Council planning record
Land North of Ffordd Bro Tathan, St. Athan
Last published check: 30 Sept 2026, 11:59. Check the council record for more recent changes.
Land North of Ffordd Bro Tathan, St. Athan
This record has no verified map location.
Demolition of existing buildings/structures and erection of a Class B8 data centre with all associated back-up generators, plant, equipment, sub-stations, accesses, parking and servicing areas, drainage and engineering works including services diversion/connection and regrading works
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Ground Investigation Report Addendum (Ramboll April 2023)Supporting Documents | 24 Jul 2023 | View |
| Delineation Environmental Investigation (Ramboll, July 2023)Supporting Documents | 24 Jul 2023 | View |
| Remediation Options Appraisal (Ramboll, July 2023)Supporting Documents | 24 Jul 2023 | View |
| Ecological Impact Assessment (Ramboll, July 2023) Appendix 6 - Reptile Survey ReportSupporting Documents | 24 Jul 2023 | View |
| Ecological Impact Assessment (Ramboll, July 2023) Appendix 7 - Breeding Bird Survey ReportSupporting Documents | 24 Jul 2023 | View |
| Ecological Impact Assessment (Ramboll, July 2023) Appendix 8 - Survey of InvertebratesSupporting Documents | 24 Jul 2023 | View |
| Ecological Impact Assessment (Ramboll, July 2023)Supporting Documents | 24 Jul 2023 | View |
| Response to NRW Advice (Dormice) (Ramboll 10 Aug 2023)Supporting Documents | 10 Aug 2023 | View |
| Dormouse Conservation Strategy (Arup 3, August 2023)Supporting Documents | 10 Aug 2023 | View |
| Preliminary Ecological Appraisal (Ramboll, Feb 22)Supporting Documents | 18 Sept 2023 | View |
| Radiological Remediation Report St Athan (Aurora, 29/9/2023)Supporting Documents | 2 Oct 2023 | View |
| Ecological Impact Assessment (Ramboll September 2023) Appendix 9 - Landscape Strategy & Planting PlanSupporting Documents | 24 Jul 2023 | View |
| PAC Appendix - see email from agent 15/3/24 NRW_Contaminated Land DAS Response_July2023Supporting Documents | 13 Oct 2023 | View |
| Flooding - Techncial Note - Response to VOG Drainage Comments (Ramboll, 23 October 2023)Supporting Documents | 26 Oct 2023 | View |
| NRW Resposne on PFAS (Ramboll, October 2023)Supporting Documents | 30 Oct 2023 | View |
| Remediation Next Steps:PFAS Soil Sampling Redacted (Ramboll, October 2023)Supporting Documents | 25 Oct 2023 | View |
| Landscape - Technical Note - Response to Vale of Glamorgan Landscape Comments (14th Nove 23)Supporting Documents | 27 Nov 2023 | View |
| Email from agent re Shift Patterns - Staff Training Function (2nd February 2024)Supporting Documents | 2 Feb 2024 | View |
| 240313 Revised Plans Cover LetterSupporting Documents | 13 Mar 2024 | View |
| Design and Access Statement (Burns McDonnell, Revision P04 - 1st March 2024) Cwl2 Dc Xx G021 P04 Bmd Das Part 2Supporting Documents | 13 Mar 2024 | View |
| Design and Access Statement (Burns McDonnell, Revision P04 - 1st March 2024) Cwl2 Dc Xx G021 P04 Bmd Das Part 3Supporting Documents | 13 Mar 2024 | View |
| Design and Access Statement (Burns McDonnell, Revision P04 - 1st March 2024) Cwl2 Dc Xx G021 P04 Bmd Das Part 4Supporting Documents | 13 Mar 2024 | View |
| Design and Access Statement (Burns McDonnell, Revision P04 - 1st March 2024) Cwl2 Dc Xx G021 P04 Bmd Das Part 5Supporting Documents | 13 Mar 2024 | View |
| Habitat Management Plan (Ramboll, November 2023)Supporting Documents | 13 Mar 2024 | View |
| PFAS Soil Stabilisation /Solidification Literature Review (Ramboll, 14.2.24)Supporting Documents | 13 Mar 2024 | View |
| Addendum to Dormouse Conservation Strategy and Response to Comments (NRW-Ecology) – Rev B REDACTEDSupporting Documents | 1 May 2024 | View |
| Remediation Strategy Pt 1 (Ramboll April 2024)Supporting Documents | 3 May 2024 | View |
| Remediation Strategy Pt2 (Ramboll April 2024)Supporting Documents | 3 May 2024 | View |
| Bro Tathan FTA - High Level Interpretation of Additional GI Analytical Data (Tetra Tech 09 February 2024)Supporting Documents | 8 May 2024 | View |
| Ground Investigation Report (Ramboll, June 2022)Supporting Documents | 24 Jul 2023 | View |
| Redacted - S094701-1 - Bat LicenceSupporting Documents | 15 Nov 2024 | View |
| CWL2-DR-ZZ-AP900-BMD P02 - Isometric 3D Views - Overall SitePlan | 24 Jul 2023 | View |
| Council's SRS (Environment Team) (2023))Consultee Response | 18 Aug 2023 | View |
| South Wales Fire and Rescue Service (2023)Consultee Response | 22 Aug 2023 | View |
| Llantwit Major Town Council (2023)Consultee Response | 24 Aug 2023 | View |
| South Wales Police (2023)Consultee Response | 25 Aug 2023 | View |
| Council's Highways (August 2023)Consultee Response | 30 Aug 2023 | View |
| SRS (Pollution) (2023)Consultee Response | 6 Sept 2023 | View |
| Dwr Cymru-Welsh Water (September 2023)Consultee Response | 8 Sept 2023 | View |
| SRS Pollution - Air Quality (2023)Consultee Response | 8 Sept 2023 | View |
| GGAT (2023)Consultee Response | 13 Sept 2023 | View |
| Council's Ecology Comments (September 2023)Consultee Response | 18 Sept 2023 | View |
| Council's Higways - Transport Assessment Review_V2 Final (By Link September 2023)Consultee Response | 21 Sept 2023 | View |
| SRS Environment (Update October 2023)Consultee Response | 3 Oct 2023 | View |
| Council's Drainage (2023)Consultee Response | 4 Oct 2023 | View |
| NRW (2023)Consultee Response | 5 Oct 2023 | View |
| SRS (Pollution) (2023)Consultee Response | 6 Oct 2023 | View |
| Council's Landscape Officer (2023)Consultee Response | 27 Oct 2023 | View |
| Council's Public Rights of Way Section (2023)Consultee Response | 27 Oct 2023 | View |
| SRS (Environment) (Oct 31 Update) - No further commentsConsultee Response | 31 Oct 2023 | View |
| Council's Ecology Comments (Nov 8th update)Consultee Response | 9 Nov 2023 | View |
| Council's Ecology (14 November 2023)Consultee Response | 14 Nov 2023 | View |
| MOD (15 November 2023)Consultee Response | 15 Nov 2023 | View |
| Council's Drainage Section (16/11/2023)Consultee Response | 17 Nov 2023 | View |
| NRW (5 December 2023)Consultee Response | 5 Dec 2023 | View |
| Council Highways (February 2024)Consultee Response | 8 Feb 2024 | View |
| Council's Drainage Section (February 2024)Consultee Response | 9 Feb 2024 | View |
| Western Power (2024)Consultee Response | 15 Mar 2024 | View |
| SRS (Environment) (March 2024)Consultee Response | 26 Mar 2024 | View |
| SW Police (March 2024)Consultee Response | 26 Mar 2024 | View |
| Llantwit Major Town Council (March 2024)Consultee Response | 28 Mar 2024 | View |
| Council's Heritage Section (March 2024)Consultee Response | 27 Mar 2024 | View |
| Welsh Water Consult (April 2024)Consultee Response | 4 Apr 2024 | View |
| SRS (Environment) (5 April 2024)Consultee Response | 5 Apr 2024 | View |
| Council's Ecologist (April 2024)Consultee Response | 8 Apr 2024 | View |
| South Wales Fire and Rescue Services (15 April 2024)Consultee Response | 15 Apr 2024 | View |
| Heneb (Formerly Glamorgan Gwent Archaeological Trust)Consultee Response | 18 Apr 2024 | View |
| Council's Drainage Section (25 04 2024)Consultee Response | 25 Apr 2024 | View |
| Council's Ecologist (1/5/2024)Consultee Response | 1 May 2024 | View |
| Council's Highways Section (May 2024)Consultee Response | 2 May 2024 | View |
| NRW (May 2024)Consultee Response | 20 May 2024 | View |
| Council's Landscape Officer (May 2024)Consultee Response | 28 May 2024 | View |
| CADWConsultee Response | 6 Jun 2024 | View |
| 16 Millands Caravan Park, LlanmaesNeighbour Response | 21 Aug 2023 | View |
| Tithe Barn PicketstonNeighbour Response | 29 Aug 2023 | View |
| Old Barn , Picketston , Barry, Vale of Glamorgan , CF62 4QPNeighbour Response | 29 Aug 2023 | View |
| Forge Cottage, Picketston,Neighbour Response | 31 Aug 2023 | View |
| 2 PicketstonNeighbour Response | 31 Aug 2023 | View |
| Millands Farm, Llanmaes, Llantwit MajorNeighbour Response | 25 Sept 2023 | View |
| ApplicationformApproved Details | 24 Jul 2023 | View |
| APPROVED Heritage Statement (Tetra Tech, July 2023)Approved Details | 24 Jul 2023 | View |
| APPROVED Sustainability & Energy Statement (Hoare Lea, July 2023) - Stage 3 Report Rev 2Approved Details | 24 Jul 2023 | View |
| APPROVED Sustainability - Stage 3 Report - Part L2Approved Details | 24 Jul 2023 | View |
| APPROVED Flooding - Bro Tathan Bund Relocation Modelling Technical Note (Ramboll 31st May 2023 V3)Approved Details | 24 Jul 2023 | View |
| APPROVED Pre-Application Consulation (PAC) Report - redactedApproved Details | 24 Jul 2023 | View |
| APPROVED Planning Statement (July 2023)Approved Details | 24 Jul 2023 | View |
| APPROVED Trees - Arboricultural Impact Assessment (DTS, July 2023)Approved Details | 24 Jul 2023 | View |
| APPROVED Trees - Arboricultural Method Statement (DTS, April 2023)Approved Details | 24 Jul 2023 | View |
| APPROVED Archaeological & Heritage Desk-Based Assessment (Tetra Tech, July 2023)Approved Details | 24 Jul 2023 | View |
| APPROVED Flood Consequences Assessment (Ramboll, May 2023)Approved Details | 24 Jul 2023 | View |
| APPROVED Noise Impact Assessment (Ramboll, July 2023)Approved Details | 24 Jul 2023 | View |
| APPROVED Phase 1 - Environmental Site Assessment (Ramboll, July 2023)Approved Details | 24 Jul 2023 | View |
| APPROVED Phase 2 - Environmental Site Assessment (Ramboll, July 2023)Approved Details | 24 Jul 2023 | View |
| APPROVED Air Quality Assessment (Ramboll, July 2023)Approved Details | 24 Jul 2023 | View |
| APPROVED Landscape & Visual Appraisal (Ramboll, July 2023)Approved Details | 24 Jul 2023 | View |
| APPROVED Drainage Strategy Report (Burroughs, June 2023)Approved Details | 24 Jul 2023 | View |
| APPROVED Assessment of Potential Flow Capacity (Burroughs, 2 May 2023) TN-230502 Technical Note – Separation of Utilities - redactedApproved Details | 29 Aug 2023 | View |
| APPROVED LVIA Appendix 2 - Figure_1_Landscape character and featuresApproved Details | 6 Sept 2023 | View |
| APPROVED LVIA Appendix 2 - Figure_2_Visual_Amenity and Viewpoint LocationApproved Details | 6 Sept 2023 | View |
| APPROVED Transport Assessment (Ramboll October 2023 )Approved Details | 13 Oct 2023 | View |
| APPROVED Flooding - WHS1938 Appendix ii - Bro Tathan Bund Relocation Modelling TechnIical Note (Ramboll, 31 May 2023) - Appendix 2 - Bund design including 100yrCC flood levels.pdfApproved Details | 25 Oct 2023 | View |
| APPROVED Flooding - WHS1701 St Athan pluvial model updates v1 (By WHS March 2020)Approved Details | 25 Oct 2023 | View |
| APPROVEDFlooding - WHS1938 Bro Tathan Bund Relocation Modelling Addendum v1.0 (By Ramboll October 23)Approved Details | 25 Oct 2023 | View |
| APPROVED Sustainability Note (Carney Sweeney Received November 2023)Approved Details | 3 Nov 2023 | View |
| APPROED Drainage - Ramboll response to VoG Drainage Response No.2 (20th December 2023)Approved Details | 5 Jan 2024 | View |
| approved Design and Access Statement (Burns McDonnell, Revision P04 - 1st March 2024) Cwl2 Dc Xx G021 P04 Bmd Das Part 1Approved Details | 13 Mar 2024 | View |
| APPROVED Framework Travel Plan (Tetra Tech, February 2024)Approved Details | 13 Mar 2024 | View |
| APPROVED Geophysical Survey (Headland Archaeology, December 2022);Approved Details | 13 Mar 2024 | View |
| APPROVED Green Infrastructure Statement (Ramboll, March 2024)Approved Details | 13 Mar 2024 | View |
| APPROVED Lighting Calculations (Burns McDonnell, March 2024)Approved Details | 13 Mar 2024 | View |
| APPROVED Outline CEMP (Ramboll, March 2024)Approved Details | 13 Mar 2024 | View |
| APPROVED Precautionary Method of Working (Ramboll, 11.1.24)Approved Details | 13 Mar 2024 | View |
| APPROVED Written Scheme of Investigation: Historic Building Recording (Tetra Tech, February 2024)Approved Details | 13 Mar 2024 | View |
| APPROVED Written Scheme of Investigation: Trial Trench Evaluation (Tetra Tech, March 2024)Approved Details | 13 Mar 2024 | View |
| APPROVED Written Scheme of Investigation: Watching Brief (Tetra Tech, March 2024)Approved Details | 13 Mar 2024 | View |
| APPROVED St Athan Northern Access Road, FCA (Aecom, March 2017)Approved Details | 25 Oct 2023 | View |
| APPROVED Public Art - Vantage Bro Tathan Public Art (April 2024)Approved Details | 18 Apr 2024 | View |
| APPROVED LVIA Appendix 3 - Images - Viewpoint 3Approved Details | 23 Apr 2024 | View |
| Decision NoticeApproved Details | 15 Aug 2024 | View |
| Final ReportApproved Details | 15 Aug 2024 | View |
| Version 4 Decision NoticeApproved Details | 7 May 2025 | View |
| APPROVED CWL21-DR-ZZ-AP210-BMB P02 - General Arrangement Elevations - Phase 2Approved Plans | 24 Jul 2023 | View |
| APPROVED CWL21-DR-ZZ-AP220-BMD P02 - Proposed Material MatrixApproved Plans | 24 Jul 2023 | View |
| APPROVED CWL2-DR-ZZ-AP900-BMD P02 - Isometric 3D Views - Overall SiteApproved Plans | 24 Jul 2023 | View |
| APPROVED CWL2-DR-ZZ-AP410-BMD P02 - Substation - Plan & ElevationsApproved Plans | 24 Jul 2023 | View |
| APPROVED CWL2-DR-ZZ-AP420-BMD P01 - 25MVA Switchroom - Plan & ElevationsApproved Plans | 24 Jul 2023 | View |
| APPROVED CWL2-DR-ZZ-AP430-BMD P01 - Sprinkler Tanks - Plan & ElevationsApproved Plans | 24 Jul 2023 | View |
| APPROVED CWL21.1-DR-ZZ-AP200-BMB P02 - General Arrangement Elevations - Phase 1Approved Plans | 24 Jul 2023 | View |
| APPROVED C-0105 - Existing Site LayoutApproved Plans | 24 Jul 2023 | View |
| APPROVED C-2700 - Existing Services General ArrangementApproved Plans | 24 Jul 2023 | View |
| APPROVED LVIA Appendix 3 - ImagesApproved Plans | 8 Sept 2023 | View |
| APPROVED 22.5669.1.TAP - Tree Appraisal PlanApproved Plans | 18 Sept 2023 | View |
| APPROVED 1620012263-RAM-ZZ-00-DR-C-00401 Rev P01- Typical Drainage Detail Sheet 01Approved Plans | 2 Oct 2023 | View |
| APPROVED 1620012263-RAM-ZZ-00-DR-C-00451 Rev P02 - Proposed Filter Drainage and Longsection Sheet 01Approved Plans | 2 Oct 2023 | View |
| APPROVED 1620012263-RAM-ZZ-00-DR-C-00452 Rev P01 - Drainage Long Section Sheet 02Approved Plans | 2 Oct 2023 | View |
| APPROVED 1620012263-RAM-ZZ-00-DR-C-00453 Rev P01 - Drainage Cross Section Sheet 01Approved Plans | 2 Oct 2023 | View |
| APPROVED 1620012263-RAM-ZZ-00-DR-C-00101 Rev P03- Proposed Drainage General Arrangement Sheet 01Approved Plans | 21 Dec 2023 | View |
| APPROVED 1620012263-RAM-ZZ-00-DR-C-00102 Rev P02 - Proposed Drainage General Arrangement Sheet 02Approved Plans | 21 Dec 2023 | View |
| APPROVED 1620012263-RAM-ZZ-00-DR-C-00402 Rev P02- Typical Drainage Detail Sheet 02Approved Plans | 21 Dec 2023 | View |
| APPROVED 50685 Bur Gen Xx Dr C 0350 Proposed fencing - Pumping StationApproved Plans | 13 Mar 2024 | View |
| APPROVED 50685 Bur Gen Xx Dr C 0501 Proposed sw drainage layout Rev P5 - Pumping StationApproved Plans | 13 Mar 2024 | View |
| APPROVED 50685 Bur Gen Xx Dr C 0701 Vehicle tracking layout Rev P4 - Pumping StationApproved Plans | 13 Mar 2024 | View |
| APPROVED 50685 Bur Gen Xx Dr C 0720 Proposed site sections Rev P3 - Pumping StatinApproved Plans | 13 Mar 2024 | View |
| APPROVED 50685 Bur Gen Xx Dr C 0730 Proposed site elevations Rev P1 - Pumping StationApproved Plans | 13 Mar 2024 | View |
| APPROVED Cwl2 Dr Zz Ap400 Bmd Security Kiosk Rev P03Approved Plans | 13 Mar 2024 | View |
| APPROVED Cwl2 Dr Zz Ap910 Bmd Cgi Perspective Views Rev P3Approved Plans | 13 Mar 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 0001 Location Plan Rev P2Approved Plans | 13 Mar 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 0120 Sections Sh1 Rev P2Approved Plans | 13 Mar 2024 | View |
| APPROVEDCwl21 Bur Ws3 Sp Dr C 0121 Sections Sh2 Rev P2Approved Plans | 13 Mar 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 0122 Sections Sh3 Rev P2Approved Plans | 13 Mar 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 0350 Fencing Details Rev P2 - Sheet 1 of 2Approved Plans | 13 Mar 2024 | View |
| APPROVED - Cwl21 Bur Ws3 Sp Dr C 0351 Fencing Details Rev P2 - Sheet 2 of 2Approved Plans | 13 Mar 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 0560 Pumping Station Details Rev P2Approved Plans | 13 Mar 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 0610 Earthworks Sections Rev P2Approved Plans | 13 Mar 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 0620 Earthworks Sections Sh1 Rev P2Approved Plans | 13 Mar 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 0621 Earthworks Sections Sh2 Rev P2Approved Plans | 13 Mar 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 0622 Earthworks Sections Sh3 Rev P2Approved Plans | 13 Mar 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 0623 Earthworks Sections Sh4 Rev P2Approved Plans | 13 Mar 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 0701 Road Pavement P02Approved Plans | 13 Mar 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 0720 Geometry Cross Sections Rev P2Approved Plans | 13 Mar 2024 | View |
| APPROVED Cwl21 Dr 00 Ap100 Bmd Ga Plan Ground Floor Rev P3Approved Plans | 13 Mar 2024 | View |
| APPROVED Cwl21 Dr 01 Ap101 Bmd Ga Plan First Floor Rev P3Approved Plans | 13 Mar 2024 | View |
| APPROVED Cwl21 Dr 02 Ap102 Bmd Ga Plan Roof Level Rev P3Approved Plans | 13 Mar 2024 | View |
| APPROVED Cwl21 Dr 03 Ap103 Bmd Ga Plan Chiller Deck Level Rev P3Approved Plans | 13 Mar 2024 | View |
| APPROVED Cwl21 Dr Zz Ap300 Bmd Building Sections A, B, C Rev P3Approved Plans | 13 Mar 2024 | View |
| APPROVED Cwl21 Tir Ws3 Sp Dr L 0100 Landscape Strategy Rev P3Approved Plans | 13 Mar 2024 | View |
| APPROVED Cwl21 Tir Ws3 Sp Dr L 0101 Planting Plan Rev P3Approved Plans | 13 Mar 2024 | View |
| APPROVED Cwl21 Tir Ws3 Sp Dr L 0102 Landscape Specification Rev P2Approved Plans | 13 Mar 2024 | View |
| APPPROVED Cwl21 Tir Ws3 Sp Dr L 0103 Tree Pits Rev P1Approved Plans | 13 Mar 2024 | View |
| APPROVED Dts22.5669.7.TPP Tree Protection Plan Rev 7Approved Plans | 13 Mar 2024 | View |
| APPROVED CWL21-BMD-WS3-SP-DR-E-1401-SITE LIGHTING - LIGHTSPILL PLAN Rev P2Approved Plans | 13 Mar 2024 | View |
| APPROVED - Cwl21 Bur Ws3 Sp Dr C 0104 Phasing plan Rev P4Approved Plans | 2 Apr 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 0300 Proposed Fencing Rev P3Approved Plans | 2 Apr 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 0505 Foulwaterdrainage P4Approved Plans | 2 Apr 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 0512 Surfacewaterbasinssh1 P3Approved Plans | 2 Apr 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 0513 Surfacewaterbasinssh2 Rev P3Approved Plans | 2 Apr 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 0601 Proposed contours P3Approved Plans | 2 Apr 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 0604 Isopachyte Rev P3Approved Plans | 2 Apr 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 0700 Geometry arrangement P3Approved Plans | 2 Apr 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 0707 Hgv arrangement P3Approved Plans | 2 Apr 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 0708 Cranearrangement P3Approved Plans | 2 Apr 2024 | View |
| APPROVEDCwl21 Bur Ws3 Sp Dr C 0709 Firetruckarrangement P3Approved Plans | 2 Apr 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 1100 Kerbs&pavedareas P5Approved Plans | 2 Apr 2024 | View |
| APPROVED 50685 Bur Gen Xx Dr C 0101 Proposed site layout S4 P7.0Approved Plans | 2 Apr 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 0100 General arrangement P4Approved Plans | 2 Apr 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 0101 Phase 1general arrangement P3Approved Plans | 2 Apr 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 0103 Blockplan P3Approved Plans | 2 Apr 2024 | View |
| APPROVED CWL21-BUR-WS3-SP-DR-C-0500 Rev P4 Surface Water DrainageApproved Plans | 23 Apr 2024 | View |
| APPROVED RAM-CWL2-XX-SK-C-00007-Proposed Crossing General Arrangement - Toucan CrossingApproved Plans | 23 Apr 2024 | View |
| APPROVED CWL21.1-BMD-WS3-SP-DR-E-1400 Rev P2 SITE LIGHTING PLAN (dated 26/04/2024)Approved Plans | 23 Apr 2024 | View |
| APPROVED Cwl21 Bur Ws3 Sp Dr C 0200 Rev P2 Site Clearance General ArrangementApproved Plans | 3 May 2024 | View |
| APPROVED CWL21-BUR-WS3-SP-DR-C-0102-SITE BOUNDARY Rev 4Approved Plans | 17 May 2024 | View |
| Signed Section 106 - REDACTEDSection 106 Legal Agreement | 14 Aug 2024 | View |
| Site NoticeSite Notice_202300780FUL.docx | 24 Aug 2023 | View |
| Site NoticeSite Notice_202300780FUL(1).docx | 27 Sept 2023 | View |
| Archaeological & Heritage Desk-Based AssessmentDO NOT EXPORT | 24 Jul 2023 | View |
| Press Advert - 24 August, 2023Press Advert | 24 Aug 2023 | View |
| CSUPERSEDED CWL2-DR-ZZ-AP910-BMD P02 - CGI Perspective ViewsSuperseded Details | 24 Jul 2023 | View |
| SUPERSEDED Design & Access Statement 1Superseded Details | 24 Jul 2023 | View |
| SUPERSEDED DAS 2 - Site & Context AnalysisSuperseded Details | 24 Jul 2023 | View |
| SUPERSEDED DAS 3 - Design ProposalSuperseded Details | 24 Jul 2023 | View |
| SUPERSEDED DAS 4 - Design ProposalSuperseded Details | 24 Jul 2023 | View |
| SUPERSEDED DAS 5 - Design Proposal, Access and Movement, LandscapeSuperseded Details | 24 Jul 2023 | View |
| SUPERSEDED Transport Assessment (Ramboll July 2023)Superseded Details | 24 Jul 2023 | View |
| SUPERSEDED see email from agent 15/3/24 Transport Infrastructure Briefing Note (Ramboll September 2023)Superseded Details | 22 Sept 2023 | View |
| SUPERSEDED Flooding - Bro Tathan Flood Bund -Operational and Maintenance PlanSuperseded Details | 2 Oct 2023 | View |
| SUPERSEDED 1620012263-RAM-ZZ-00-DR-C-00402 Rev P01- Typical Drainage Detail Sheet 02Superseded Details | 2 Oct 2023 | View |
| SUPERSEDED - see email from agent 15/3/24 - Response to VoG Comments (Ecology)_v2 (September 2023)Superseded Details | 13 Oct 2023 | View |
| SUPERSEDED see email from agent 15/3/24Transport Assessment Review - Response ScheduleSuperseded Details | 13 Oct 2023 | View |
| SUPERSEDED see email from agent 15/3/24Transport Infrastructure Briefing Note (October 2023)Superseded Details | 13 Oct 2023 | View |
| SUPERSEDED - see email from agent 15/3/24 Ramboll Response to Link Transport Asessment Review (19th December 2023)Superseded Details | 21 Dec 2023 | View |
| SUPERSEDED Addendum to Dormouse Conservation Strategy and Response to Comments (Ramboll, 14.2.24)Superseded Details | 13 Mar 2024 | View |
| Cwl21 Bur Ws3 Sp Dr C 0001 Location PlanSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED Cwl21 Bur Ws3 Sp Dr C 0103 Block PlanSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED CWL21-DR-00-AP100-BMD P02 - General Arrangement Plan - Ground FloorSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED CWL21-DR-01-AP101-BMB P02 - General Arrangement Plan - First FloorSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED CWL21-DR-02-AP102-BMD P02 - General Arrangement Plan - Roof LevelSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED CWL21-DR-00-AP103-BMB P02 - General Arrangement Plan - Chiller Deck LevelSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED CWL21-DR-ZZ-AP300-BMD P02 - Building Sections A, B & CSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED CWL21-TIR-WS3-SP-DR-L-0100_LANDSCAPE STRATEGYSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED CWL21-TIR-WS3-SP-DR-L-0101_PLANTING PLANSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED Landscape Specification L102Superseded Plans | 24 Jul 2023 | View |
| SUPERSEDED CWL21.1-DR-ZZ-AP200-BMD P02 - General Arrangement Elevations - Phase 1Superseded Plans | 24 Jul 2023 | View |
| SUPERSEDED 22.5669.1.TPP Rev 5 - Tree Protection PlanSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED CWL2-DR-ZZ-AP400-BMD P02 - Security Kiosk - Plan & ElevationsSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED CWL2-DR-ZZ-AP910-BMD P02 - CGI Perspective ViewsSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED 1400 - Site Lighting PlanSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED Lighting Calculations - CWL21-BMD-WS3-XX-CL-E-0009Superseded Plans | 24 Jul 2023 | View |
| SUPERSEDED C-0100 - Scheme Overview General ArrangementSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED C-0102 - Site Boundary General ArrangementSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED C-0104 - Phase PlanSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED C-0200 - Site Clearance General ArrangementSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED C-0300 - Proposed Fencing General ArrangementSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED C-0350 - Proposed Fencing Standard Details Sheet 1 of 2Superseded Plans | 24 Jul 2023 | View |
| SUPERSEDED C-0351 - Proposed Fencing Standard Details Sheet 2 of 2Superseded Plans | 24 Jul 2023 | View |
| SUPERSEDED C-0500 - Proposed Surface Water Drainage General ArrangementSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED C-0505 - Proposed Foul Water Drainage General ArrangementSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED C-0560 - Proposed Pumping Station SectionsSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED C-0610 - Proposed Earthworks SectionsSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED C-0701 - Proposed Road Pavement General ArrangementSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED C-0707 - HGV Vehicle Track Analysis General ArrangementSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED C-0708 - Crane Vehicle Track Analysis General ArrangementSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED C-0709 - Fire Truck Vehicle Track Analysis General ArrangementSuperseded Plans | 24 Jul 2023 | View |
| SUPERSEDED C-1100 - Proposed Kerbs, Footways & Paved Areas General ArrangementSuperseded Plans | 24 Jul 2023 | View |
| CWL21-BUR-WS3-SP-DR-C-0001 Site Location PlanSuperseded Plans | 20 Sept 2023 | View |
| CWL21-BUR-WS3-SP-DR-C-0102 Site BoundarySuperseded Plans | 20 Sept 2023 | View |
| SUPERSEDED CWL21-BUR-WS3-SP-DR-C-0106 Proposed Usable Open SpaceAreas-GENERAL ARRANGEMENTSuperseded Plans | 20 Sept 2023 | View |
| SUPERSEDED CWL21-BMD-WS3-SP-DR-E-1401-SITE LIGHTING - LIGHTSPILL PLANSuperseded Plans | 22 Sept 2023 | View |
| SUPERSEDED 1620012263-RAM-ZZ-00-DR-C-00101 Rev P02- Proposed Drainage General Arrangement Sheet 01Superseded Plans | 2 Oct 2023 | View |
| SUPERSEDED 1620012263-RAM-ZZ-00-DR-C-00102 Rev P01 - Proposed Drainage General Arrangement Sheet 02Superseded Plans | 2 Oct 2023 | View |
| SUPERSEDED C-0100 P06 General ArrangementSuperseded Plans | 13 Oct 2023 | View |
| SUPERSEDED C-0102 P06 Site BoundarySuperseded Plans | 13 Oct 2023 | View |
| SUPERSEDED C-0103 P05 Block PlanSuperseded Plans | 13 Oct 2023 | View |
| SUPERSEDED C-0106 P01 Proposed Usable Open Space AreasSuperseded Plans | 13 Oct 2023 | View |
| SUPERSEDED C-0500 P06 Surface Water Drainage General ArranagementSuperseded Plans | 13 Oct 2023 | View |
| SUPERSEDED C-0300 P06 Fencing General ArrangementSuperseded Plans | 13 Oct 2023 | View |
| SUPERSEDED C-0500 P06 Surface Water Drainage General ArranagementSuperseded Plans | 13 Oct 2023 | View |
| SUPERSEDED C-0505 P06 Foul Water DrainageSuperseded Plans | 13 Oct 2023 | View |
| SUPERSEDED C-0701 P03 Road Pavement ArrangementSuperseded Plans | 13 Oct 2023 | View |
| SUPERSEDED C-0707 P04 HGV ArrangementSuperseded Plans | 13 Oct 2023 | View |
| SUPERSEDED C-0708 P04 Crane Vehicle TrackSuperseded Plans | 13 Oct 2023 | View |
| SUPERSEDED C-0709 P03 Fire Truck Vehicle TrackSuperseded Plans | 13 Oct 2023 | View |
| SUPERSEDED C-1100 P03 Kerbs & Paved Areas ArrangementSuperseded Plans | 13 Oct 2023 | View |
| SUPERSEDED Cwl21 Bur Ws3 Sp Dr C 0100 General Arrangement Rev P3Superseded Plans | 13 Mar 2024 | View |
| SUPERSEDED Cwl21 Bur Ws3 Sp Dr C 0101 Phase 1 Ga Rev P2Superseded Plans | 13 Mar 2024 | View |
| SUPERSEDED Cwl21 Bur Ws3 Sp Dr C 0102 Site Boundary Rev P2Superseded Plans | 13 Mar 2024 | View |
| SUPERSEDED Cwl21 Bur Ws3 Sp Dr C 0103 Block Plan Rev P2Superseded Plans | 13 Mar 2024 | View |
| SUPERSEDED Cwl21 Bur Ws3 Sp Dr C 0104 Phase Plan Rev P2Superseded Plans | 13 Mar 2024 | View |
| SUPERSEDED Cwl21 Bur Ws3 Sp Dr C 0300 Proposed Fencing Rev P2Superseded Plans | 13 Mar 2024 | View |
| SUPERSEDED Cwl21 Bur Ws3 Sp Dr C 0500 Surface Water Drainage Rev P2Superseded Plans | 13 Mar 2024 | View |
| SUPERSEDED Cwl21 Bur Ws3 Sp Dr C 0505 Foul Water Drainage Rev P3Superseded Plans | 13 Mar 2024 | View |
| SUPERSEDED Cwl21 Bur Ws3 Sp Dr C 0512 Surface Water Sh1 Rev P2Superseded Plans | 13 Mar 2024 | View |
| SUPERSEDED Cwl21 Bur Ws3 Sp Dr C 0513 Surface Water Sh2 Rev P2Superseded Plans | 13 Mar 2024 | View |
| SUPERSEDED Cwl21 Bur Ws3 Sp Dr C 0601 Proposed Contours Rev P2Superseded Plans | 13 Mar 2024 | View |
| SUPERSEDED Cwl21 Bur Ws3 Sp Dr C 0604 Formation Isopachyte Rev P2Superseded Plans | 13 Mar 2024 | View |
| SUPERSEDED Cwl21 Bur Ws3 Sp Dr C 0700 Geometry Arrangement Rev P2Superseded Plans | 13 Mar 2024 | View |
| SUPERSEDED Cwl21 Bur Ws3 Sp Dr C 0707 Hgv Vehicle Track P2Superseded Plans | 13 Mar 2024 | View |
| SUPERSEDED Cwl21 Bur Ws3 Sp Dr C 0708 Crane Vehicle Track P2Superseded Plans | 13 Mar 2024 | View |
| SUPERSEDED Cwl21 Bur Ws3 Sp Dr C 0709 Fire Truck Vehicle Track P2Superseded Plans | 13 Mar 2024 | View |
| SUPERSEDED Cwl21 Bur Ws3 Sp Dr C 1100 Kerbs & Paved Areas P3Superseded Plans | 13 Mar 2024 | View |
| SUPERSEDED CWL21-BMD-WS3-SP-DR-E-1400 - SITE LIGHTING PLAN Rev P3Superseded Plans | 13 Mar 2024 | View |
| SUPERSEDED 50685 Bur Gen Xx Dr C 0101 Proposed site layout Rev P6 - Pumping Station AccessSuperseded Plans | 13 Mar 2024 | View |
| Cwl21 Bur Ws3 Sp Dr C 0500 Surfacewaterdrainage P3Superseded Plans | 2 Apr 2024 | View |
| SUPERSEDED Cwl21 Bur Ws3 Sp Dr C 0102 Siteboundary P3Superseded Plans | 2 Apr 2024 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.