Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Phase 1a, Valley Park, Land to the West of Great Western Park
Last published check: 12 Oct 2026, 04:47. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
Reserved matters application for access, appearance, landscaping, layout and scale following consent granted under reference P14/V2873/O relating solely to Phase 1a of the overall allocation regarding infrastructure elements to enable works for Phase 1 and 2. An EIA was submitted as part of the approved outline permission (as amplified and amended by information received 16 May 2022, 28 April 2023, 17 August 2023, 4 December 2023, 30 January 2024 and 15 February 2024).
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsPhase 1a, Valley Park, Land to the West of Great Western Park
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| SUPERSEDED Application FormApplication Form | Not published | View |
| Application FormApplication Form | Not published | View |
| SUPERSEDED Tree Pit Details Sheet 2 of 2 drwgno JSL3180 401Other Plans/Information | Not published | View |
| SUPERSEDED Phase 1A Infrastructure Landscape drwgno JSL3180 512 DOther Plans/Information | Not published | View |
| SUPERSEDED Phase 1 Swale Cross Sections-Sheet 5 drwgno 10219-HL-RM1-500-080Other Plans/Information | Not published | View |
| Foul Water Pumping Station Elevation drwgno 10219-HL-RM1-500-034DOther Plans/Information | Not published | View |
| SUPERSEDED Tree and Shrub Palette Northern Hamlet JSL3180 RM1A 553Other Plans/Information | Not published | View |
| SUPERSEDED Tree and Shrub Palette Moore Ditch JSL3180 550 COther Plans/Information | Not published | View |
| SUPERSEDED Phase 1A Infrastructure Landscape drwgno JSL3180 501 JOther Plans/Information | Not published | View |
| SUPERSEDED Highway Works Drainage drwgno 10219-HL-RM1-500- 002ROther Plans/Information | Not published | View |
| Pump Station CGI - View 2Other Plans/Information | Not published | View |
| SUPERSEDED Location Plan drwgno 10219-HL-RM1-100-001EOther Plans/Information | Not published | View |
| SUPERSEDED Ecological Construction Management Plan-Phase 1A Infrastructure V2Other Plans/Information | Not published | View |
| Landscape and Ecology Management Plan-Phase 1a Infrastructure V2Other Plans/Information | Not published | View |
| SUPERSEDED Highway Works Drainage drwgno10219-HL-RM1-500-001XOther Plans/Information | Not published | View |
| Foul Water Pumping Station Plan drwgno 10219-HL-RM1-500-030MOther Plans/Information | Not published | View |
| SUPERSEDED Strategic Arboricultural Method Statement Rev BOther Plans/Information | Not published | View |
| Surface Water Drainage Design Flows drwgno 10219-HL-RM1-500-220AOther Plans/Information | Not published | View |
| SUPERSEDED Site Clearance Plan drwgno 10219-HL-RM1-100-011KOther Plans/Information | Not published | View |
| SUPERSEDED Highway Works - Longitudinal drwgno 10219-HL-RM1-400-002FOther Plans/Information | Not published | View |
| SUPERSEDED Drainage Excedance Plan drwgno 10219-HL-RM1-500-205FOther Plans/Information | Not published | View |
| SUPERSEDED Tree Pit Details Sheet 1 of 2 drwgno JSL3180 400Other Plans/Information | Not published | View |
| SUPERSEDED Phase 1A Infrastructure Landscape drwgno JSL3180 502 IOther Plans/Information | Not published | View |
| SUPERSEDED Northern Hamlet LEAP drwgno JSL 3180 520 BOther Plans/Information | Not published | View |
| SUPERSEDED Retained Watercourse Buffer Zone Scheme V2Other Plans/Information | Not published | View |
| Surface Water Catchment Plan drwgno 10219-HL-RM1-500-200FOther Plans/Information | Not published | View |
| SUPERSEDED Visibility Plan drwgno 10219-HL-RM1-100-007OOther Plans/Information | Not published | View |
| SUPERSEDED Temporary Bus Turning Head drwgno 10219-HL-RM1-100-021AOther Plans/Information | Not published | View |
| SUPERSEDED Junction Tracking drwgno 10219-HL-RM1-100-020BOther Plans/Information | Not published | View |
| SUPERSEDED Composite Plan drwgno 10219-HL-RM1-100-015FOther Plans/Information | Not published | View |
| SUPERSEDED Tree Removal and Protection Plan 1 of 3 drwgno JSL3180 721BOther Plans/Information | Not published | View |
| SUPERSEDED Arboricultural Assessment and Method Statement Addendum rev DOther Plans/Information | Not published | View |
| SUPERSEDED Tree and Shrub Palette Northern Wetlands JSL3180 RM1A 551AOther Plans/Information | Not published | View |
| SUPERSEDED Phase 1A Infrastructure Landscape drwgno JSL3180 511 DOther Plans/Information | Not published | View |
| SUPERSEDED Biodiversity Enhancement Plan V2Other Plans/Information | Not published | View |
| Typical Sections drwgno 10219-HL-RM1-100-006EOther Plans/Information | Not published | View |
| SUPERSEDED Planning Layout drwgno 10219-HL-RM1-100-004TOther Plans/Information | Not published | View |
| SUPERSEDED Tree Removal and Protection Plan 2 of 3 drwgno JSL3180 722BOther Plans/Information | Not published | View |
| 2023-04-21 Covering letter Phase 1aOther Plans/Information | Not published | View |
| Substation Elevations & Floor Plan drwgno HT-SUBST-01Other Plans/Information | Not published | View |
| SUPERSEDED Tracking Plan drwgno 10219-HL-RM1-100-008POther Plans/Information | Not published | View |
| SUPERSEDED Lighting Layout drwgno 10219-HL-RM1-100-1300EOther Plans/Information | Not published | View |
| SUPERSEDED Highway Works GA drwgno 10219-HL-RM1-100-003TOther Plans/Information | Not published | View |
| SUPERSEDED Cross Sections drwgno 10219-HL-RM1-400-003FOther Plans/Information | Not published | View |
| SUPERSEDED Construction detail sheet 2 drwgno 10219-HL-RM1-100-110AOther Plans/Information | Not published | View |
| Cut and Fill Isopachyte Plan drwgno 10219-HL-RM1-602-001Other Plans/Information | Not published | View |
| SUPERSEDED Tree Removal and Protection Plan 3 of 3 drwgno JSL3180 723BOther Plans/Information | Not published | View |
| SUPERSEDED Phase 1A Infrastructure Landscape drwgno JSL3180 503 FOther Plans/Information | Not published | View |
| Landscape Management Plan rev BOther Plans/Information | Not published | View |
| Pump Station CGI - View 1Other Plans/Information | Not published | View |
| Application P22 V0604 RM planning comments responseOther Plans/Information | Not published | View |
| SUPERSEDED Phase 1 Basins Layout and Sections-Sheet 2 of 2 drwgno 10219-HL-RM1-500-021DOther Plans/Information | Not published | View |
| SUPERSEDED Foul Water Catchment Plan drwgno 10219-HL-RM1-500-210FOther Plans/Information | Not published | View |
| Drainage Standard Details drwgno 10219-HL-RM1-500-040COther Plans/Information | Not published | View |
| SUPERSEDED Phase 1 Swale Cross Sections-Sheet 2 of 4 drwgno 10219-HL-RM1-500-024HOther Plans/Information | Not published | View |
| SUPERSEDED Phase 1 Swale Cross Sections-Sheet 1 of 4 drwgno 10219-HL-RM1-500-023FOther Plans/Information | Not published | View |
| SUPERSEDED Phase 1 Basins Layout and Sections-Sheet 1 of 2 drwgno 10219-HL-RM1-500-020FOther Plans/Information | Not published | View |
| SUPERSEDED Highways Works Proposed Levels drwgno 10219-HL-RM1-400-001NOther Plans/Information | Not published | View |
| SUPERSEDED Planning Compliance Statement Phase 1a April 2023Other Plans/Information | Not published | View |
| JSL3180 401 Tree Pit Details Sheet 2 of 2Other Plans/Information | Not published | View |
| SUPERSEDED 10219-HL-RM1-500-020K - Phase 1 Basins Layout and Sections - Sheet 1 of 4Other Plans/Information | Not published | View |
| JSL3180 512 F Phase 1A Infrastructure LandscapeOther Plans/Information | Not published | View |
| Security Screen Assessment 300mm Headwalls from CarriagewayOther Plans/Information | Not published | View |
| SUPERSEDED 10219-HL-RM1-500-323C - Phase 1 Basins Layout and Sections - Sheet 4 of 4Other Plans/Information | Not published | View |
| 10219-HL-RM1-500-105G Drainage Scale 1 to 500 Sheet 5Other Plans/Information | Not published | View |
| 10219-HL-RM1-500-060C- Headwall DetailsOther Plans/Information | Not published | View |
| 10219-HL-RM1-500-011J - Drainage Longitudinal Sections Sheet 2 of 7Other Plans/Information | Not published | View |
| JSL3180 771 F Arboricultural Assessment and Method Statement AddendumOther Plans/Information | Not published | View |
| JSL3180 602 Landscape Management AreasOther Plans/Information | Not published | View |
| JSL3180 601 Hedgerow Overview PlanOther Plans/Information | Not published | View |
| JSL3180 520D Northern Hamlet LEAPOther Plans/Information | Not published | View |
| Debris Screen Assessment 1200mm dia outfall to Basin 1BOther Plans/Information | Not published | View |
| 10219-HL-RM1-500-104J Drainage Scale 1 to 500 Sheet 4Other Plans/Information | Not published | View |
| 10219-HL-RM1-500-014E - Drainage Longitudinal Sections-Sheet 5 of 7Other Plans/Information | Not published | View |
| 10219-HL-RM1-400-003H Cross SectionsOther Plans/Information | Not published | View |
| 10219-HL-RM1-100-110B Construction details - Sheet 2Other Plans/Information | Not published | View |
| 10219-HL-RM1-100-025B Highway GeometryOther Plans/Information | Not published | View |
| 10219-HL-RM1-100-021D Temporary Bus Turning HeadOther Plans/Information | Not published | View |
| Debris Screen Assessment 375mm dia outfall to Cow LaneOther Plans/Information | Not published | View |
| SUPERSEDED 10219-HL-RM1-500-322A - Phase 1 Basins Layout and Sections - Sheet 3 of 4Other Plans/Information | Not published | View |
| SUPERSEDED Ecology Construction Management Plan - Phase 1aOther Plans/Information | Not published | View |
| JSL3180 RM1A 553B Tree and Shrub Palette Northen Hamlet LEAPOther Plans/Information | Not published | View |
| JSL3180 RM1A 550E Tree and Shrub Palette Moore DitchOther Plans/Information | Not published | View |
| 10219-HL-RM1-500-101L Drainage Scale 1 to 500 Sheet 1Other Plans/Information | Not published | View |
| 10219-HL-RM1-500-016E - Drainage Longitudinal Sections-Sheet 7 of 7Other Plans/Information | Not published | View |
| 10219-HL-RM1-100-003X Highway Works GAOther Plans/Information | Not published | View |
| 10219-HL-RM1-500-210J- Foul Water Catchment PlanOther Plans/Information | Not published | View |
| 10219-HL-RM1-500-102J Drainage Scale 1 to 500 Sheet 2Other Plans/Information | Not published | View |
| 10219-HL-RM1-400-001S Proposed LevelsOther Plans/Information | Not published | View |
| 10219-HL-RM1-100-015J Composite PlanOther Plans/Information | Not published | View |
| 10219-HL-RM1-100-008T Tracking Sheet 1Other Plans/Information | Not published | View |
| JSL3180 RM1A 551D Tree and Shrub Palette Northern WetlandsOther Plans/Information | Not published | View |
| JSL3180 604 HIF Safeguarding Land Impact to Landscape Proposals Sheet 2 of 2Other Plans/Information | Not published | View |
| JSL3180 603 HIF Safeguarding Land Impact to Landscape Proposals Sheet 1 of 2Other Plans/Information | Not published | View |
| JSL3180 560 B Soft Landscape SpecificationOther Plans/Information | Not published | View |
| JSL3180 501M Phase 1A Infrastructure LandscapeOther Plans/Information | Not published | View |
| 10219-HL-RM1-DR-150K - Basins and Swales Layout, Phase 1AOther Plans/Information | Not published | View |
| 10219-HL-RM1-602-001C Cut and Fill Isopachyte PlanOther Plans/Information | Not published | View |
| 10219-HL-RM1-500-107G Drainage Scale 1 to 500 Sheet 7Other Plans/Information | Not published | View |
| 10219-HL-RM1-500-106H Drainage Scale 1 to 500 Sheet 6Other Plans/Information | Not published | View |
| SUPERSEDED 10219-HL-RM1-500-001AC Highway Works Drainage Sheet 1Other Plans/Information | Not published | View |
| 10219-HL-RM1-500-205J- Excedance PlanOther Plans/Information | Not published | View |
| 10219-HL-RM1-500-065B - Headwall Details Screen & Gating DetailsOther Plans/Information | Not published | View |
| JSL3180 723C Tree Removal and Protection Plan 3 of 3Other Plans/Information | Not published | View |
| JSL3180 511 E Phase 1A Infrastructure LandscapeOther Plans/Information | Not published | View |
| SUPERSEDED 10219-HL-RM1-500-024K - Phase 1 Swale Cross Sections-Sheet 2 of 4Other Plans/Information | Not published | View |
| 10219-HL-RM1-500-220B Surface Water Drainage Design FlowsOther Plans/Information | Not published | View |
| 10219-HL-RM1-500-103K Drainage Scale 1 to 500 Sheet 3Other Plans/Information | Not published | View |
| 10219-HL-RM1-500-015E - Drainage Longitudinal Sections-Sheet 6 of 7Other Plans/Information | Not published | View |
| 10219-HL-RM1-500-012F - Drainage Longitudinal Sections-Sheet 3 of 7Other Plans/Information | Not published | View |
| 10219-HL-RM1-400-002G Longitudinal SectionsOther Plans/Information | Not published | View |
| 10219-HL-RM1-100-011Q Site ClearanceOther Plans/Information | Not published | View |
| JSL3180 770 B Strategic Arboricultural Method StatementOther Plans/Information | Not published | View |
| JSL3180 721D Tree Removal and Protection Plan 1 of 3Other Plans/Information | Not published | View |
| JSL3180 401 Tree Pit Details Sheet 2 of 2Other Plans/Information | Not published | View |
| JSL3180 400 Tree Pit Details Sheet 1 of 2Other Plans/Information | Not published | View |
| SUPERSEDED 10219-HL-RM1-500-002U Highway Works Drainage Sheet 2Other Plans/Information | Not published | View |
| 10219-HL-RM1-500-080A- Phase 1 Swale Cross Sections- Sheet 5 of 5Other Plans/Information | Not published | View |
| 10219-HL-RM1-100-020E Tracking Sheet 2Other Plans/Information | Not published | View |
| 10219-HL-RM1-100-004X Highway Planning LayoutOther Plans/Information | Not published | View |
| 10219-HL-RM1-100-002T Highway Works S38Other Plans/Information | Not published | View |
| JSL3180 503 I Phase 1A Infrastructure LandscapeOther Plans/Information | Not published | View |
| Security Screen Assessment 375 dia outfall to Cow LaneOther Plans/Information | Not published | View |
| Security Screen Assessment 1200mm Dia pipe basin B1Other Plans/Information | Not published | View |
| SUPERSEDED 10219-HL-RM1-500-026H - Phase 1 Swale Cross Sections-Sheet 4 of 4Other Plans/Information | Not published | View |
| SUPERSEDED 10219-HL-RM1-500-021F - Phase 1 Basins Layout and Sections - Sheet 2 of 4Other Plans/Information | Not published | View |
| JSL3180 502L Phase 1A Infrastructure LandscapeOther Plans/Information | Not published | View |
| JSL3180 400 Tree Pit Details Sheet 1 of 2Other Plans/Information | Not published | View |
| SUPERSEDED 10219-HL-RM1-500-023K - Phase 1 Swale Cross Sections-Sheet 1 of 4Other Plans/Information | Not published | View |
| SUPERSEDED 10219-HL-RM1-100-007R VisibilityOther Plans/Information | Not published | View |
| 10219-HL-RM1-500-013F - Drainage Longitudinal Sections-Sheet 4 of 7Other Plans/Information | Not published | View |
| 10219-HL-RM1-500-010K - Drainage Longitudinal Sections-Sheet 1 of 7Other Plans/Information | Not published | View |
| 10219-HL-RM1-100-1300G Lighting LayoutOther Plans/Information | Not published | View |
| 10219-HL-RM1-100-026A-Infrastructure Flood Zone OverlaidOther Plans/Information | Not published | View |
| JSL3180 722D Tree Removal and Protection Plan 2 of 3Other Plans/Information | Not published | View |
| 10219-HL-RM1-100-007S VisibilityOther Plans/Information | Not published | View |
| Ecology Constraint Plans fig.1a & 1bOther Plans/Information | Not published | View |
| SUPERSEDED Retained Watercourse Buffer Zone SchemeOther Plans/Information | Not published | View |
| Phase 1 Habitat Survey fig.1aOther Plans/Information | Not published | View |
| Phase 1 Infrastructure Tree Protection & Watercourse Buffer Zones fig.3aOther Plans/Information | Not published | View |
| SUPERSEDED Highway Works Drainage drwgno10219-HL-RM1-500-001POther Plans/Information | Not published | View |
| SUPERSEDED Highway Works - Longitudinal drwgno 10219-HL-RM1-400-002 COther Plans/Information | Not published | View |
| SUPERSEDED Drainage Standard Details drwgno 10219-HL-RM1-500-040BOther Plans/Information | Not published | View |
| SUPERSEDED Drainage Longitudinal Sections-Sheet 4 of 7 drwgno 10219-HL-RM1-500-013BOther Plans/Information | Not published | View |
| SUPERSEDED Construction details drwgno 10219-HL-RM1-100-009BOther Plans/Information | Not published | View |
| SUPERSEDED Site Clearance Plan drwgno 10219-HL-RM1-100-011COther Plans/Information | Not published | View |
| SUPERSEDED Phase 1A Infrastructure Landscape drwgno JSL3180 502 E Rev FOther Plans/Information | Not published | View |
| SUPERSEDED Phase 1 Foul Water Rising Main Longitudinal Section- Sheet 2 of 2 drwgno10219-HL-RM1-500-033COther Plans/Information | Not published | View |
| SUPERSEDED Highway Works GA drwgno 10219-HL-RM1-100-003NOther Plans/Information | Not published | View |
| SUPERSEDED Foul Water Pumping Station Elevation drwgno 10219-HL-RM1-500-034AOther Plans/Information | Not published | View |
| SUPERSEDED Typical Sections drwgno 10219-HL-RM1-100-006BOther Plans/Information | Not published | View |
| SUPERSEDED Tree Protection & Removal Plan drwgno JSL3180 712 BOther Plans/Information | Not published | View |
| SUPERSEDED Tree Protection & Removal Plan drwgno JSL3180 702 COther Plans/Information | Not published | View |
| SUPERSEDED Phase 1A Infrastructure Landscape drwgno JSL3180 503 C Rev DOther Plans/Information | Not published | View |
| SUPERSEDED Lighting Layout drwgno 10219-HL-RM1-100-1300Other Plans/Information | Not published | View |
| SUPERSEDED Drainage Longitudinal Sections-Sheet 2 of 7 drwgno 10219-HL-RM1-500-011DOther Plans/Information | Not published | View |
| SUPERSEDED Foul Water Catchment Plan drwgno 10219-HL-RM1-500-210COther Plans/Information | Not published | View |
| SUPERSEDED Drainage Longitudinal Sections-Sheet 7 of 7 drwgno 10219-HL-RM1-500-016AOther Plans/Information | Not published | View |
| SUPERSEDED Drainage Longitudinal Sections-Sheet 6 of 7 drwgno 10219-HL-RM1-500-015AOther Plans/Information | Not published | View |
| SUPERSEDED Drainage Excedance Plan drwgno 10219-HL-RM1-500-205COther Plans/Information | Not published | View |
| SUPERSEDED Tree Protection & Removal Plan drwgno JSL3180 715AOther Plans/Information | Not published | View |
| SUPERSEDED Tree Protection & Removal Plan drwgno JSL3180 701 COther Plans/Information | Not published | View |
| SUPERSEDED Phase 1 Swale Cross Sections-Sheet 3 of 4 drwgno 10219-HL-RM1-500-025BOther Plans/Information | Not published | View |
| SUPERSEDED Phase 1 Basins Layout and Sections-Sheet 2 of 2 drwgno 10219-HL-RM1-500-021COther Plans/Information | Not published | View |
| SUPERSEDED Phase 1 Basins Layout and Sections-Sheet 1 of 2 drwgno 10219-HL-RM1-500-020COther Plans/Information | Not published | View |
| SUPERSEDED Land Ownership drwgno 10219-HL-RM1-100-005EOther Plans/Information | Not published | View |
| SUPERSEDED Visibility Plan drwgno 10219-HL-RM1-100-007JOther Plans/Information | Not published | View |
| SUPERSEDED Tree Protection & Removal Plan drwgno JSL3180 705 BOther Plans/Information | Not published | View |
| SUPERSEDED Phase 1A Infrastructure Landscape drwgno JSL3180 511 Rev AOther Plans/Information | Not published | View |
| SUPERSEDED Foul Water Pumping Station Plan drwgno 10219-HL-RM1-500-030FOther Plans/Information | Not published | View |
| SUPERSEDED Drainage Longitudinal Sections-Sheet 1 of 7 drwgno 10219-HL-RM1-500-010DOther Plans/Information | Not published | View |
| SUPERSEDED Tree Protection & Removal Plan drwgno JSL3180 711 BOther Plans/Information | Not published | View |
| SUPERSEDED Phase 1A Infrastructure Landscape drwgno JSL3180 501 E Rev FOther Plans/Information | Not published | View |
| SUPERSEDED Planning Layout drwgno 10219-HL-RM1-100-004NOther Plans/Information | Not published | View |
| SUPERSEDED Highway Works Drainage drwgno 10219-HL-RM1-500- 002JOther Plans/Information | Not published | View |
| SUPERSEDED Control Manhole Details drwgno 10219-HL-RM1-500-027COther Plans/Information | Not published | View |
| SUPERSEDED Tree Protection & Removal Plan drwgno JSL3180 703 COther Plans/Information | Not published | View |
| SUPERSEDED Tracking Plan drwgno 10219-HL-RM1-100-008JOther Plans/Information | Not published | View |
| SUPERSEDED Redline Plan drwgno 10219-HL-RM1-100-010SOther Plans/Information | Not published | View |
| SUPERSEDED Phase 1A Infrastructure Landscape drwgno JSL3180 512 Rev AOther Plans/Information | Not published | View |
| SUPERSEDED Phase 1 Swale Cross Sections-Sheet 4 of 4 drwgno 10219-HL-RM1-500-026FOther Plans/Information | Not published | View |
| SUPERSEDED Phase 1 Swale Cross Sections-Sheet 2 of 4 drwgno 10219-HL-RM1-500-024GOther Plans/Information | Not published | View |
| SUPERSEDED Location Plan drwgno 10219-HL-RM1-100-001BOther Plans/Information | Not published | View |
| SUPERSEDED Drainage Longitudinal Sections-Sheet 5 of 7 drwgno 10219-HL-RM1-500-014AOther Plans/Information | Not published | View |
| SUPERSEDED Drainage Longitudinal Sections-Sheet 3 of 7 drwgno 10219-HL-RM1-500-012BOther Plans/Information | Not published | View |
| SUPERSEDED Cross Sections drwgno 10219-HL-RM1-400-003COther Plans/Information | Not published | View |
| SUPERSEDED Check Dam Detail drwgno 10219-HL-RM1-500-022COther Plans/Information | Not published | View |
| SUPERSEDED Surface Water Catchment Plan drwgno 10219-HL-RM1-500-200COther Plans/Information | Not published | View |
| SUPERSEDED Basins and Swales Layout Phase 1A drwgno10219-HL-RM1-DR-150COther Plans/Information | Not published | View |
| Planning Compliance Statement Phase 1a fv with appendicesOther Plans/Information | Not published | View |
| Retained Watercourse Buffer Zone SchemeOther Plans/Information | Not published | View |
| SUPERSEDED Retained Watercourse Buffer Zone SchemeOther Plans/Information | Not published | View |
| Ecology Construction Management Plan - Phase 1aOther Plans/Information | Not published | View |
| Play Area Proposal Plan drwgno OP1001Other Plans/Information | Not published | View |
| 10219 TN55 Rv0 - Valley Park RM1A FEH Rainfall Data Sensitivity Check ISSUEDOther Plans/Information | Not published | View |
| SUPERSEDED Temporary Bus Turning Head drwgno 10219-HL-RM1-100-021BOther Plans/Information | Not published | View |
| SUPERSEDED Longitudinal Sections drwgno 10219-HL-RM1-400-002GOther Plans/Information | Not published | View |
| SUPERSEDED Highway Works S38 drwgno 10219-HL-RM1-100-002ROther Plans/Information | Not published | View |
| SUPERSEDED Tree Removal and Protection Plan 3 of 3 drwgno JSL3180 723 BOther Plans/Information | Not published | View |
| Hedgerow Overview Plan drwgno JSL3180 601Other Plans/Information | Not published | View |
| SUPERSEDED Phase 1A Infrastructure Landscaping drwgno JSL3180 512 EOther Plans/Information | Not published | View |
| SUPERSEDED Phase 1A Infrastructure Landscaping drwgno JSL3180 511 EOther Plans/Information | Not published | View |
| SUPERSEDED Tracking Plan Sheet 1 drwgno 10219-HL-RM1-100-008ROther Plans/Information | Not published | View |
| SUPERSEDED Surface Water Drainage Design Flows drwgno 10219-HL-RM1-500-220BOther Plans/Information | Not published | View |
| SUPERSEDED Phase 1 Basins Layout and Sections - Sheet 4 of 4 drwgno 10219-HL-RM1-500-323Other Plans/Information | Not published | View |
| SUPERSEDED Highway Planning Layout drwgno 10219-HL-RM1-100-004VOther Plans/Information | Not published | View |
| SUPERSEDED Highway Geometry drwgno 10219-HL-RM1-100-025 Other Plans/Information | Not published | View |
| Tree Removal and Protection Plan drwgno PHW24093-03B 1POther Plans/Information | Not published | View |
| SUPERSEDED Soft Landscape Specification JSL3180 560 BOther Plans/Information | Not published | View |
| SUPERSEDED Landscape Management Areas Plan drwgno JSL3180 602Other Plans/Information | Not published | View |
| 092 - RM1A Comments Response ScheduleOther Plans/Information | Not published | View |
| SUPERSEDED Drainage Longitudinal Sections-Sheet 1 of 7 drwgno 10219-HL-RM1-500-010JOther Plans/Information | Not published | View |
| SUPERSEDED Phase 1A Infrastructure Landscaping drwgno JSL3180 502 JOther Plans/Information | Not published | View |
| SUPERSEDED Northern Hamlet LEAP drwgno JSL3180 520 COther Plans/Information | Not published | View |
| SUPERSEDED Site Clearance Plan drwgno 10219-HL-RM1-100-011NOther Plans/Information | Not published | View |
| SUPERSEDED Infrastructure Flood Zone Overlaid drwgno 10219-HL-RM1-100-026Other Plans/Information | Not published | View |
| SUPERSEDED Highway Works Proposed Levels drwgno 10219-HL-RM1-400-001POther Plans/Information | Not published | View |
| SUPERSEDED Highway Works GA drwgno 10219-HL-RM1-100-003VOther Plans/Information | Not published | View |
| SUPERSEDED Highway Works Drainage Sheet 1 drwgno 10219-HL-RM1-500-001ZOther Plans/Information | Not published | View |
| SUPERSEDED Excedance Plan drwgno 10219-HL-RM1-500-205HOther Plans/Information | Not published | View |
| SUPERSEDED Drainage Scale 1 to 500 Sheet 4 drwgno 10219-HL-RM1-500-104GOther Plans/Information | Not published | View |
| SUPERSEDED Drainage Longitudinal Sections-Sheet 2 of 7 drwgno 10219-HL-RM1-500-011H -Other Plans/Information | Not published | View |
| SUPERSEDED Cut and Fill Isopachyte Plan drwgno 10219-HL-RM1-602-001AOther Plans/Information | Not published | View |
| SUPERSEDED Cross Sections drwgno 10219-HL-RM1-400-003GOther Plans/Information | Not published | View |
| SUPERSEDED Composite Plan drwgno 10219-HL-RM1-100-015GOther Plans/Information | Not published | View |
| 1T Tree Removal and Protection Plan drwgno TW 720 Rev AOther Plans/Information | Not published | View |
| SUPERSEDED Ecological Construction Management Plan - Phase 1A Infrastructure V2 August 2023Other Plans/Information | Not published | View |
| Valley Park Didcot Spine Road 1 checked DROther Plans/Information | Not published | View |
| SUPERSEDED Surface Water Catchment Plan drwgno 10219-HL-RM1-500-200HOther Plans/Information | Not published | View |
| SUPERSEDED Foul Water Catchment Plan drwgno 10219-HL-RM1-500-210HOther Plans/Information | Not published | View |
| SUPERSEDED Drainage Longitudinal Sections-Sheet 3 of 7 drwgno 10219-HL-RM1-500-012FOther Plans/Information | Not published | View |
| SUPERSEDED Basins and Swales Layout, Phase 1A drwgno 10219-HL-RM1-DR-150JOther Plans/Information | Not published | View |
| SUPERSEDED Tree Removal and Protection Plan 1 of 3 drwgno JSL3180 721 COther Plans/Information | Not published | View |
| SUPERSEDED Tree and Shrub Palette Northern Hamlet drwgno JSL3180 RM1A 553 AOther Plans/Information | Not published | View |
| SUPERSEDED Visibility Plan drwgno 10219-HL-RM1-100-007QOther Plans/Information | Not published | View |
| SUPERSEDED Phase 1 Basins Layout and Sections - Sheet 2 of 4 drwgno 10219-HL-RM1-500-021EOther Plans/Information | Not published | View |
| SUPERSEDED Phase 1 Basins Layout and Sections - Sheet 1 of 4 drwgno 10219-HL-RM1-500-020HOther Plans/Information | Not published | View |
| SUPERSEDED Drainage Scale 1 to 500 Sheet 3 drwgno 10219-HL-RM1-500-103GOther Plans/Information | Not published | View |
| 05.06.23 SW Network 1Other Plans/Information | Not published | View |
| SUPERSEDED Tree Removal and Protection Plan 2 of 3 drwgno JSL3180 722 COther Plans/Information | Not published | View |
| SUPERSEDED Phase 1A Infrastructure Landscaping drwgno JSL3180 503 GOther Plans/Information | Not published | View |
| SUPERSEDED Retained Watercourse Buffer Zone Scheme V2 August 2023Other Plans/Information | Not published | View |
| Biodiversity Enhancement Plan V2 August 2023Other Plans/Information | Not published | View |
| SUPERSEDED Redline Plan drwgno 10219-HL-RM1-100-010YOther Plans/Information | Not published | View |
| SUPERSEDED Phase 1 Basins Layout and Sections - Sheet 3 of 4 drwgno 10219-HL-RM1-500-322Other Plans/Information | Not published | View |
| SUPERSEDED Headwall Details drwgno 10219-HL-RM1-500-060COther Plans/Information | Not published | View |
| SUPERSEDED Screen and Grating Detail drwgno 10219-HL-RM1-500-065Other Plans/Information | Not published | View |
| SUPERSEDED Phase 1 Swale Cross Sections-Sheet 2 of 4 drwgno 10219-HL-RM1-500-024JOther Plans/Information | Not published | View |
| SUPERSEDED Phase 1 Swale Cross Sections-Sheet 1 of 4 drwgno 10219-HL-RM1-500-023HOther Plans/Information | Not published | View |
| SUPERSEDED Lighting Layout drwgno 10219-HL-RM1-100-1300FOther Plans/Information | Not published | View |
| SUPERSEDED Drainage Scale 1 to 500 Sheet 2 drwgno 10219-HL-RM1-500-102GOther Plans/Information | Not published | View |
| SUPERSEDED Drainage Scale 1 to 500 Sheet 1 drwgno 10219-HL-RM1-500-101GOther Plans/Information | Not published | View |
| SUPERSEDED Phase 1A Infrastructure Landscaping drwgno JSL3180 501 KOther Plans/Information | Not published | View |
| SUPERSEDED Tracking Sheet 2 drwgno 10219-HL-RM1-100-020DOther Plans/Information | Not published | View |
| SUPERSEDED Highway Works Drainage Sheet 2 drwgno 10219-HL-RM1-500-002TOther Plans/Information | Not published | View |
| SUPERSEDED Drainage Longitudinal Sections-Sheet 4 of 7 drwgno 10219-HL-RM1-500-013FOther Plans/Information | Not published | View |
| 10219 - Drawing Register RM1A 2023.08.15Other Plans/Information | Not published | View |
| Strategic Arboricultural Method Statement JSL3180 770 BOther Plans/Information | Not published | View |
| SUPERSEDED Tree and Shrub Palette Northern Wetlands drwgno JSL3180 RM1A 551 BOther Plans/Information | Not published | View |
| SUPERSEDED Headwall Details drwgno 10219-HL-RM1-500-060COther Plans/Information | Not published | View |
| SUPERSEDED Earthworks drwgno 10219-HL-RM1-600-001LOther Plans/Information | Not published | View |
| SUPERSEDED Highway Works S38 drwgno 10219-HL-RM1-100-002LOther Plans/Information | Not published | View |
| SUPERSEDED Highways Works Proposed Levels drwgno 10219-HL-RM1-400-001FOther Plans/Information | Not published | View |
| SUPERSEDED Traffic Signs and Road Markings drwgno10219-HL-RM1-1200-001KOther Plans/Information | Not published | View |
| SUPERSEDED Phase 1 Swale Cross Sections-Sheet 1 of 4 drwgno 10219-HL-RM1-500-023DOther Plans/Information | Not published | View |
| SUPERSEDED Phase 1 Foul Water Rising Main-Sheet 1 of 2 drwgno 10219-HL-RM1-500-032BOther Plans/Information | Not published | View |
| SUPERSEDED Kerbs Footways and Paved Areas drwgno 10219-HL-RM1-1100-001JOther Plans/Information | Not published | View |
| 10219-SK-RM1-052 - Cow Lane Amended Ditch Plan Sheet 1 2Other Plans/Information | Not published | View |
| 10219-SK-415A Watercourse Clearance 1Other Plans/Information | Not published | View |
| 10219-SK-RM1-053 - Cow Lane Amended Ditch Plan Sheet 2 2Other Plans/Information | Not published | View |
| Application P22 V0604 RM planning comments responseOther Plans/Information | Not published | View |
| Appendix 1 Schedule of Compliance 2Other Plans/Information | Not published | View |
| Security Screen Assessment HWS79Other Plans/Information | Not published | View |
| Security Screen Assessment 375 dia outfall to Cow LaneOther Plans/Information | Not published | View |
| Security Screen Assessment HWS53Other Plans/Information | Not published | View |
| 10219-HL-RM1-500-024L - Phase 1 Swale Cross Sections-Sheet 2 of 4Other Plans/Information | Not published | View |
| 10219-HL-RM1-500-020L - Phase 1 Basins Layout and Sections - Sheet 1 of 4Other Plans/Information | Not published | View |
| 10219-HL-RM1-500-323D - Phase 1 Basins Layout and Sections - Sheet 4 of 4Other Plans/Information | Not published | View |
| 10219-HL-RM1-500-004C S104 Drainage Sheet 2Other Plans/Information | Not published | View |
| Security Screen Assessment 1200mm Dia pipe basin B1Other Plans/Information | Not published | View |
| 10219-HL-RM1-500-325A - Basin Contour PlanOther Plans/Information | Not published | View |
| 10219-HL-RM1-500-200L- Surface Water Catchment PlanOther Plans/Information | Not published | View |
| 10219-HL-RM1-500-021G - Phase 1 Basins Layout and Sections - Sheet 2 of 4Other Plans/Information | Not published | View |
| 10219-HL-RM1-500-324 - Phase 1 Basins Layout and Sections - Sheet 5 of 5Other Plans/Information | Not published | View |
| 10219-HL-RM1-500-026J - Phase 1 Swale Cross Sections-Sheet 4 of 4Other Plans/Information | Not published | View |
| 10219-HL-RM1-500-322B - Phase 1 Basins Layout and Sections - Sheet 3 of 4Other Plans/Information | Not published | View |
| Security Screen Assessment HWS74Other Plans/Information | Not published | View |
| 10219-HL-RM1-500-023L - Phase 1 Swale Cross Sections-Sheet 1 of 4Other Plans/Information | Not published | View |
| 10219-HL-RM1-500-003D S104 Drainage Sheet 1Other Plans/Information | Not published | View |
| SUPERSEDED Substation Elevations & Floor Plan drwgno 32582 HT -01Other Plans/Information | Not published | View |
| 092 - RM1A Comments Response Schedule 30.11.23General Plan | Not published | View |
| 10219-HL-RM1-100-010AA Redline PlanGeneral Plan | Not published | View |
| SUPERSEDED Ecological Construction Management Plan – Phase 1 InfrastructureSupporting documentation | Not published | View |
| SUPERSEDED Soft landscape SpecificationSupporting documentation | Not published | View |
| SUPERSEDED Planning Compliance Statement Phase 1aSupporting documentation | Not published | View |
| SUPERSEDED Site Waste Management PlanSupporting documentation | Not published | View |
| SUPERSEDED Landscape Management PlanSupporting documentation | Not published | View |
| SUPERSEDED ValleyPark LEAPSupporting documentation | Not published | View |
| SUPERSEDED Landscape and Ecology Management Plan – Phase 1a InfrastructureSupporting documentation | Not published | View |
| Tree Survey ReportSupporting documentation | Not published | View |
| SUPERSEDED Strategic Arboricultural Method Statement Rev ASupporting documentation | Not published | View |
| Covering LetterSupporting documentation | Not published | View |
| Transport AssessmentSupporting documentation | Not published | View |
| SUPERSEDED Biodiversity Enhancement PlanSupporting documentation | Not published | View |
| SUPERSEDED Arboricultural Assessment and Method Statement AddendumSupporting documentation | Not published | View |
| SUPERSEDED Tree and Shrub Palette - JSL3180 550 BSupporting documentation | Not published | View |
| Block Plan drwgno PL-03 A with AB obsPre-application advice given | Not published | View |
| 2021-12-13 Officer ResponsePre-application advice given | Not published | View |
| Pre Application EnquiryPre-application advice given | Not published | View |
| Block Plan drwgno PL-03 APre-application advice given | Not published | View |
| Location Plan drwgno PL-01Pre-application advice given | Not published | View |
| Application FormPre-application advice given | Not published | View |
| Decision NoticeDecision | Not published | View |
| Officer reportDecision | Not published | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.