Consent was granted under application reference AT/2023/0008; however, the approved tree works were not undertaken.Ash T1 fell to near-ground level. The slender tree shows symptoms consistent with Ash Dieback (Hymenoscyphus fraxineus), including crown thinning, deadwood, and progressive structural decline.Sycamore T2 Fell. A Tree Preservation Order was made in 1984. The current dimensions suggest the tree became established after that date, so the proposed felling can be considered.Mixed species G1 Fell. A Tree Preservation Order was made in 1984. The current dimensions suggest the trees became established after that date, so the proposed felling can be considered.
24 Brunel Road Paignton TQ4 6HN
Torbay CouncilReference AT/2026/0247Works To Tree Within TPO
Last published check: 12 Nov 2026, 01:45. Check the council record for more recent changes.
Consent was granted under application reference AT/2023/0008; however, the approved tree works were not undertaken.Ash T1 fell to near-ground level. The slender tree shows symptoms consistent with Ash Dieback (Hymenoscyphus fraxineus), including crown thinning, deadwood, and progressive structural decline.Sycamore T2 Fell. A Tree Preservation Order was made in 1984. The current dimensions suggest the tree became established after that date, so the proposed felling can be considered.Mixed species G1 Fell. A Tree Preservation Order was made in 1984. The current dimensions suggest the trees became established after that date, so the proposed felling can be considered.
Reference
AT/2026/0247
Alternative references
PP-15225465
Ward
Churston With Galmpton
Agent
Mr Wojciech Rosinke
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.