Loft conversion and changing flat roof to a pitched roof . (As amended by additional bat survey received17 July 2018 and 10 Setember 2018. Amended plans received 17 September 2018 changing the proposed design of the roof alterations. As amended by plan numbers 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 and 11) (Further amended plans received 27 September numbers 2, 10, 8, 7 and 9 omitting first floor side window and proposing front extension)
Loft conversion and changing flat roof to a pitched roof . (As amended by additional bat survey received17 July 2018 and 10 Setember 2018. Amended plans received 17 September 2018 changing the proposed design of the roof alterations. As amended by plan numbers 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 and 11) (Further amended plans received 27 September numbers 2, 10, 8, 7 and 9 omitting first floor side window and proposing front extension)
Reference
P18/V0182/HH
Agent
Mr D Roy
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.