport Assessment 20211101 IMSE500177-CH2-XX-ZZ-VS-EN-1017Supporting documentation | Not published | View |
| ES - Fig 10 2 Historic Buildings IMSE500177-CH2-XX-ZZ-VS-EN-1031Supporting documentation | Not published | View |
| Advert for MW.0027.22Supporting documentation | Not published | View |
| ES Appendix D-4 RHS and RCS (2) Part2Supporting documentation | Not published | View |
| ES Appendix D-20 Otter survey 2020 IMSE500177-CH2-XX-00-SU-EN-0731Supporting documentation | Not published | View |
| ES App M Appendix I - NTEM Growth FiguresSupporting documentation | Not published | View |
| ES App J-7 Eval Report Main TextSupporting documentation | Not published | View |
| ES App I-8 Viewpoint Sheets - figures 7.8 - 7.45Supporting documentation | Not published | View |
| ES App C-6 River Condition Assessment Results IMSE500177-CH2-COC-00-RP-EN-0726Supporting documentation | Not published | View |
| ES App B-1 Environmental Scoping UpdateSupporting documentation | Not published | View |
| ES - Fig 7 3 [a&b] Oxfordshire Historic Landscape Characterisation IMSE500177-CH2-XX-ZZ-VS-EN-1023 (1)Supporting documentation | Not published | View |
| ES - Fig 7 1 Study Area for Landscape and Visual Impact Assessment IMSE500177-CH2-XX-ZZ-VS-EN-1005Supporting documentation | Not published | View |
| ES - Fig 6 3b Informal Permissive IMSE500177-CH2-XX-ZZ-VS-EN-1020Supporting documentation | Not published | View |
| ES - Fig 5 1 Local community and socio-economic assets IMSE500177-CH2-XX-ZZ-VS-EN-1003Supporting documentation | Not published | View |
| ES - Fig 3 1 Scheme Overview IMSE500177-CH2-XX-ZZ-VS-EN-1025 v3Supporting documentation | Not published | View |
| ES - Fig 16.2 Haul route to the rail sidings IMSE500177-CH2-XX-ZZ-VS-EN-1041Supporting documentation | Not published | View |
| ES App I-7 A&B Local Policy AreasSupporting documentation | Not published | View |
| ES App HRA IMSE500177-CH2-00-00-DT-EN-0012Supporting documentation | Not published | View |
| ES App G EAP IMSE500177-CH2-00-00-DT-EN-0021Supporting documentation | Not published | View |
| ES - Fig 9 1 Hydrological & Wetland Features IMSE500177-CH2-XX-ZZ-VS-EN-1015Supporting documentation | Not published | View |
| ES - Fig 7 7 [a&b] Viewpoint location plan IMSE500177-CH2-XX-ZZ-VS-EN-1010Supporting documentation | Not published | View |
| ES - Fig 6 2a PRoW Oct21 IMSE500177-CH2-XX-ZZ-VS-EN-1022Supporting documentation | Not published | View |
| ES - Fig 3 3 Old Abingdon Road Kennington Road temporary diversion route IMSE500177-CH2-BAR-A4D-DR-PL-0002Supporting documentation | Not published | View |
| ES - Fig 13 2 AQ Management areas and Local Authority AQ Monitoring IMSE500177-CH2-XX-ZZ-VS-EN-1020 (1)Supporting documentation | Not published | View |
| ES Appendix D-18 Water vole Survey 2020 IMSE500177-CH2-XX-00-SU-EN-0732Supporting documentation | Not published | View |
| ES Appendix D-17 Water vole survey 2018 IMSE500177-CH2-XX-00-SU-EN-0736Supporting documentation | Not published | View |
| ES Appendix D-14 Reptile Survey IMSE500177-CH2-XX-00-SU-EN-0729Supporting documentation | Not published | View |
| ES Appendix D-12 Bat Surveys 2020 IMSE500177-CH2-XX-00-RP-EN-0733Supporting documentation | Not published | View |
| ES Appendix D-11 Bat Surveys 2018Supporting documentation | Not published | View |
| ES App J-7 Eval Report FigsPlatesSupporting documentation | Not published | View |
| ES App J-5 Fig 27 onwardsSupporting documentation | Not published | View |
| ES App I-3 OFRMS Landscape CharacterSupporting documentation | Not published | View |
| ES App C-5 Appendix E Cross sections and possible restoration areasSupporting documentation | Not published | View |
| ES App C-5 Appendix B MG4 Grassland Translocation MethodologySupporting documentation | Not published | View |
| ES - Fig 7 5 [a&b] Regional Character Areas IMSE500177-CH2-XX-ZZ-VS-EN-1008Supporting documentation | Not published | View |
| ES - Fig 10 1 Archaeological Remains IMSE500177-CH2-XX-ZZ-VS-EN-1030Supporting documentation | Not published | View |
| Statement of Community Involvement Appendices A to DSupporting documentation | Not published | View |
| IMSE500177-CH2-ZZ-ZZ-RP-UT-0281 - Utilities StatementSupporting documentation | Not published | View |
| IMSE500177-CH2-00-00-RP-HY-0145 Flood Risk AssessmentSupporting documentation | Not published | View |
| FRA Appendix G - Residual Uncertainty AnalysisSupporting documentation | Not published | View |
| FRA Appendix B - Modelling Report (1)Supporting documentation | Not published | View |
| ES Appendix J-2 Appendix 10-141216Supporting documentation | Not published | View |
| Statement of Community InvolvmentSupporting documentation | Not published | View |
| OFAS Covering letter 250222Supporting documentation | Not published | View |
| 2022-06-10 Officer ResponseDecision | Not published | View |
| D (BS) OFAS - BNG s106 agreement - December 2024 (DRAFT)(55287130.1)Legal Agreement (redacted) | Not published | View |
| Ofas S106 Agreement V16 (clean) 29 06 2026 (DRAFT)Pending | Not published | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.