The generation of hydro electricity from the River Thames using two Archimedes screws. In addition the site will have publicly accessible observation platform and a fish pass in the form of a meandering stream. The land has a public footpath (which will be retained) but it does not currently have any other use.(Amendment to P13/V1315/FUL)
The generation of hydro electricity from the River Thames using two Archimedes screws. In addition the site will have publicly accessible observation platform and a fish pass in the form of a meandering stream. The land has a public footpath (which will be retained) but it does not currently have any other use.(Amendment to P13/V1315/FUL)
Reference
P15/V2335/FUL
Agent
Dr R Riggs
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.