Council planning record

Non Material Amendment - Change in material / design of wall as original proposed recycled plastic unit wall could not meet the required 120 year design life stipulated by VOG Structures Engineer. The proposed concrete wall does meet this requirement, is used within the Highway industry and will still be efficient and economical to construct. The colour specified has been chosen to match the existing pedestrian subway entrance for aestheic reasons. The wall length and height will remain as per the original wall extents. Planning permission 2022/00278/RG3 - Transport interchange to integrate bus and rail travel. The transport interchange will utilise the existing council ground level car park area to the east of the Docks offices, creating a circulatory route for buses and taxis, with a central landscaped area with seating, cycle stands and allowing for potential cycle hub / cafe unit and 'Next-bikes' in the future (this would be a separate planning application). The scheme will also have secure cycle lockers and future proof for electric vehicle charging of both buses and taxis. New bus shelters with interactive displays, and new LED lighting to current standards will also be installed

Land at Dock Office, Barry Docks, Barry

ApprovedReference: 2022/00278/2/NMAVale of Glamorgan Council

Last published check: 3 Oct 2026, 20:41. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Committee Date

    Published milestoneCouncil source
  4. Decision Date

    Published milestoneCouncil source

Application summary

Status
Approved
Application type
Non material amendment
Received
8 Dec 2022
Validated
8 Dec 2022
Determination deadline
Not published
Local authority
Vale of Glamorgan Council

Application overview

Non Material Amendment - Change in material / design of wall as original proposed recycled plastic unit wall could not meet the required 120 year design life stipulated by VOG Structures Engineer. The proposed concrete wall does meet this requirement, is used within the Highway industry and will still be efficient and economical to construct. The colour specified has been chosen to match the existing pedestrian subway entrance for aestheic reasons. The wall length and height will remain as per the original wall extents. Planning permission 2022/00278/RG3 - Transport interchange to integrate bus and rail travel. The transport interchange will utilise the existing council ground level car park area to the east of the Docks offices, creating a circulatory route for buses and taxis, with a central landscaped area with seating, cycle stands and allowing for potential cycle hub / cafe unit and 'Next-bikes' in the future (this would be a separate planning application). The scheme will also have secure cycle lockers and future proof for electric vehicle charging of both buses and taxis. New bus shelters with interactive displays, and new LED lighting to current standards will also be installed

Proposal details

Reference
2022/00278/2/NMA
Ward
Castleland
Agent
Mr. Tony Cahill

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land at Dock Office, Barry Docks, Barry

This record has no verified map location.

Documents 7 of 7

DocumentPublishedAction
application form-redactedForms19 Dec 2022View
Approved--Retaining wall construction - BDI-AMEY-S1-ZZ-DR-C-2502 Retaining Wall Construction Details Rev.T01.1-A1 Frame.pdfApproved Details8 Dec 2022View
Approved-Retaining wall construction - Recycled-Plastics-L-Stone-Bank-RetainerApproved Details8 Dec 2022View
Approved-tobermore-specification-sheet-secura-grand.pdfApproved Details8 Dec 2022View
Approved-BDI-AMEY-S1-ZZ-DR-C-002 General Arrangement Rev.C01.1.pdfApproved Details10 Jan 2023View
Decision NoticeApproved Details12 Jan 2023View
Final NMA reportApproved Details12 Jan 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approved
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.